| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | L1 | Accepted-AOC low rate | |
| 2 | L2₹26.1 L+₹1.3 L (5.04%)Rejected-Finance | L2 | Rejected-Finance Above rate |
| Sl No | Description | Qty | Unit | P.Sumalatha L2 | P.Palaniyammal L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and to the full depth as may be directed except hard rock not requiring blasting inclusive of shoring, shuttering and bailing of water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and compacted deposition the surplus earth in places shown by Departmental Officers with initial lead of 10 Meters and lift of 2 meters and clearing leveling the site etc., complete. TNDSS NO.23 & 24 VI (S2) | 161 | m3 | 346 ₹55,706 | 329.6 ₹53,065.6 Lowest |
| 2.00 | Cement concrete 1:5:10mix (one cement Five sand ten aggregate) using 40mm ISS gauge HBG metal for foundation including cost and conveyance of all materials and all labour charges for mixing, laying, ramming, curing concrete etc., complete as per standard specification. TNDSS NO.28 V, VI | 22 | m3 | 5,706 ₹1,25,532 | 5,434 ₹1,19,548 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Upto G.L | 157 | m2 | 721 ₹1,13,197 | 687.3 ₹1,07,906.1 Lowest |
| 4.00 | Above G.L | 138 | m2 | 985 ₹1,35,930 | 937.6 ₹1,29,388.8 Lowest |
| 5.00 | Plain Surface | 84 | m2 | 1,137 ₹95,508 | 1,082.5 ₹90,930 Lowest |
| 6.00 | Plain Cement Concrete 1:1.5:3 mix using 20mm size ISS gauge HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying, ramming, curing concrete etc., TNDSS NO. 24 | 204 | m3 | 7,742 ₹15,79,368 | 7,373 ₹15,04,092 Lowest |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1,790 | kg | 97 ₹1,73,630 | 91.85 ₹1,64,411.5 Lowest |
| 8.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 32 | m3 | 8,740 ₹2,79,680 | 8,323.6 ₹2,66,355.2 Lowest |
| 9.00 | Supply and Fixing B class GI Pipe incuding all charges and conveyance | 44 | m | 336 ₹14,784 | 320 ₹14,080 Lowest |
| 10.00 | Supply and Fiilling with excavated earth refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and compacted deposition the surplus earth in places shown by Departmental Officers with initial lead of 10 Meters and lift of 2 meters and clearing leveling the site etc., complete. | 115 | m3 | 48 ₹5,520 | 45.8 ₹5,267 Lowest |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
11 Feb 2026, 3:00 pmClosed
E O
Thevaram Town panchayat
Construction of Minor Bridge at Perambuvetti Odai in Ward 17 near Town panchayat office
2026_DTP_647962_1
362/2025
Open Tender
Civil Works
Works
180 days
Thevaram Town panchayat
As Per Tender Notice
3 documents required · 3 mandatory
₹0
₹30,000
Yes
Thevaram Town panchayat
14 Feb 2026
28 Jan 2026
11 Feb 2026
28 Jan 2026
11 Feb 2026
28 Jan 2026
28 Jan 2026 - 11 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and to the full depth as may be directed except hard rock not requiring blasting inclusive of shoring, shuttering and bailing of water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and compacted deposition the surplus earth in places shown by Departmental Officers with initial lead of 10 Meters and lift of 2 meters and clearing leveling the site etc., complete. TNDSS NO.23 & 24 VI (S2) | 161 | m3 | - | - |
| 2 | Cement concrete 1:5:10mix (one cement Five sand ten aggregate) using 40mm ISS gauge HBG metal for foundation including cost and conveyance of all materials and all labour charges for mixing, laying, ramming, curing concrete etc., complete as per standard specification. TNDSS NO.28 V, VI | 22 | m3 | - | - |
| 3 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Upto G.L | 157 | m2 | - | - |
| 4 | Above G.L | 138 | m2 | - | - |
| 5 | Plain Surface | 84 | m2 | - | - |
| 6 | Plain Cement Concrete 1:1.5:3 mix using 20mm size ISS gauge HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying, ramming, curing concrete etc., TNDSS NO. 24 | 204 | m3 | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1,790 | kg | - | - |
| 8 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 32 | m3 | - | - |
| 9 | Supply and Fixing B class GI Pipe incuding all charges and conveyance | 44 | m | - | - |
| 10 | Supply and Fiilling with excavated earth refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and compacted deposition the surplus earth in places shown by Departmental Officers with initial lead of 10 Meters and lift of 2 meters and clearing leveling the site etc., complete. | 115 | m3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.32 MB
BOQ_776835.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .