Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41,265.14Admitted-Finance | -16.00% | ₹41,265.14 | L1 | Admitted-Finance |
| 2 | L2₹49,616.42Admitted-Finance | +1.00% | ₹49,616.42 | L2 | Admitted-Finance |
Tender Value
₹49,000
Closing Date
19 Feb 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. of lane from H/O kulwant singh to H/O seema devi and others wno 6 ghatti
2026_RDPR_303064_13
e-NIT No.351/REW/K of 2025-26 Dated 13/02/2026 2nd call
Open Tender
Civil Works
30 days
BARNOTI
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
24 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA
Name of Work;- Const. of Lane from H/O Kulwant Singh to h/o Seema Devi and others w.no.6 Panchayat Forelain East Block Barnoti District Kathua under Development Scheme (CDS) (Jasrota Constituency) for the year 2025-26 ESTT AMOUNT 0.49 LACS
Contract NO:- MLACDF 2025-26
Name of the Bidder/ Bidding Firm / Company :
S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Providing and Laying in position R.B.M. ( River Bed Material) filling including braking of clods, watering , ramming etc 4.5 Cum 436 1000 Excess(+) Full Conversion INR
Earthwork excavation in all kinds of soil by manual or mechanical means (hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5 m in width or 10sqm on plan) inclu. Dressing of sides and rammings of bottoms,lift upto 1.5 mtr. Incl.disposal or fillings of excavated earth as per the directions of Engineer-in-charge 1.06 CUM 276.6 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering and shuttering including all leads, lifts and carriage of material by MT / H.L.-All work upto plinth level Dry stone aggregate 40mm nominal size) crushed 2.2 CUM 2500 1000 Excess(+) Full Conversion INR
1:3:6 (1 cement : 3 fine sand : 6 graded stone aggregate 20mm nominal size ) crushed SQM 1000 Excess(+) Full Conversion INR
Supply and supplying of boulder 0.4 CUM 937.9 1000 Excess(+) Full Conversion INR
Providing and laying 60 mm thick factary made cement concrete Interlocking Paver block of m 30 grade made by block making machine with strong vibratory compaction and of a approved size and design /shape laid in required colour pattern over and including 50 mm thick compacted bed of fine sand filling the joints with coarse sand etc. all complete as per direction of Eniggineer 27.88 sqm 816.15 1000 Excess(+) Full Conversion INR
Centering and shuttering of Formwork including strutting, propping etc. and removal of form work Foundations, footings, bases of columns etc. mass concrete. sqm 1000 Excess(+) Full Conversion INR
Sand, stone agg. below 40 mm nominal size by avg lead of 10 km s MT 4.24 Cum 279.04 1000 Excess(+) Full Conversion INR
Stone aggregate 40 mm nominal size and above by lead of 10 km by MT 2.13 Cum 279.04 1000 Excess(+) Full Conversion INR
Providing and fixing inauguration plaque made of polished granite stone, size 600 mm × 450 mm × 20 mm (or as approved), including machine-cut edges, fine polish, includinh high-quality gold paint (weather-resistant), complete with border design, cleaning, curing, and all finishing work. The plaque shall be fixed on a cement concrete pedestal/wall using stainless-steel clamps/adhesive, including all labour, materials, tools, transportation, and incidental charges to complete the job as per engineer-in-charge directions. 1 no 3000 1000 Excess(+) Full Conversion INR
Total in Figures Excess(+) Full Conversion INR
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.01 MB
BOQ_983602.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid