Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹13.8 L+₹862.23 (0.06%)Rejected-Finance | L2 | Rejected-Finance Above |
Tender Value
Refer Docs
EMD Value
₹13,966
Closing Date
18 Nov 2022, 4:00 pmClosed
Block Development Officer (V.P),Panchayat Union
Block Development Office (V.P),Panchayat Union
Deepening of konduchetti oorani with Retaining wall( 32 M), Bathing Ghat, Stone revertment( 45 M), Toewall (45 m) at Ramanujapuram Village and Panchayat
2022_RDTN_257260_1
B1/796/2022 10.10.2022
Open Tender
Civil Works
Works
90 days
Ramanujapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,966
Yes
Block Development Office (V.P),Panchayat Union
21 Nov 2022
19 Oct 2022
18 Nov 2022
19 Oct 2022
18 Nov 2022
19 Oct 2022
11 Nov 2022
Amount
Deepening of konduchetti oorani with Retaining wall( 32 M), Bathing Ghat, Stone revertment( 45 M), Toewall (45 m) @ Ramanujapuram Village
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete having width upto 3m
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VASANTHA CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_304258.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .