Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance JUNGLE SIKRI ALIAS KHORABAR THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | -0.47% | ₹11.6 L | L1 | Admitted-Finance |
| 2 | L2₹11.6 LAdmitted-Finance | -0.13% | ₹11.6 L | L2 | Admitted-Finance |
Tender Value
₹13.8 L
EMD Value
₹28,000
Closing Date
21 May 2026, 12:00 pmClosed
Ex.Ex.R.E.D. Vikas Bhawan Mau
Ex.Ex.R.E.D. Vikas Bhawan Mau
Parisadiya Prathmik Vidyalay Kalyanpur Ghosi mau ke Naveen Bhawan ke parisar me balak balika shauchalay block ka nirman.
2026_REDUP_1148711_1
34dt06.04.2026
Open Tender
Civil Works
90 days
MAU
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,016
₹28,000
6 Jun 2026
15 May 2026
21 May 2026
15 May 2026
21 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam clay, or sand ) including lift upto 1.5 m & lift up to 30.0 Mtr & including all to proper completion of work as per D.S.R 2.8.1 | 61.2 | Cum | 185.46 | ₹11,350.15 |
| 2 | Concrete with 4 cm gauge brick ballast fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floor including supply of all materials labour T & P etc. required for proper completion of the work. S.I.No.275 | 12.98 | Cum | 3,320.25 | ₹43,096.85 |
| 3 | Brick work in 1:6 cement and coarse sand above 2.25 F.M. mortar in foundation and plinth including supply of all materials,labour and t&p etc required for proper completion of the work. as perD.S.R. 6.1.2 | 20.31 | Cum | 5,081.56 | ₹1,03,206.48 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in 1:4 cement Coarse sand D.S.R 6.1.1 | 6.46 | sqm | 5,251.41 | ₹33,924.11 |
| 5 | Providing and laying R.C.C in 1:1.5:3 in cement coarse sand and grit all work upto plinth level excluding cost of centering, shuttering, and reinforcement as per D.S.R. 5.1.2 | 2.55 | cum | 6,444.88 | ₹16,434.44 |
| 6 | Centering and shuttering including strutting, propping removal in foundation and footing of column DSR 5.9.1 | 18.28 | sqm | 279.4 | ₹5,107.43 |
| 7 | Providing and laying R.C.C in 1:1.5:3 in cement coarse sand and grit in wall columns, struts and posts above plinth level excluding cost of centering, shuttering, and reinforcement as per D.S.R. 5.2.2 | 1.02 | cum | 7,732.47 | ₹7,887.12 |
| 8 | Centering and shuttering including removal in columns , pillars, posts abutment DSR 5.9.6 | 17.67 | cum | 684.9 | ₹12,102.18 |
| 9 | Providing and laying R.C.C in 1:1.5:3 in cement coarse sand and grit in wall slabs, beams, chajja, shelves, lintel , sill bands above plinth level excluding cost of centering, shuttering, and reinforcement as per D.S.R. 5.3 | 12.17 | sqm | 8,197.4 | ₹99,762.36 |
| 10 | Centering and shuttering including removal in lintels, beams, plinth beams , girders cantilever DSR 5.9.5 | 33.82 | sqm | 524.68 | ₹17,744.68 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Kalyanpurshauchalay.pdf
Tender Documents • 1.49 MB
BOQ_2150360.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid