Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance A 41 HIRALAL NAGAR NEAR DIXIT SWEETS SAROJINI NAGAR KANPUR ROAD LUCKNOW UTTAR PRADESH 226008 | LUCKNOW | UTTAR PRADESH | 226008 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹2.5 L (1.47%)Admitted-Finance | ₹1.7 Cr+₹2.5 L (1.47%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹19.4 L (11.5%)Admitted-Finance | ₹1.9 Cr+₹19.4 L (11.5%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹20.9 L (12.3%)Admitted-Finance | ₹1.9 Cr+₹20.9 L (12.3%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-For want of requisite work experience |
| Sl No | Description | Qty | Unit | Alliance Transcon Pvt. Ltd. L1 | COUNTRY CONSTRUCTION L3 | CEEKAY EPC PROJECTS PRIVATE LIMITED L4 | GUARDIAN ENGINEERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Part A (Km 18.00 to Km 25.421) | |||||||
| 1.01Laying of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor (18.00 to 25.421 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material: | |||||||
| 1.02 | 9Mtr. Long pole (ST-410 SP 33) | 26 | Nos. | 16,000 ₹4,16,000 Lowest | 18,000 ₹4,68,000 | 22,000 ₹5,72,000 | 19,000 ₹4,94,000 |
| 1.03 | 11 Mtr. Long pole (ST-410 SP 56) | 3 | Nos. | 30,000 ₹90,000 | 28,000 ₹84,000 | 27,000 ₹81,000 Lowest | 28,000 ₹84,000 |
| 1.04 | GI V cross-arm/Horizontal with top Bracket including clamp | 405 | Kg | 125 ₹50,625 Lowest | 150 ₹60,750 | 150 ₹60,750 | 142 ₹57,510 |
| 1.05 | GI Channel x-arm includingclaps and braces | 224 | Kg | 125 ₹28,000 Lowest | 150 ₹33,600 | 150 ₹33,600 | 142 ₹31,808 |
| 1.06 | 30 mm² ACSR Weasel Conductor | 4.5 | Km | 35,000 ₹1,57,500 Lowest | 45,000 ₹2,02,500 | 40,000 ₹1,80,000 | 43,000 ₹1,93,500 |
| 1.07 | PG Clamps for ACSR weasel conductor | 16 | Nos. | 50 ₹800 Lowest | 300 ₹4,800 | 120 ₹1,920 | 100 ₹1,600 |
| 1.08 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 78 | Nos. | 250 ₹19,500 | 500 ₹39,000 | 200 ₹15,600 Lowest | 300 ₹23,400 |
| 1.09 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 18 | Nos. | 275 ₹4,950 Lowest | 900 ₹16,200 | 500 ₹9,000 | 600 ₹10,800 |
Tender Value
Refer Docs
EMD Value
₹4.5 L
Closing Date
10 Dec 2022, 2:00 pmClosed
Executive Engineer JPDCL ED Kathua
Office of the Executive Engineer JPDCL ED Kathua
Shifting/Realignment of Electricial utilities for construction /widening of Road from Dayalachak to Ramkot(KM 0.00 to KM 25.421) by GREF on Turnkey Basis
2022_PDD_196637_1
KED/34 of 2022-23 Dt.18.11.2022
Open Tender
Electrical Works
Turn-key
180 days
kathua
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,000
Executive Engineer JPDCL ED Kathua
₹4.5 L
18 Mar 2023
19 Nov 2022
12 Dec 2022
19 Nov 2022
10 Dec 2022
19 Nov 2022
19 Nov 2022 - 26 Nov 2022
Amount
Part A (Km 18.00 to Km 25.421)
Laying of HT line on 9 Mtrs. ST poles with ACSR Weasel Conductor (18.00 to 25.421 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9Mtr. Long pole (ST-410 SP 33)
11 Mtr. Long pole (ST-410 SP 56)
GI V cross-arm/Horizontal with top Bracket including clamp
GI Channel x-arm includingclaps and braces
30 mm² ACSR Weasel Conductor
PG Clamps for ACSR weasel conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti Climbing Devices with clamps
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
Red oxide Paint
Aluminium Paints
Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole
Aluminium Jointing Sleeves
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Laying of HT & LT Line(3Phase Wire) on 11 Mtrs. ST poles with ACSR Weasel Conductor (18.00 to 25.421 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 Mtr. Long pole (ST-410 SP 56)
i) GI V cross-arm/Horizontal with top Bracket including clamp (289 Kg) ii) Angle and flate Iron for LT Brackets (168 Kg)
16 KN Shackle Insulator
GI Channel x-arm includingclaps and braces
30 mm² ACSR Weasel Conductor
PG Clamps for ACSR weasel conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti Climbing Devices with clamps
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
Red oxide Paint
Aluminium Paints
Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole
Aluminium Jointing Sleeves
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Laying of LT line on 8 Mtrs.ST poles with ACSR Weasel Conductor (18.00 to 25.421 Km) on 1 Phase 2 wire on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
8Mtr. Long pole (ST-410 SP 15)
GI U-Clamp for Shackle insulators
Shackle insulator 16 KN
30 mm² ACSR Weasel Conductor
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti climbing Devices with Clamp
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
Red Oxide Paint
Al Paint
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
Aluminium Jointing Sleeves
LT line Spacers
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Laying of LT line on 9 Mtrs.ST poles with ACSR Weasel Conductor (18.00 to 25.421 Km) on 3 Phase 4 wire on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9Mtr. Long pole (ST-410 SP 33)
GI U-Clamp for Shackle insulators
Shackle insulator 16 KN
30 mm² ACSR Weasel Conductor
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti climbing Devices with Clamp
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
Red Oxide Paint
Al Paint
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
Aluminium Jointing Sleeves
LT line Spacers
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Laying of LT line on 11 Mtrs.ST poles with ACSR Weasel Conductor (18.00 to 25.421 Km) 1 Phase 2 wire on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 Mtr. Long pole (ST-410 SP 56)
GI U-Clamp for Shackle insulators
Shackle insulator 16 KN
30 mm² ACSR Weasel Conductor
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti climbing Devices with Clamp
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
Red Oxide Paint
Al Paint
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
LT line Spacers
Erection of Guard Net (02 Spans) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
GI Channel X-arms including Clamps and braces
Galvanized Nuts and Bolts
GI Wire 6 SWG and 8 SWG
Eye Bolts
Erection of LT Cable 185mm2 alongwith Thimbles & LT Switch and Horn Gap on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 kV Horn Gap Fuse Set 3 Phase 200A
185 mm² Single core cable, 2 Ckt 1.1K V Grade, PVC Insulated Stranded Conductor FRLS type.
GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap
Galvinized Nuts and Bolts.
Pre fabricated LT Switch
Part B (Km 8.00 to Km 18.00)
Laying of 1 pole structure (29Nos. Locations ) LT road crossing on 11 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire at (08 to18 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 Mtr. Long pole (ST-410 SP 56)(02Poles per location)
i) Top GI Channel x-arm 100X50X6= 2 No= 1.65 Mtr ii) Guard netting M.S Angle 50X50X6= 2 No = 1.77 Mtr ii)Bracing M.S.Angel 50X50X6= 8 No = 1 Mtr vi) Clamps for belting & Braceing angel 50X8 =10 No (90Kgs per location)
GI U-Clamp for Shackle insulators (16nos. per location)
Shackle insulator 16 KN (16nos. per location)
30 mm² ACSR Weasel Conductor (.266km per location)
Galvanized Nuts and Bolts (8kgs per location)
Danger Plates with Clamp (02nos. per location)
Anti climbing Devices with Clamp (02nos. per location)
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip (02nos. per location)
Red Oxide Paint (01Ltr. per location)
Al Paint (01Ltr. per location)
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole (02nos. per location)
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete(02nos. per location)
GI wire for Guard Netting (40kgs per location)
Dismantling charges including carriage to Divisional store of LT road crossings 3 Phase 4 wire (08 to 18 Km) (01complete set at 29Nos. Locations
Laying of 2 Pole structure (13nos.Locations) HT Road Crossing on 11 Mtrs. ST poles with ACSR Weasel Conductor at(8.00 to 18.00 km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 Mtr. Long pole (ST-410 SP 56)(04Poles per location)
i) Top GI Channel x-arm 100X50X6= 4 No= 2.2 Mtr ii) Belting M.S Angle 50X50X6= 4 No = 1.77 Mtr iii)Bracing M.S.Angel 50X50X6= 4 No = 2.35 Mtr iv)Guard netting M.S.Angel 50X50X6= 2 No = 2.5 Mtr v)Clamps for belting&Braceing angel/channel 50X8 =24 No vi) GI Channel x-arm 100X50X6= 2 No= 1.65 Mtr vii) Bracing M.S.Angel 50X50X6= 2 No = 1 Mtr (242Kgs per location)
30 mm² ACSR Weasel Conductor(0.20Kms per location)
PG Clamps for ACSR weasel conductor (12Nos. Per location)
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (12Nos. Per location)
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm(06nos. Per location)
Galvanized Nuts and Bolts(8kgs per location)
Danger Plates with Clamp(02nos. Per location)
Anti Climbing Devices with clamps(04nos.per location)
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip(04nos per location)
Red oxide Paint (02ltr per location)
Aluminium Paints(02 ltr per location)
Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole (04nos per locations)
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete (04nos. Per location)
GI wire for Guard Netting (40kgs per location)
Dismantling charges including carriage to Divisional store of HT Structure Raod Crossing at (08 to 18 Km) (01complete set at 13Nos. Locations
Creation of sub station structure(04Nos.) for 63KVA DT Dismantlled at (8 to 18 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type (01set per Sub Station)
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A (01set per Sub Station)
70 mm² Single core cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type. (44Mtr per Sub Station)
9 Mtr. Long pole (PCC WL -300 KG) (02Poles per Sub Station)
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (03Nos.per Sub Station)
GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap(300Kgs per sub station)
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. (03Nos. per sub Station)
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (03Nos.per Sub Station)
LT Distribution Box for 63 KVA DTR with MCCB for incommer and SFU's for outgoing Ckt(01Nos.per Sub Station)
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete (02Nos.per sub station)
Wedege connectors /PG clamps
Danger plate witrh clamps (01Nos.per Sub Station)
GI Barbed wire for ani Clambing (15Kgs per Sub Station)
3 Ph 4 Wire Trivector meter with CT (01Nos.per Sub Station)
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole (02nos. per sub station)
Sundary items like Aluminium Lugs, Jumpers , binding tape(01No.per sub station)
Charges for Dismantling, carriage, erection and commissioning of old 63KVA DTs on new erected structure(complete Job)
Dismantling charges including carriage to Divisional store all the old sub station structure material at no cost(Complete Job)
Creation of sub station structure(01Nos.) for 100KVA DT Dismantlled at (8 to 18 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
70 mm² Single core cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type.
9 Mtr. Long pole (PCC WL -300 KG)
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. ( 4 Nos for Transformer and 1No. for Panel)
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
LT Distribution Box for 100 KVA DTR with MCCB for incommer and SFU's for outgoing Ckt
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Wedege connectors /PG clamps
Danger plate witrh clamps
GI Barbed wire for ani Clambing
3 Ph 4 Wire Trivector meter with CT
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
Sundary items like Aluminium Lugs, Jumpers , binding tape
Charges for Dismantling, carriage, erection and commissioning of old 100KVA DTs on newlt erected structure(Complete Job)
Dismantling charges including carriage to Divisional store all the old sub station structure material at no cost (Complete Job)
Laying of HT line on 9 Mtrs.PCC poles with ACSR Weasel Conductor at (8.00 to 18 Km) for 05Nos. DTs shifted on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9 Mtr. Long Pole(PCC WL-300 Kg )
GI V cross-arm/Horizontal with top Bracket including clamp
GI Channel x-arm includingclaps and braces
30 mm² ACSR Weasel Conductor
PG Clamps for ACSR weasel conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti Climbing Devices with clamps
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
Stone Pad (300mmx300 mmx75mm)
Aluminium Jointing Sleeves
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Laying of LT line on 8 Mtrs.PCC poles with ACSR Weasel Conductor 47 Mtr Span on 3 Phase 4 wire (8.00 to 18.00 Km) for 05Nos. DTs shifted on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
8 Mtr. Long Pole(PCC WL-200Kg )
GI U-Clamp for Shackle insulators
Shackle insulator 16 KN
30 mm² ACSR Weasel Conductor
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti climbing Devices with Clamp
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
Stone Pad (300mmx300 mmx75mm)
Aluminium Jointing Sleeves
LT line Spacers
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Dismantling charges of existing HT line at (8.00 to 18.00 Km) including carriage to Divisional store
Laying of HT line on 9 Mtrs.PCC poles with ACSR Weasel Conductor at (8.00 to 18 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9 Mtr. Long Pole(PCC WL-300 Kg )
11 Mtrs.long PCC Poles (PCC Wl-360 Kg)
GI V cross-arm/Horizontal with top Bracket including clamp
GI Channel x-arm includingclaps and braces
30 mm² ACSR Weasel Conductor
PG Clamps for ACSR weasel conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti Climbing Devices with clamps
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
Stone Pad (300mmx300 mmx75mm)
Aluminium Jointing Sleeves
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Dismantling charges of existing LT line at (8.00 to 18.00 Km) including carriage to Divisional store
Laying of LT line on 8 Mtrs.PCC poles with ACSR Weasel Conductor 47 Mtr Span on 3 Phase 4 wire (8.00 to 18.00 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
8 Mtr. Long Pole(PCC WL-200Kg )
9 Mtr. Long Pole(PCC WL-300Kg )
GI U-Clamp for Shackle insulators
Shackle insulator 16 KN
30 mm² ACSR Weasel Conductor
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti climbing Devices with Clamp
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
Stone Pad (300mmx300 mmx75mm)
Aluminium Jointing Sleeves
LT line Spacers
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Part C (Km 0 to Km 8.00)
Laying of 1 pole structure (11Nos. Locations ) LT road crossing on 11 Mtrs. ST poles with ACSR Weasel Conductor on 3 Phase 4 wire (08 to18 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 Mtr. Long pole (ST-410 SP 56)(02Nos. Per location)
i) Top GI Channel x-arm 100X50X6= 2 No= 1.65 Mtr ii) Guard netting M.S Angle 50X50X6= 2 No = 1.77 Mtr ii)Bracing M.S.Angel 50X50X6= 8 No = 1 Mtr vi) Clamps for belting & Braceing angel 50X8 =10 No (90Kgs per Location)
GI U-Clamp for Shackle insulators (16nos. per location)
Shackle insulator 16 KN (16nos. per location)
30 mm² ACSR Weasel Conductor (.266km per location)
Galvanized Nuts and Bolts (8kgs per location)
Danger Plates with Clamp(02nos. Per location)
Anti climbing Devices with Clamp (02nos. per location)
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip (02nos.per location)
Red Oxide Paint (01Ltr per location)
Al Paint (01Ltr per location)
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole (02nos. Per location)
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
GI wire for Guard Netting (40kgs per location)
Dismantling charges including carriage to Divisional store of LT road crossing 3 Phase 4 wire (08 to 18 Km) (01complete set at 10Nos. Locations )
Laying of 2 Pole structure (08Nos. Locations) HT Road Crossing on 11 Mtrs. ST poles with ACSR Weasel Conductor at (0.00 to 8.00 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
11 Mtr. Long pole (ST-410 SP 56) (04Nos. Per location)
i) Top GI Channel x-arm 100X50X6= 4 No= 2.2 Mtr ii) Belting M.S Angle 50X50X6= 4 No = 1.77 Mtr iii)Bracing M.S.Angel 50X50X6= 4 No = 2.35 Mtr iv)Guard netting M.S.Angel 50X50X6= 2 No = 2.5 Mtr v)Clamps for belting&Braceing angel/channel 50X8 =24 No vi) GI Channel x-arm 100X50X6= 2 No= 1.65 Mtr vii) Bracing M.S.Angel 50X50X6= 2 No = 1 Mtr (242Kgs per location)
30 mm² ACSR Weasel Conductor (.2km sper location)
PG Clamps for ACSR weasel conductor (12Nos. Per location)
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (12Nos. Per location)
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (06 Nos.per location)
Galvanized Nuts and Bolts (8kgs per location)
Anti Climbing Devices with clamps (04nos.per location)
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip (04nos. Per location)
Red oxide Paint (02ltr per location)
Aluminium Paints (02Ltr per location)
Cement Bottoming 1:2:4 mix as per REC Standrad 0.5 CUM per pole (04nos per locations)
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete (04nos. Per location)
GI wire for Guard Netting (40kgs per location)
Dismantling charges including carriage to Divisional store of HT road crossing at (08 to 18 Km) ( (01complete set at 06Nos. Locations )
Creation of sub station structure(01Nos.) for 400KVA DT Dismantlled at (0 to 8Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
11 kV Horn Gap Fuse Set 3 Phase 200A
240 mm² (2 Ckt) cable,1.1 K V Grade, PVC Insulated Stranded Conductor FRLS type.
9 Mtr. Long pole (ST-410 SP 33)
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn Gap
Galvinized Nuts and Bolts.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. ( 4 Nos for Transformer and 1No. for Panel)
Transformers Pad / GI Channel Bedding
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Pre febricated LT Switch 2 Ckt
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Wedege connectors /PG clamps
Danger plate witrh clamps
GI Barbed wire for anti Clambing
3 Ph 4 Wire Trivector meter with CT
Cemetn bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
Painting of poles Red oxide
Painting of poles Aluminum Paint
Sundary items like Aluminium Lugs, Jumpers , binding tape
Charges for Dismantling, carriage, erection and commissioning of old 400KVA DTs on newly erected structure(Complete Job)
Dismantling charges including carriage to Divisional store all the old sub station structure material at no cost (Complete Job)
Laying of HT line on 9 Mtrs.PCC poles with ACSR Weasel Conductor (Span of 52 Mtr) at (0.00 to 8.00 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
9 Mtr. Long Pole(PCC WL-300 Kg )
GI V cross-arm/Horizontal with top Bracket including clamp
GI Channel x-arm includingclaps and braces
30 mm² ACSR Weasel Conductor
PG Clamps for ACSR weasel conductor
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti Climbing Devices with clamps
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
Stone Pad (300mmx300 mmx75mm)
Laying of LT line on 8 Mtrs.PCC poles with ACSR Weasel Conductor 47 Mtr Span on 3 Phase 4 wire (0.00 to 8.00 Km) on Turnkey Basis by way of Supply, Erection/Installation, Testing, commissioning etc of the following material:
8 Mtr. Long Pole(PCC WL-200Kg )
GI U-Clamp for Shackle insulators
Shackle insulator 16 KN
30 mm² ACSR Weasel Conductor
Galvanized Nuts and Bolts
Danger Plates with Clamp
Anti climbing Devices with Clamp
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
Stone Pad (300mmx300 mmx75mm)
Aluminium Jointing Sleeves
LT line Spacers
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
GUARDIAN ENGINEERS
COUNTRY CONSTRUCTION
CEEKAY EPC PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .