| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | L1 | Accepted-AOC lowest Quatation | |
| 2 | L2₹12.2 L+₹32,562 (2.74%)Rejected-Finance | L2 | Rejected-Finance lowest quatation |
| Sl No | Description | Qty | Unit | Aravinth L1 | A.G.Iyappan L2 |
|---|---|---|---|---|---|
| 1.00 | earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts etc., complete as per standard specification for foundations SS 20 B | 16.8 | m3 | 180 ₹3,024 Lowest | 189 ₹3,175.2 |
| 2.00 | Collection supply and filling of Stone Dust filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 4.2 | m3 | 594 ₹2,494.8 Lowest | 604 ₹2,536.8 |
| 3.00 | Cement concrete of mix 1:4:8 (One cement Four sand and Eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification. | 4.2 | m3 | 6,369 ₹26,749.8 Lowest | 6,379 ₹26,791.8 |
| 4.00 | Providing Centering, for PCC & RCC work including cost and labour charges Strutting by using sheets and angles strutting arrangements for the sides and Drain walls,Deck slab etc, and otherl abour charges etc. completeup tor 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. without strutting | 78 | m2 | 454 ₹35,412 Lowest | 464 ₹36,192 |
| 5.00 | with struting | 68.08 | m2 | 682 ₹46,430.56 Lowest | 692 ₹47,111.36 |
| 6.00 | Reinforced Cement concrete of mix 1;1.5;3 One cement one and half sand and three aggregates) using 20mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification. | 12.78 | m3 | 8,972 ₹1,14,662.16 Lowest | 8,982 ₹1,14,789.96 |
| 7.00 | Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel Grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc,. Complete complying with standard specification in force and as directed by department officials.- | 1,800 | Kgs | 91 ₹1,63,800 Lowest | 101 ₹1,81,800 |
| 8.00 | Providing Pile foundation to 30 cm dia and 2.50m, depth excluding cost of steel and including cost of drilling bore with laying of concrete including cost and conveyance of all labour charges for mixing laying compacting curing etc complete directed by the departmental officer etc complete as per standard specification. | 100 | Rm | 1,245 ₹1,24,500 Lowest | 1,255 ₹1,25,500 |
| 9.00 | Brick work in Cement Mortar in 1:5 ( One cement and Five M Sand ) using best quality of Country bricks of size 8¾x 4 ¼ x 2 ¾ including all cost of materials and labour charges including Curing charges etc., complete as per Standard Specificationand as directed by department officials. | 49.87 | m2 | 7,638 ₹3,80,907.06 Lowest | 7,648 ₹3,81,405.76 |
| 10.00 | Cost and supply and fixing of steel GRILL GATE to a size of 3.60x1.60m including cost of all labour charges for cutting bending welding scrapping with red oxide paint in all labour charges etc complete | 162 | Kgs | 103 ₹16,686 Lowest | 113 ₹18,306 |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
25 Sept 2025, 3:00 pmClosed
Executive Officer
Executive Officer Killai TP
Construction of Compound wall at RR PARK in Killai Town Panchayat
2025_DTP_607319_1
142/2025/A1
Open Tender
Civil Works
Works
90 days
Killai TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,500
Yes
20 Jan 2026
22 Sept 2025
25 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
Amount
earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts etc., complete as per standard specification for foundations SS 20 B
Collection supply and filling of Stone Dust filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete.
Cement concrete of mix 1:4:8 (One cement Four sand and Eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification.
Providing Centering, for PCC & RCC work including cost and labour charges Strutting by using sheets and angles strutting arrangements for the sides and Drain walls,Deck slab etc, and otherl abour charges etc. completeup tor 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. without strutting
with struting
Reinforced Cement concrete of mix 1;1.5;3 One cement one and half sand and three aggregates) using 20mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification.
Supplying and Fabrication of Steel and placing in position MS / Ribbed tor steel Grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc,. Complete complying with standard specification in force and as directed by department officials.-
Providing Pile foundation to 30 cm dia and 2.50m, depth excluding cost of steel and including cost of drilling bore with laying of concrete including cost and conveyance of all labour charges for mixing laying compacting curing etc complete directed by the departmental officer etc complete as per standard specification.
Brick work in Cement Mortar in 1:5 ( One cement and Five M Sand ) using best quality of Country bricks of size 8¾x 4 ¼ x 2 ¾ including all cost of materials and labour charges including Curing charges etc., complete as per Standard Specificationand as directed by department officials.
Cost and supply and fixing of steel GRILL GATE to a size of 3.60x1.60m including cost of all labour charges for cutting bending welding scrapping with red oxide paint in all labour charges etc complete
Plastering in Cement Mortor 1:5 Mix (one part of cement and Four part of sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications for 10 sqm
A.G.Iyappan (BID ID -1469338)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .