Tender Value
₹11.7 Cr
EMD Value
₹23.5 L
Closing Date
3 Jul 2026, 12:00 pm
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer
LDA VIPIN KHAND GOMTI NAGAR LUCKNOW
VARUN VIHAR AWASIYA YOJANA KE ANTARGAT KAILASH KHAND ME 9.0 MTR, 12.0 MTR EVAM 18.0 MTR CHAURI SADAK PAR SADAK, SEWER, DRAIN EVAM WATER SUPPLY KA NIRMAN VIKAS KARYA (PART-1)
2026_LDAUP_1162577_1
54/E-tender/CE/2026-27 (04)
Open Tender
Civil Works
365 days
Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
SACHIV LDA
₹23.5 L
22 Jun 2026
22 Jun 2026
4 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete. | 16,134.68 | Cum | 198.24 | ₹31,98,538.96 |
| 2 | Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and roiling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc, lead upto 50 m and for all lift:, All kinds of soil | 16,134.68 | Cum | 156.33 | ₹25,22,334.52 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 19,598.4 | Sqm | 12.68 | ₹2,48,507.71 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil | 4,502.6 | Cum | 140.22 | ₹6,31,354.57 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 1,294.65 | Cum | 5,381.16 | ₹69,66,691.89 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Mild Steel and Medium Tensile steel bars. Sanction rate. | 2,15,058.6 | Kg | 71.5 | ₹1,53,76,689.9 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1 | 660 | Sqm | 309.78 | ₹2,04,454.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 9,610 | Sqm | 665.54 | ₹63,95,839.4 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :, Suspended floors, roofs, landings, balconies and access platform | 2,842 | Sqm | 732.48 | ₹20,81,708.16 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement, All works upto plinth level, Concrete of M25 grade with minimum cement content of 330 kg /cum | 1,369.8 | Cum | 7,508.31 | ₹1,02,84,883.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
SBD.pdf
Tender Documents • 5.49 MB
BOQ_2179104.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid