| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 CrRejected-Finance GRAM KAKNA POST JAITPUR SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.0 CrRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹2.0 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED WITH TECHNICAL SPECIFICATION |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED WITH TECHNICAL SPECIFICATION |
| Sl No | Description | Qty | Unit | M/S ARPNA CONSTRUCTION L3 | ARVIND KUMAR SINGH L2 | MAMTA SHARMA CONTRACTOR CO BARABANKI L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in ordinary soil including Hard clay, chharri bajri up to 5% lead upto 30m & lift Upto 1.50m with Manual Compaction & dressing and getting out and disposal of excavated earth. | 4,374 | CUM | 110 ₹4,81,140 | 105 ₹4,59,270 Lowest | 109.9 ₹4,80,702.6 |
| 2.00 | Supplying and dumping earth filled E.C./HDPE bags in Nylon crate size 1.00x1.00x1.00 mtr mesh size 20 x 20 cm. including cost of all material, labour, T&P.etc. | 11,545 | CUM | 1,006 ₹1,16,14,270 | 940 ₹1,08,52,300 Lowest | 949.9 ₹1,09,66,595.5 |
| 3.00 | Supplying & Laying Geo Textile sheet 200 GSM made with woven multifilament polypropyline yarn in all lead & lift including cost of material, labour, T&P etc. complete. | 1,973 | SQM | 130 ₹2,56,490 | 103 ₹2,03,219 Lowest | 109.9 ₹2,16,832.7 |
| 4.00 | Supplying and laying Local earth filled Geo textiles bag sewing with machine, size 1.00x0.75 m made with 200 GSM woven polypropelyne geotextile, including all cost of material, labour, T&P with all taxes. | 6,027 | NOS | 230 ₹13,86,210 | 273 ₹16,45,371 | 221.9 ₹13,37,391.3 Lowest |
| 5.00 | Supplying and Dumping Porcupine by Hydra (made with R.C.C. 1 : 1.50 : 3) size 3.00X3.00X3.00 M. filled with Jhakhar etc. complete. | 621 | NOS | 9,020 ₹56,01,420 | 9,510 ₹59,05,710 | 8,999.9 ₹55,88,937.9 Lowest |
| 6.00 | Supplying and bamboo bracing with 50 to 80 mm dia. Bamboo including cost of bamboo, labour etc. | 2,796 | RM | 80 ₹2,23,680 Lowest | 93 ₹2,60,028 | 89.9 ₹2,51,360.4 |
| 7.00 | Earth work in filling for earth cover with exacaved earth including all lead and lift above with manual compaction and dressing. | 538 | CUM | 60 ₹32,280 Lowest | 82 ₹44,116 | 69.9 ₹37,606.2 |
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
NIT06 LOT 16
2026_UPIDC_1122365_16
06/SE-XI/2025-26
Open Tender
Civil Works
Item Rate
90 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,037
₹4.0 L
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
8 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil including Hard clay, chharri bajri up to 5% lead upto 30m & lift Upto 1.50m with Manual Compaction & dressing and getting out and disposal of excavated earth. | 4,374 | CUM | - | - |
| 2 | Supplying and dumping earth filled E.C./HDPE bags in Nylon crate size 1.00x1.00x1.00 mtr mesh size 20 x 20 cm. including cost of all material, labour, T&P.etc. | 11,545 | CUM | - | - |
| 3 | Supplying & Laying Geo Textile sheet 200 GSM made with woven multifilament polypropyline yarn in all lead & lift including cost of material, labour, T&P etc. complete. | 1,973 | SQM | - | - |
| 4 | Supplying and laying Local earth filled Geo textiles bag sewing with machine, size 1.00x0.75 m made with 200 GSM woven polypropelyne geotextile, including all cost of material, labour, T&P with all taxes. | 6,027 | NOS | - | - |
| 5 | Supplying and Dumping Porcupine by Hydra (made with R.C.C. 1 : 1.50 : 3) size 3.00X3.00X3.00 M. filled with Jhakhar etc. complete. | 621 | NOS | - | - |
| 6 | Supplying and bamboo bracing with 50 to 80 mm dia. Bamboo including cost of bamboo, labour etc. | 2,796 | RM | - | - |
| 7 | Earth work in filling for earth cover with exacaved earth including all lead and lift above with manual compaction and dressing. | 538 | CUM | - | - |
stage.html
html • 0.07 MB
techsummary_2089914.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
lot16document.pdf
Tender Documents • 3.02 MB
BOQ_2089914.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].