Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical R O BINDLA P O MILLAH TEHSIL SHILLAI DISTT SIRMOUR H P | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.2 L
EMD Value
₹14,400
Closing Date
17 Jul 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O RCC beam on top of both abutment and protection of PCH side abutment
2026_PWD_138846_1
PW/RMP/TA/2026-4840 dated 01.07.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Yes
₹14,400
Yes
14 Aug 2026
11 Jul 2026
17 Jul 2026
11 Jul 2026
17 Jul 2026
11 Jul 2026
11 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 23.11 | Per cubic meter | 559 | ₹12,918.49 |
| 2 | Providing and Laying cement concrete for plain/reinforced concrete 1:4:8 (one cement: four sand: eight graded stone aggregate crushed 25mm (forty milimetre) nominal size mechanically mixed and vibrated in open foundations complete as per drawing and MORD Technical Specification clauses 802, 803, 1202 and 1203 and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals. | 26.24 | Per cubic meter | 6,200 | ₹1,62,688 |
| 3 | Providing weep holes in brick/ stone / plain reinforced concrete abutment, wing wall, return walls with 100 mm dia PVC pipe extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing and technical specifications clauses 614, 709 and 1204.3.7 including carriage of material within all leads and lifts and other incidentals. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 8 | Each | 509 | ₹4,072 |
| 4 | Providing and layinf concrete for Plain/reinforced concrete in open foundation as per drawings and technical specification Clause 802,803 and 1202 and 1203 .Reincrcement cement concrete grade M-20 Nomimnal mix 1:2:4 in flooring including carriage of material within all leads and lifts and other incidentals and as per directions of Engineer-in-charge. | 14.45 | Per cubic meter | 7,965.66 | ₹1,15,103.79 |
| 5 | Providing and layinf concrete for Plain/reinforced concrete in super structure complete as per drawings and technical specification Clause 800,,805,807,1205.4 and 1205.5 upto to 5.00mtr height .plain cement concrete grade M-25Nominal mix 1:1.5:3( 1Cement ,1.5 sand 3 stone aggregate) including carriage of material within all leads and lifts and other incidentals and as per directions of Engineer-in-charge. | 6.24 | Per cubic meter | 8,858.34 | ₹55,276.04 |
| 6 | Supplying fitting and placing HYSD bars reinforcement complete in super structure as per drawing and technical specification clauses 1002, 1010 and 1202 including carriage of mateial within all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. | 538.5 | Per Kg. | 126.81 | ₹68,287.19 |
| 7 | Providing and laying boulder apron laid in wire crates mate with G.I.wire confirming to IS :280 & IS 4826 in 100mmx100mm mesh (weaved diagonally including 10% extra for laps and joints laid with stone boulder weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including hauling of materials through all modes of transportation within all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 86.4 | Per cubic meter | 3,286 | ₹2,83,910.4 |
| 8 | Backfilling /Filter media with granular material behind retaining wall/breast wall as per specification 1204.3.8 in a width of 600 mm. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. | 11.7 | Per cubic meter | 1,513.1 | ₹17,703.27 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_205623.xls
BOQ • 4.04 MB
SBD.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .