Tender Value
₹6.4 L
EMD Value
₹64,377
Closing Date
28 Aug 2026, 5:00 pmDue today
Executive Officer
NP BISANDA
CONSTRUCTION OF BARAT GHAR IN GHABAR THOK BISANDA
2026_DOLBU_1177927_1
609/Nirman/NPBisanda/2026-27 Date 18-08-2026
Open Tender
Civil Works
Percentage
NP BISANDA
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹760
Executive Officer
₹64,377
19 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boring for piles 30 cm. dia and 3.5 mtr. Depth for auger set | 14 | RM | 820 | ₹11,480 |
| 2 | EARTH WORK FILLING BY T/T UPTO 5KM. | 18.19 | CUM | 268.5 | ₹4,884.02 |
| 3 | Earthwork excavation in B/C Soil including lift up to 1.5 m and lead upto 30m t&p etc all complete (si. No. 251 chapt. No. 4 page no. 23) | 6.02 | CUM | 120 | ₹722.4 |
| 4 | SUPPLY & laying of sand | 4.62 | CUM | 1,000 | ₹4,620 |
| 5 | supply & laying of c.cс. 1:4:8 | 4.62 | CUM | 4,300 | ₹19,866 |
| 6 | R.C.C Work cement approved cource sand and 2cm (3/4 gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding the same with 24B.W.G.I. bindingwire on including | 19.08 | CUM | 7,100 | ₹1,35,468 |
| 7 | mild steel of iron work such as rainforcement concrete work (which not including all over rates) wrought to required shape as cnecessary including bending supply of steel of grade 550D its wastage and hooks and outhorized overlapping shall be measured SI no. 504.(TATA / JINDAL/SAIL) | 14.98 | QTL | 5,600 | ₹83,888 |
| 8 | Firsrt clas brick work in 1:4 cement and fine sand of 1.25 fineness modules mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for prpper completion of the work. As per S.I.-305 | 11.06 | CUM | 5,300 | ₹58,618 |
| 9 | 12mm thick plaster on brick work min. thickness not less than 10mm with 1 part cement and 4 part fine snd of 1.25 fineness modules mortar 1:4 | 142.64 | SQM | 130 | ₹18,543.2 |
| 10 | Providing and applying with white cement paste putty | 188.14 | SQM | 110 | ₹20,695.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
NIT9.pdf
Tender Documents • 1.23 MB
BOQ_2213364.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].