Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹3.2 L+₹49,670 (18.6%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions Satisfied |
Tender Value
₹2.6 L
EMD Value
₹2,600
Closing Date
30 Sept 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The SE/Operation/TTPS
Office of the SE/Operation/TTPS
TTPS Operation Circle MPM II ACP Stage I, II III Cleaning of filters, cooling coils, condensers, cooling towers and greasing of bearings in AC Plants and periodical overhauling of pumps, equipments from 08.10.20 to 31.03.21
2020_EB_179037_1
SE/O/TTPS/Spec.No.189/20-21
Open Tender
Miscellaneous Works
Item Rate
175 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹2,600
3 Oct 2020
15 Sept 2020
1 Oct 2020
15 Sept 2020
30 Sept 2020
15 Sept 2020
90 days
Filter cleaning work: Charges for Filter cleaning work in stage I & II - Removing the filters from the frames of AHUs/Package units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames - If necessary, replacing the damaged filters with new/reconditioned filters.
Filter cleaning work: Charges for filter cleaning work in Stage III - Removing the filters from the frames of AHUs/Package Units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames -If necessary, replacing of the damaged filters with new/reconditioned filters.
Cooling coil cleaning work: Charges for cleaning the cooling coil of the AHUs/Package Units, in stage I & II by Soap water washing.
Cooling coil cleaning work: Charges for cleaning the cooling coil of AHUs in Stage III, by Soap water washing.
Condenser Cleaning Work: Charges for cleaning the condensers of AC plants and Package units in Stage I, II & III. Dismantling the end covers at both sides of condenser - Providing dummy plates in pipes for arresting water leak - Admitting water & air into the tubes and cleaning the inner surfaces of tubes using brush - removing dummy plates and re-fixing the end covers by providing the rubber gaskets. [Materials - Contractor scope].
Material Cost: ( Contractor’s Scope) Rubber Gasket 5 mm thick for pumps.
V' - Belt and Bearing Related Work: Charges for checking the performance of the bearings and Alignment of 'V' Belts in AHUs and Package units - If necessary, Replacing the bearings and 'V' belts. [For 31 equipments = 1 operation]
Grease Application Work: Charges for greasing the bearings in AHUs and package Units. [For 31 equipments = 1 operation].
Compressor Oil related work: Charges for compressor oil related work in the AC plant - Draining oil from oil chamber of compressor - Removing oil chamber cover - Cleaning/renewing the suction and discharge oil filters - Cleaning the oil lines - Fixing the oil chamber cover - Topping up of oil - Leak testing and commissioning.
Cooling Tower Cleaning Work: Charges for complete cleaning of cooling towers. Draining the water - Removing the choking particles like slurry, mud, scales of rust etc in tank - Scrubbing and removing the algae growth in Louvers and surroundings -Admitting fresh water. [14 equipments = 1 Opn]
Pump overhauling Work: Charges for overhauling Chiller/CW pumps at Unit III, Conference Hall, DCS I, DCS II, Service Building and switch yard I with motor capacity of 3.7 KW to 7.5 KW. Decoupling the pump from motor - Dismantling the pump parts - Cleaning the internal parts, replacing the damaged parts, bearings etc. if necessary - Re-assembling and checking - Coupling with motor and commissioning.
Pump overhauling Work: Charges for overhauling Chiller/CW pumps at Unit IV & V CW and chiller pump and Unit I & II CW pumps with motor capacity of 15 KW. Decoupling the pump from motor - Dismantling the pump parts - Cleaning the internal parts, replacing the damaged parts, bearings etc. if necessary - Re-assembling and checking - Coupling with motor and commissioning.
Material Cost: ( Contractor’s Scope) Gland rope of various sizes.
KARTHIK ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .