Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹56.6 LAccepted-AOC SCO NO 102 AMAR MARKET NEAR SEC 9 CHOWK KARNAL | KARNAL | KARNAL | HARYANA | 1 | Accepted-AOC L-1 | |
| 2 | 2₹64.5 L+₹8.0 L (14.1%)Rejected-Finance H NO 104 BASANT VIHAR KARNAL | KARNAL | HARYANA | 132001 | 2 | Rejected-Finance L-2 | |
| 3 | 3₹66.0 L+₹9.4 L (16.6%)Rejected-Finance F109 LALA LAJPAT RAI COMPLEX PEHOWA CHOWK | KAITHAL | HARYANA | 136027 | 3 | Rejected-Finance L-3 | |
| 4 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹65.3 L
EMD Value
₹1.3 L
Closing Date
17 Nov 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, Provincial Division No.2, PWD BR Br., Karnal
Construction of Specter steps in Hockey Ground in Sainik School Kunjpura in Karnal Distt
2021_HRY_194036_1
Re-invited Construction of Specter steps in Hockey
Open Tender
Civil Works
Works
180 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
₹1.3 L
Yes
4 Feb 2022
28 Oct 2021
18 Nov 2021
28 Oct 2021
17 Nov 2021
28 Oct 2021
120 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (1) All Kind of Soil. (HSR 4.12.1)
Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.(HSR 4.33)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size). (HSR 6.1.6).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) ( HSR-6.14.1)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 cum graded stone aggregate 20 mm nominal size) ( HSR-6.15.1)
Reinforced cement concrete work in beams, suspended floors, cum roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size). ( HSR-6.16)
Reinforced cement concrete work in arches, arch ribs, domes, cum vaults, shells, folded plate and roofs having slope more than 15° up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size) ( HSR-6.18)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints,spacer bars, chairs, stays, hangers and annealed steel wire etc.complete in all respect above plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.(HSR 6.34.6)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in ( HSR-7.21.2)
Providing and laying brick tiles over mumty roofs, grouted with cement mortar 1 :3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement, over 12 mm layer of cement mortar 1 :3 (1 cement : 3 fine sand) and finished neat: ( HSR-9.14.1)
Providing and laying of base course of floors consisting of 100 mm thick sqm cement 1 :8: 16 and 100 mm sand or stone filling ( HSR-10.1.1)
1 O mm thick cement plaste 1 :3 (1 cement: 3 fine sand) (HSR 11.4.2)
12 mm cement plaster of mix ( HSR-11.8.1)
15 mm cement plaster on rough side of single or half brick wall of mix ( HSR-11.9.1)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. ( HSR-11.60) (Labour Rate)
Wall painting on a cement plaster surface with acrylic emulsion paint of approved brand and manufacture to give an even shade : Two or more coats on new work (HSR 11. 71.1) (Labour Rate) Note:- In case of any difference in the unit & nomenclature of any of the HSR items of Civil, PH depicted in this DNIT and that given in HSR, the unit and nomenclature given in HSR shall be applicable.
Vardaan Construction
SALASAR BUILDERS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .