| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-AOC | 1 | Accepted-AOC LOWESR | |
| 2 | 2₹13.2 L+₹88,317.25 (7.17%)Rejected-Finance | 2 | Rejected-Finance NOT LOWEST | |
| 3 | 3₹13.5 L+₹1.2 L (9.40%)Rejected-Finance | 3 | Rejected-Finance NOT LOWEST | |
| 4 | 4₹13.6 L+₹1.3 L (10.3%)Rejected-Finance 00 NEAR POLICE POST JIND BYE PASS KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | 4 | Rejected-Finance NOT LOWEST | |
| 5 | 5₹13.7 L+₹1.4 L (11.6%)Rejected-Finance | 5 | Rejected-Finance NOT LOWEST |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
25 Feb 2021, 5:00 pmClosed
VARUN KANSAL
AMBALA ROAD KAITHAL
Construction of Boundary wall of CHC at Rajound in Kaithal Distt.
2021_HRY_159916_1
PWD/KAITHAL/P-II/BOUNDARY WALL AT CHC RAJOUND
Open Tender
Civil Works
Item Wise
60 days
KAITHAL DISTRICT
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹13,000
KAITHAL
18 Jun 2021
13 Feb 2021
26 Feb 2021
13 Feb 2021
25 Feb 2021
13 Feb 2021
18 Feb 2021
Amount
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing b). in cement (HSR 8.5b)
Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 Mtrs. (HSR 6.6)
Cement Concrete 1:4:8 with brick ballast 40mm nominal size in foundation and plinth. (HSR 10.36)
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in footings, strips, foundations, beams, rafts, pedestals and approach slabs of bridges etc. excluding steel reinforcement and including centering and shuttering, laid in position, complete in all respects. (For works upto 1.5 meters below ground level (HSR 10.90 + 10.95 a)
First class brick work laid in cement sand mortar 1:4 in foundation and plinth (HSR 11.4)
First class brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level (HSR 11.9)
15 mm thick cement plaster 1:4 on the rough side of single or half brick wall (HSR 15.10)
Cement pointing 1:2 deep variety on brick and tile work. (HSR 15.60)
Finishing walls with exterior decorative cement based paints such as snowcem Robbiacem etc on new work, two coats to give an even shade (HSR 16.61)
Providing two coats of exterior acrylic emulsion paint. (Note:- First quality paint of reputed make firm such as Goodlass-Nerolac, Berger, Garware, Jenson, Nicholson, Asian & Shalimar Shall be used as approved by Engineer-in-charge in writing, Drum of paint shall be opened in presence of Engineer-in-charge). [HSR 16.79 (b)].
Fe-500 EQR TMT steel bars for RCC works, where not including in the complete rate of RCC including bending, binding and placing in position complete. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS:1732.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 18.22)
Recovery items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :-i). Old Brick bats @ Rs.400/- P.Cum
ii). Old bricks @ Rs.4.50/- Each
The Atela Janta Co op L and C Society Ltd
The Shree Radhe Co op L and C Society Ltd. Cheeka
THE KHERI GULAM ALI CO-OP SOCIETY
The Maa Bhagwati co op multipurpose society Ltd Pundri
THE SHREE LAKSHMI CO-OP L/C SOCIETY LTD PUNDRI
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .