Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical AT BABEBIR PO BABEBIR BLOCK BADEN DIST NUAPADA ODISHA | BADEN | NUAPADA | ODISHA | Admitted-Fee/PreQual/Technical |
Tender Value
₹29.0 Cr
EMD Value
₹29.1 L
Closing Date
4 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE AND BM MB BURLA
Office of the Chief Engineer and Basin Manager Mahanadi Basin Burla At Po Burla Dist Sambalpur Odisha Pin 768017
Renovation of Canal System of Hirakud Dam Project of Sambalpur Canal Section Sambalpur Irrigation Division Sambalpur
2025_CEBBU_121183_1
CE AND BM MB 29-2025-2026(Online)
Open Tender
Civil Works - Canal
Percentage
730 days
At Dhankauda Block Dhankauda ULB Dist Sambalpur
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹29.1 L
20 Feb 2026
13 Nov 2025
5 Dec 2025
13 Nov 2025
4 Dec 2025
13 Nov 2025
13 Nov 2025 - 4 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing land in canal slope work including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick, complete as directed by Engineer-in-Charge. | 1,08,906.4 | Sqm | 2.8 | ₹3,04,937.92 |
| 2 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing etc. complete as directed by the Engineer-in-charge. | 3,399.12 | Cum | 858.6 | ₹29,18,484.43 |
| 3 | Earth work in excavation of foundation in all kinds of soil including hard moorum,stoney earth mixed with boulder (except sheet rock and boulder required blasting)with all lead ,lifts and delifts including dressing and levelling the bed & slope & depositing the excavated materials at places away from the work site with all leads,lifts and delifts including cost of all labour & dewatering if required and T&P required for the work etc.Complete as directed by the Engineer-in-charge. | 31,082.42 | Cum | 276.9 | ₹86,06,721.82 |
| 4 | Filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty etc. complete as per direction of the Engineer-in-Charge. | 5,599.77 | Cum | 1,097.7 | ₹61,46,869.72 |
| 5 | Rigid & smooth centering and shuttering for PCC work including false work and dismantling them after casting including all cost of material and labour in plinth and foundation etc.complete as directed by the Engineer-in-charge. | 1,25,365.73 | Sqm | 249 | ₹3,12,16,066.77 |
| 6 | Plain Cement concrete M-15 graded C.B.H.G coarse aggregate 40 mm down graded metal of approved quality mixing by concrete mixture and placing manually compacting with vibrator including cost of all materials, labour charges with all leads by mechanical means and placement within initial lead of 50 m and initial lift of 1.50 m for mixing concrete including conveyance,royalty and taxes etc. of all materials T &P,watering and curing, B & OC workers welfare cess etc. complete as per the direction of the Engineer in charge. | 5,893.69 | Cum | 5,316.1 | ₹3,13,31,418.83 |
| 7 | Supplying and fixing of 150 mm dia NP3 Hume Pipe inlcuding all cost of carriage,labour with B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 163.2 | RM | 728.9 | ₹1,18,956.48 |
| 8 | Supplying and fixing of 100 mm dia NP3 Hume Pipe inlcuding all cost of carriage,labour with B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | 816 | RM | 604.7 | ₹4,93,435.2 |
| 9 | Providing formwork for Concrete with F1 finish for upstream faces of dam,spillway ,glacis of barrages,unexposed surfaces of foundation .block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materials and T & P etc.Complete as directed by the Engineer-in-charge. | 7,716.01 | Sqm | 762.8 | ₹58,85,775.48 |
| 10 | Supplying, fitting and placing uncoated M.S. Bar reinforcement complete as per drawing and technical specification etc. complete as per direction of Engineer-in-charge. | 7,325.39 | Qntl | 8,320.2 | ₹6,09,48,709.88 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
DTCNSambalpur.pdf
Tender Documents • 7.57 MB
BOQ_563813.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .