| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | ₹16.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.0 LRejected-AOC | ₹17.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Subbarayalu S L2 | SRI SRI SAI EMISSION TESTING CENTRE L1 |
|---|---|---|---|---|---|
| 1.01Renewal BT of Amoor Kuppam - Thulagampattu km 0/0-0/960 | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 1,728 | m2 | 7 ₹12,096 | 6 ₹10,368 |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | 345.6 | m3 | 150 ₹51,840 | 140 ₹48,384 |
| 1.04Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 1.05 | km 0/0 - 1/00 | 15.98 | m3 | 5,013.15 ₹80,110.14 | 5,013.15 ₹80,110.14 |
| 1.06 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 3,600 | m2 | 34.66 ₹1.2 L | 34.66 ₹1.2 L |
| 1.07 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 90 | m3 | 11,859.14 ₹10.7 L | 11,859.14 ₹10.7 L |
| 1.08Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. | |||||
| 1.09 | km 0/0 - 1/00 | 114.34 | m3 | 867.38 ₹99,176.23 | 867.38 ₹99,176.23 |
| 1.10 | Provision for HM Stones. | 4 | Nos | 574.65 ₹2,298.60 | 574.65 ₹2,298.60 |
Tender Value
₹17.1 L
EMD Value
₹17,100
Closing Date
13 Feb 2026, 4:00 pmClosed
BDO(BP)
BDO(BP) BDO Office Thiruvennainallur
TVN/RRMS/25-26/AMOORKUPPAM1
2026_RDTN_654050_1
TVN/RRMS/25-26/AMOORKUPPAM1
Open Tender
Civil Works
120 days
Thiruvennainallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,100
14 May 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
Renewal BT of Amoor Kuppam - Thulagampattu km 0/0-0/960
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
Provision for HM Stones.
Towards the cost of Name Board charges
Towards the cost of photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_784298.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid