Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC NO 18 DUVARAGAPILYAR KOIL STREET TIRUPATHUR 635601 | TIRUPATHUR | TAMIL NADU | 635601 | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹30,285.08 (2.03%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.4 L+₹52,343.89 (3.51%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹15.5 L+₹57,749.84 (3.88%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹15.7 L+₹84,685.64 (5.68%)Rejected-AOC NO 2 367 KASINAICKENPATTI TIRUPATHUR DISTRICT | TIRUPATHUR | TAMIL NADU | 635601 | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | SK ENGINEERING CONTRACTOR L8 | Vijayakumar L3 | M Nadarajan L5 | Venkateswara Traders L7 | ANU CONSTRUCTION L1 | Alagesan Contractor L2 | G.Rajeshkumar L4 | NAVISRI & CO L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of New 30000 Liters OHT (12m stagging) at Pulikuttai in Adiyur panchayat. | |||||||||||
| 2.00Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil | |||||||||||
| 3.00 | In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B | 46.28 | 1m3 | 300 ₹13,884 | 270.48 ₹12,517.81 | 270.48 ₹12,517.81 | 243.48 ₹11,268.25 | 215 ₹9,950.2 | 215 ₹9,950.2 | 207 ₹9,579.96 Lowest | 224.24 ₹10,377.83 |
| 4.00 | Second depth of 2.0m to 3.0 m | 8.06 | 1m3 | 30 ₹241.8 Lowest | 270.48 ₹2,180.07 | 270.48 ₹2,180.07 | 292.17 ₹2,354.89 | 260 ₹2,095.6 | 215 ₹1,732.9 | 216 ₹1,740.96 | 224.24 ₹1,807.37 |
| 5.00 | Sand filling for foundation with M sand including cost of sand,watering,ramming and consolidation etc complete as directed by Departmental officers | 3.46 | 1m3 | 2,000 ₹6,920 | 5,981.08 ₹20,694.54 | 5,981.08 ₹20,694.54 | 2,434.76 ₹8,424.27 | 1,450 ₹5,017 | 1,834 ₹6,345.64 | 1,305 ₹4,515.3 Lowest | 1,562.27 ₹5,405.45 |
| 6.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 3.46 | 1m3 | 6,000 ₹20,760 | 5,981.08 ₹20,694.54 | 5,981.08 ₹20,694.54 | 6,330.38 ₹21,903.11 | 5,450 ₹18,857 | 4,890 ₹16,919.4 | 4,850 ₹16,781 | 4,659.31 ₹16,121.21 Lowest |
| 7.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||||||||
| 8.00 | Below 1.5m from GL | 6.72 | 1m3 | 9,500 ₹63,840 | 9,869.26 ₹66,321.43 | 9,869.26 ₹66,321.43 | 9,252.09 ₹62,174.04 | 7,500 ₹50,400 Lowest | 8,028 ₹53,948.16 | 8,270 ₹55,574.4 | 7,941.1 ₹53,364.19 |
| 9.00 | 0m to 1.50m below GL | 1.49 | 1m3 | 9,000 ₹13,410 | 9,869.26 ₹14,705.2 | 9,869.26 ₹14,705.2 | 9,252.09 ₹13,785.61 | 7,150 ₹10,653.5 Lowest | 7,946 ₹11,839.54 | 8,550 ₹12,739.5 | 7,823.13 ₹11,656.46 |
| 10.00 | 0m to 1.00m above GL | 0.36 | 1m3 | 9,500 ₹3,420 | 9,972.56 ₹3,590.12 | 9,972.56 ₹3,590.12 | 9,252.09 ₹3,330.75 | 7,350 ₹2,646 Lowest | 8,069 ₹2,904.84 | 8,980 ₹3,232.8 | 7,823.13 ₹2,816.33 |
Tender Value
Refer Docs
EMD Value
₹37,720
Closing Date
30 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer (VP) Kandhili Block
The Block Development officer (VP) Kandhili Block
Thirupathur District 14Th CFC Savings Fund Construction of New 30,000 Liter OHT 12.0m Stagging at Pulikuttai H/o Adiyur Panchayat Package 03
2026_RDTN_704588_1
COLRD/79 /2026/A4
Open Tender
Civil Works
Item Wise
180 days
Kandhili Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹37,720
2 Nov 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New 30000 Liters OHT (12m stagging) at Pulikuttai in Adiyur panchayat. | - | - | - | - |
| 2 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil | - | - | - | - |
| 3 | In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B | 46.28 | 1m3 | - | - |
| 4 | Second depth of 2.0m to 3.0 m | 8.06 | 1m3 | - | - |
| 5 | Sand filling for foundation with M sand including cost of sand,watering,ramming and consolidation etc complete as directed by Departmental officers | 3.46 | 1m3 | - | - |
| 6 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 3.46 | 1m3 | - | - |
| 7 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | - | - | - | - |
| 8 | Below 1.5m from GL | 6.72 | 1m3 | - | - |
| 9 | 0m to 1.50m below GL | 1.49 | 1m3 | - | - |
| 10 | 0m to 1.00m above GL | 0.36 | 1m3 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Tendernotice_2.pdf
PDF • 0.98 MB
BOQ_846928.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .