Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹2,928.37 (1.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,860
Closing Date
11 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of R-wall House protection Bund near House of Sanullah Khan and others at Bosgai PYT Halqa Zadgay -A BLOCK Tulail
2026_PWDJK_318734_8
(REW) E-NIT No 05 2026-27 EE-RnB-Grz-4208-17 E-tendering Dated-30-07-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer RnB Division Gurez
₹5,860
Executive Engineer RnB Division Gurez
17 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 18.13 | Cum | 479.3 | ₹8,689.71 |
| 2 | Providing and laying of stone soling tightly hand packed and incl. carriages complete. | 4.03 | Cum | 1,200 | ₹4,836 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:4:8 (1Cement: 4 fine sand: 8 graded stone aggregate 40mm nominal Size) | 4.03 | Cum | 5,202.9 | ₹20,967.69 |
| 4 | Random Rubble stone masonary with hard stones of approved quality laid in 1:6 mix incl bond stones using nallah stones. | 26.34 | Cum | 5,402.9 | ₹1,42,312.39 |
| 5 | Dry random rubble stone masonary using nallah stones @ 40% | 17.56 | Cum | 3,262.1 | ₹57,282.48 |
| 6 | Providing and laying in position plain cement concrete 1:2:4 mix ratio M15 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) incl form work | 1.6 | Cum | 6,591.25 | ₹10,546 |
| 7 | Carriage of different material from nearest source to site of work for 20 Kms avg. lead and headload of 200 mtr. | 43.9 | Cum | 872.59 | ₹38,306.7 |
| 7.01 | carriage of materials involved: sand and agg 20 km and HEADLOAD 200MTRS | 7.6 | Cum | 741.68 | ₹5,636.77 |
| 7.02 | carriage of materials cement for av. Lead of 30 km and HEADLOAD 200MTRS | 2 | MT | 629.8 | ₹1,259.6 |
| 8 | provision for photographs and sign board | 1 | job | 3,000 | ₹3,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1052138.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .