| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.5 L+₹5,843.35 (0.30%)Rejected-Finance | L2 | Rejected-Finance Quated high rate |
| Sl No | Description | Qty | Unit | DHANASEKAR K L2 | SRI MURUGAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Name of work: Construction of drain and culvert from Bus stand to weekly market to link with Exisiting drain at Kavundapady H/O KAVUNDAPADY | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 292.98 | cum | 270 ₹79,104.6 | 263.7 ₹77,258.83 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 27.84 | cum | 5,520 ₹1,53,676.8 | 5,513 ₹1,53,481.92 Lowest |
| 4.00 | Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete | 519 | sqm | 550 ₹2,85,450 | 547.5 ₹2,84,152.5 Lowest |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 80.28 | cum | 6,310 ₹5,06,566.8 | 6,303 ₹5,06,004.84 Lowest |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 14.26 | cum | 6,925 ₹98,750.5 | 6,919 ₹98,664.94 Lowest |
| 7.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 55.65 | cum | 5,825 ₹3,24,161.25 | 5,822 ₹3,23,994.3 Lowest |
| 8.00 | Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete | 28.01 | sqm | 1,100 ₹30,811 | 1,095 ₹30,670.95 Lowest |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.61 | Mts | 92,100 ₹56,641.5 | 91,963 ₹56,557.25 Lowest |
| 10.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 7.72 | cum | 9,430 ₹72,799.6 | 9,425 ₹72,761 Lowest |
Tender Value
₹19.6 L
EMD Value
₹19,600
Closing Date
26 Sept 2025, 3:00 pmClosed
Block Development Officer (B.P), Bhavani
Block Development Officer (B.P), Bhavani
Construction of drain and culvert from Bus stand to weekly market to link with Exisiting drain at Kavundapady H/O KAVUNDAPADY
2025_RDTN_605233_1
1769/2025/A2
Open Tender
Civil Works - Others
Item Rate
105 days
Block Development Officer (B.P), Bhavani
Construction of drain and culvert from Bus stand to weekly market to link with Exisiting drain at Kavundapady H/O KAVUNDAPADY
6 documents required · 6 mandatory
₹0
₹19,600
22 Jan 2026
17 Sept 2025
26 Sept 2025
17 Sept 2025
26 Sept 2025
17 Sept 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering with CM 1:4 mix 20mm thick including all cost and conveyance of materials and labour charges etc
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
DHANASEKAR K (BID ID -1467983)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_723409.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .