Tender Value
₹9.7 L
EMD Value
₹9,700
Closing Date
29 Mar 2023, 2:00 pmClosed
Superintending Engineer EEDC Erode
948.EVN Road, TANGEDCO, EEDC, ERODE-9
Construction of Over head tank in Division office and protection wall in between AE O and M Town and Executive Engineer O and M Perundurai office in EEDC Erode
2023_EB_296991_1
SE/EEDC/ED Specification No.38/2022-23
Open Tender
Civil Works - Others
Works
60 days
EE Office Perundurai .
AS per BQR Details
2 documents required · 2 mandatory
₹0
₹9,700
3 Apr 2023
23 Mar 2023
29 Mar 2023
23 Mar 2023
29 Mar 2023
23 Mar 2023
23 Mar 2023 - 28 Mar 2023
Amount
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Column upto Second Floor including cost of cement, all materials, labour, curing, vibration charges, with shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for water tank side walls including cost of cement, all materials, labour, curing, vibration charges, with shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Beams including cost of cement, all materials, labour, curing, vibration charges, without shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.) Second Floor
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Roof slab of 150 mm thick including cost of cement, all materials, labour, curing, vibration charges, including shuttering all leads, lifts, etc., complete. (but excluding cost of steel reinforcement.) Second Floor
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Roof slab of 125 mm thick including cost of cement, all materials, labour, curing, vibration charges, including shuttering all leads, lifts, etc., complete. (but excluding cost of steel reinforcement.) Third Floor
Providing steel reinforcement MS/RTS rods for all reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Brick work in C.M. 1:5 using class II chamber burnt bricks for super structure including, cost of cement, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete. Third Floor
Earth work excavating and depositing on bank with initial lead of 10m and initial lifd of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete.
Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete.
Plain cement concrete in CC 1:4:8, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Plain cement concrete in C.C. 1:2:4 mix using 12 to 20mm HBG machine crushed metal for Road surface including cost of cement, all materials, labour, curing, vibration charges, including shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
Cement Solid Block in CM 1:5 using 15 cm cement Solid block for super structure and manhole including cost of all materials, labour charges, curing,scaffolding charges all leads and lifts etc., complete and as directed by Engineer.
Plastering with CM 1:5 12 mm thick for inner and outer wall including cost of cement, labour, curing, all leads and lifts etc., complete as per standard specification.
SGST For bidders within Tamilnadu
CGST For Bidders within Tamilnadu
IGST For Bidders outside of Tamilnadu
S K K Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .