Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹67.1 LAccepted-AOC 122 GHTP POWER COLONY LEHRA MOHABAT BATHINDA 151111 | BATHINDA | BATHINDA | PUNJAB | 151111 | ₹67.1 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹67.5 LRejected-AOC VILLAGE BUDMAJRA NEAR BALONGI SALES TAX BARRIER DISTRICT MOHALI PUNJAB | MOHALI | MOHALI | PUNJAB | ₹67.5 L | 2 | Rejected-AOC Not L-1 |
| 3 | 3₹71.2 LRejected-AOC SCO NO 14 TRANSPORT NAGAR REGD BATHINDA 151003 PUNJAB | BATHINDA | BATHINDA | PUNJAB | 151003 | ₹71.2 L | 3 | Rejected-AOC Not L-1 |
| 4 | 4₹77.8 LRejected-AOC 155 SHAMPURA COLONY BELA ROAD RUPNAGAR 140001 | RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | ₹77.8 L | 4 | Rejected-AOC Not L-1 |
| 5 | Not Admitted-Finance 1 VISHWAS NAGAR PO NFL GONIANA ROAD BATHINDA PUNJAB 151003 | BATHINDA | PUNJAB | 151003 | - | - | Not Admitted-Finance System rejected due to Highest value quoted |
| Sl No | Description | Qty | Unit | durga construction L1 | CHOPRA ENGINEERING WORKS L2 | M/S SODHI ERECTORS L3 | Alex Engineering L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Routine, Preventive, Breakdown & Shutdown Maintenance of 415V AC Switchgears at main plant & CHP Switchgears, 220V DC, 110VAC power supply system, ESP Control Panels including transformers and rapping motors control, Hydrogen Plant, local control panels, Micro Hydel Plant LT Switchgear and associated equipment, local push button stations and power receptacles, LT Power and control cables installed at various locations under Electrical Mtc. Cell No.1 of 4X210MW Stage-II and III (Unit No. 3 to 6) at Guru Gobind Singh Super Thermal Plant, Roopnagar, Punjab | 12 | Months | 5,95,000 ₹71.4 L | 6,36,000 ₹76.3 L | 6,48,000 ₹77.8 L | 7,45,000 ₹89.4 L |
| Sl.NoBidder Name | |||||||
| 1 | M/S SODHI ERECTORS (BID ID -660530) | 71,40,000 | Not Quoted | - | - | - | - |
| 2 | Alex Engineering (BID ID -652802) | 71,40,000 | 7118580.00 | - | - | - | - |
| 3 | CHOPRA ENGINEERING WORKS (BID ID -653363) | 71,40,000 | 6747300.00 | - | - | - | - |
| 4 | durga construction (BID ID -653557) | 71,40,000 | 6740160.00 | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
8 Sept 2025, 11:00 amClosed
DyCE/HQ
GGSSTP
Routine, Preventive, Breakdown and Shutdown Maintenance of 415V AC Switchgears at main Plant and CHP Switchgears, 220V DC, 110V AC power supply system, ESP Control Panels including HVR Transformers and rapping motors control, Hydrogen Plant, local co
2025_POWER_141345_1
618/P-2/EMP-W12987 dated 16.05.25
Open Tender
Miscellaneous Works
365 days
GGSSTP
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
₹1.5 L
Yes
21 Jan 2026
28 May 2025
11 Sept 2025
28 May 2025
8 Sept 2025
28 May 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid