Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹24.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.7 LRejected-AOC 4 43 OLD NO 5 36E DR NAVALAR NAGAR ERUMAPALAYAM SALEM | SALEM | SALEM | TAMIL NADU | ₹24.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | APPA ASSOCIATES L2 | S Vijaya L1 |
|---|---|---|---|---|---|
| 1.00Mainatanance of the Road Solur village road KM(0/0 - 1/0) | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 600 | Sqm | 8 ₹4,800 | 7 ₹4,200 |
| 3.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 3.5 | Cum | 5,700 ₹19,950 | 5,250 ₹18,375 |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 9.98 | Cum | 4,896.83 ₹48,870.36 | 4,896.83 ₹48,870.36 |
| 5.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 2,700 | Sqm | 40 ₹1.1 L | 38.27 ₹1.0 L |
| 6.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 81 | Cum | 12,423.15 ₹10.1 L | 12,423.15 ₹10.1 L |
| 7.00 | Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level,uniform and free from streaks and holes etc complete as per MORT&H specification No.803 | 180 | Sqm | 890 ₹1.6 L | 890 ₹1.6 L |
| 8.00Providing CC Side Berms | |||||
| 9.00 | Earth work excavation and depositing on bank with in initial lead of 10 m | 105.6 | Cum | 164.86 ₹17,409.22 | 164.86 ₹17,409.22 |
| 10.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and Conveyance | 52.8 | Cum | 6,898.05 ₹3.6 L | 6,898.05 ₹3.6 L |
Tender Value
₹24.9 L
EMD Value
₹24,950
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Development Officer (BP)
Block Development Office,Yercaud
RRMS 2025 -26
2026_RDTN_660239_1
Roc.No.1886/2025/A2
Open Tender
Civil Works - Roads
Yercaud-Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,950
Yes
9 Mar 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
Mainatanance of the Road Solur village road KM(0/0 - 1/0)
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level,uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Providing CC Side Berms
Earth work excavation and depositing on bank with in initial lead of 10 m
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and Conveyance
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Kilo Metre Stone - Nos
Provision for Hecta Metre Stone - Nos
Provision for Sign board charges (60 Cm Circle)
Provision for Cautionary Sign board charges (60cm equilateral triangle)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
01.pdf
Tender Documents • 0.52 MB
BOQ_792168.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid