Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC BABU RAM THAKUR NIWAS BELOW UTTAM GAS AJANCY DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | 1 | Accepted-AOC Work awarded/completed | |
| 2 | 2₹8.2 L+₹20,650 (2.58%)Rejected-Finance VILLAGE CHAMYANA P O KAMLA NAGER BHATTA KUFER DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | 2 | Rejected-Finance Rejected | |
| 3 | 3₹8.2 L+₹21,454 (2.68%)Rejected-Finance | 3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical GOVERNMENT CONTRACTOR VILLAGE PO TEHSIL NURPUR DISTT KANGRA HP | - | Rejected-Technical Non Responsive |
Tender Value
₹7.6 L
EMD Value
₹15,282
Closing Date
13 Jul 2023, 11:00 amClosed
Executive Enigneer
Exe3utive Enigneer Chowari Division
Repair of Pot holes providing and laying WBM-III
2023_PWD_75907_1
NIt No. 1868-1908 dated 26/06/2026
Open Tender
Civil Works
Item Rate
90 days
Chowari
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹15,282
8 Feb 2024
6 Jul 2023
13 Jul 2023
6 Jul 2023
13 Jul 2023
6 Jul 2023
Amount
Providing, spreading and compacting stone aggregate size 53 mm to 22.4 mm (fifty three millimetre to twenty two point four millimetre) Grading-III, 75 mm (seventy five millimetre) compacted thickness to water bound Macadam specification including spreading in uniform thickness using template, hand packing, rolling with three wheel 80-100 (eighty - hundred) KN static roller in stages proper graded and camber, applying and brooming stone screening typr "B" of size 11.2 mm (eleven point two milimetre) nominal size at the rate of 0.18 (zero point two three cubic metre) per ten square metre to fill up the interstices of course aggregate, watering and compating to the required density as per MORD technical specifications clause No. 405 by manuals means an including hauling of material within all leads and lifts and other incidentals. The rate including octori, royality, Malkana, toll tax, sale tax GST or other taxes imposed by the Government.
Repair of pot holes and removal of loose material, trimming of sides, cleaning of surface by providing and spreading @ 0.300 (Zero point three hundredkilogram) bitumenous per sqaure metre for tack coat, 1.46 kg ( one point four six kilograme ) bitumen per square for 20 mm (twenty millimetre) thick pre-mix carpet and 0.680 (zero point six eight kilograme) bitumen per square metre for seal coat as per MORD specification section 1900 and as per the direction of Engineer-in-Charge including carriage of material with in all leads ,lifts and other incidentials. The rate including the octori, royality, Malkana, toll tax,GST, sale tax or other taxes imposed by the Government.
BABU RAM
Surinder Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .