| 1 | 1₹66.7 LAccepted-AOC | 1 | Accepted-AOC The rate quoted by the bidder is less than put to tender value | |
| 2 | 2₹73.0 L+₹6.4 L (9.52%)Rejected-AOC | 2 | Rejected-AOC The rate quoted by the bidder is Higher than put to tender value |
| Sl No | Description | Qty | Unit | R.NIKESH L2 | V RAJAVELU L1 |
|---|---|---|---|---|---|
| 1.00Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq.ft. | |||||
| 1.10 | Vimanma/Gopuram upto 15-feet [4.57m] height | 552 | sqm | 300 ₹1,65,600 | 282 ₹1,55,664 Lowest |
| 1.20 | Vimanam/Gopuram upto 25'-00" ht | 112 | sqm | 400 ₹44,800 | 378 ₹42,336 Lowest |
| 2.00Providing Two legged Scaffolding using 15cm Dia blue Gum post or Best quality Bamboo / casurina post of 4m overall length (3m ht + 0.5m Projection + 0.50m into the Ground), 3.50 -6.00m and 6.00 to 8.50 the Distance between the Two rows being 1.25m and the spacing of post being 2m ht both upto 18.00m ht etc., complete complying as per standard specification | |||||
| 2.10 | Initial Height upto 3.50m | 25 | Rmt | 500 ₹12,500 | 486 ₹12,150 Lowest |
| 3.00 | Labour charge for removing the existing stone slabs from the praharam including stacking it for later use etc., all complete complying with standard specification. | 23.5 | sqm | 700 ₹16,450 | 640 ₹15,040 Lowest |
| 4.00 | Labour charge for removing the existing damaged cement flooring from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc.. all complete complying with standard specification. | 617 | sqm | 85 ₹52,445 | 79 ₹48,743 Lowest |
| 5.00 | Labour charge for removing the existing damaged plain cement concrete from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification. | 62 | cum | 607 ₹37,634 Lowest | 607 ₹37,634 Lowest |
| 6.00 | Labour charge for dismantling the existing damaged weathering course from the sannathi including removing all debris from the site of work etc., all complete complying with standard specification. | 174.5 | sqm | 57 ₹9,946.5 Lowest | 57 ₹9,946.5 Lowest |
| 7.00 | Labour charge for dismantling the existing damaged lime concrete from the sannathi including removing all debris from the site of work etc., all complete complying with standard specification. | 52.3 | sqm | 442 ₹23,116.6 Lowest | 442 ₹23,116.6 Lowest |
Tender Value
₹66.7 L
EMD Value
₹43,500
Closing Date
29 Apr 2025, 2:00 pmClosed
Hereditary Trustee
Arulmigu Pavazhavannaar and Pachavannar temple ,kancheepuram Town ,Taluk and District.
water washing and Lime Mortar pointing ,Laying Weathering Course,cut stone flooring and Painting Works Pavazhavannaar temple at Arulmigu Pavazhavannaar and Pachavannar temple ,kancheepuram Town ,Taluk and District.
2025_HRCE_552197_1
01/2025
Open Tender
Civil Works - Others
Lump-sum
270 days
Kancheepuram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹43,500
Yes
28 Aug 2025
28 Apr 2025
29 Apr 2025
28 Apr 2025
29 Apr 2025
28 Apr 2025
Amount
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq.ft.
Vimanma/Gopuram upto 15-feet [4.57m] height
Vimanam/Gopuram upto 25'-00" ht
Providing Two legged Scaffolding using 15cm Dia blue Gum post or Best quality Bamboo / casurina post of 4m overall length (3m ht + 0.5m Projection + 0.50m into the Ground), 3.50 -6.00m and 6.00 to 8.50 the Distance between the Two rows being 1.25m and the spacing of post being 2m ht both upto 18.00m ht etc., complete complying as per standard specification
Initial Height upto 3.50m
Labour charge for removing the existing stone slabs from the praharam including stacking it for later use etc., all complete complying with standard specification.
Labour charge for removing the existing damaged cement flooring from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc.. all complete complying with standard specification.
Labour charge for removing the existing damaged plain cement concrete from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification.
Labour charge for dismantling the existing damaged weathering course from the sannathi including removing all debris from the site of work etc., all complete complying with standard specification.
Labour charge for dismantling the existing damaged lime concrete from the sannathi including removing all debris from the site of work etc., all complete complying with standard specification.
Labour charge for scarpping the old lime plaster from the vimanam including removing all debris from the site of work etc., all complete complying with standard specification.
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand.
Cement concrete 1:5:10 (One part of cement five part of sand and ten part of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc..complete as per Std, Specification and as directed by the Dept, Officers
Cleaning the stone surfaces by water washing the stone elements like wall, thoon, bothiyal and pavukkal etc., including cost of material and labour charges etc,.
Labour charges for Pointing the Cut stone masonary work with lime mortar 1:1.5 (one part of lime and one point five part of sand) excluding cost of cut stone but including all labour charges, scaffolding etc.. complete with standard specifications.
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With lime mortar 1:1.5 (one part of limet and one point five part of sand) etc all complete complying with standard specification. Single line dressing
Refixing the removed cut stone slabs from the praharam exclusing cost of slab but including single line dressing etc., all complete complying with standard specification.
Brick work in cement mortar 1:5 (one part of cement and five part of sand) using country brick of size 83/4"x41/4"x2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
Plastering with cement mortar 1:5 (one part of lime and five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Providing Vargapoochu over the corewalls of Vimanams /Gopurams, with lime mortar 1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand) and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.
Vimanam/gopuram of ht. Up to 15'0" excluding Kalkaram
Vimanam/gopuram of ht. Up to 25'0" excluding Kalkaram
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the pavukkal in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick mixed with water proofing compound conforming to ISS at two percent by weight of lime used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Varnishing the new wood work with two coats of Varnish of good quality and color over one coat of primer over new wood work include costs of all materials, brushes charges etc, complete complying with standard specifications.
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications.
Sub total
R.NIKESH (BID ID -1325251)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_659131.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .