Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.8 LAccepted-AOC | ₹14.8 L Quoted ₹12.6 L | 1 | Accepted-AOC L1 Tender |
| 2 | 2₹16.2 LRejected-Finance | ₹16.2 L | 2 | Rejected-Finance High value compared with L1 |
| 3 | 3₹16.9 LRejected-Finance | ₹16.9 L | 3 | Rejected-Finance High value compared with L1 |
| 4 | 4₹17.7 LRejected-Finance | ₹17.7 L | 4 | Rejected-Finance High value compared with L1 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SD POWER TECH L2 | MBS ELECTRICAL CONSTRUCTIONS L4 | M/S MARY CONSTRUCTIONS L3 | MKA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00Thippirajapuram Street Light | |||||||
| 1.01 | Transportation of all types of poles by bullock cart or other vehicle (for all sizes of poles including loading and Unloading )- Upto 30Km | 323 | Nos | 1,61,500 ₹1,90,570 Lowest | 4,03,750 ₹4,76,425 | 2,58,400 ₹3,04,912 | 2,42,250 ₹2,42,250 |
| 1.02 | Transportation of all types and sizes of poles from Road side to pole pit and vice versa upto 0.50 KM | 323 | Nos | 1,13,050 ₹1,33,399 | 88,825 ₹1,04,813.5 | 1,29,200 ₹1,52,456 | 96,900 ₹96,900 Lowest |
| 1.03 | Excavation of pole upto 8.00m length by using JCB/Manual | 323 | Nos | 1,45,350 ₹1,71,513 | 1,53,425 ₹1,81,041.5 | 1,45,350 ₹1,71,513 | 1,61,500 ₹1,61,500 Lowest |
| 1.04 | Erection of RCC, REC, PSC poles 8.00m length by using Crane / Manual | 323 | Nos | 1,77,650 ₹2,09,627 | 1,69,575 ₹2,00,098.5 | 1,61,500 ₹1,90,570 | 1,77,650 ₹1,77,650 Lowest |
| 1.05 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual | 87 | Set | 39,150 ₹46,197 | 26,100 ₹30,798 | 21,750 ₹25,665 Lowest | 34,800 ₹34,800 |
| 1.06 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. | 87 | Set | 20,880 ₹24,638.4 | 43,500 ₹51,330 | 17,400 ₹20,532 Lowest | 52,200 ₹52,200 |
| 1.07 | Fixing of LT Single phase Cross Arm | 326 | Nos | 26,080 ₹30,774.4 Lowest | 32,600 ₹38,468 | 32,600 ₹38,468 | 39,120 ₹39,120 |
| 1.08 | Fixing of LT Three phase Cross Arm | 24 | Nos | 2,400 ₹2,832 Lowest | 3,600 ₹4,248 | 3,000 ₹3,540 | 4,800 ₹4,800 |
| 1.09 | Fixing of LT TI fitting | 19 | Nos | 1,140 ₹1,345.2 Lowest | 1,330 ₹1,569.4 | 1,425 ₹1,681.5 | 1,900 ₹1,900 |
Tender Value
Refer Docs
EMD Value
₹22,324
Closing Date
11 Nov 2025, 3:00 pmClosed
SE/TEDC/TJR
No.1 VALLAM ROAD THANJAVUR
AS PER TENDER SPECIFICATION
2025_EB_619593_1
016/25-26, dt 03.11.2025
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Thippirajapuram
REGISTERED CONTRACTORS
2 documents required · 2 mandatory
₹0
₹22,324
Yes
16 Jul 2026
3 Nov 2025
12 Nov 2025
3 Nov 2025
11 Nov 2025
3 Nov 2025
3 Nov 2025 - 11 Nov 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_740735.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].