Tender Value
₹1.1 L
EMD Value
₹1,500
Closing Date
28 Sept 2022, 5:00 pmClosed
E.E., E400KV S/S DIVI., MOTIRAM ADDA, GKP
OFFICE OF THE EXECUTIVE ENGINEER, E400KV SUB STATION, MOTIRAM ADDA, GORAKHPUR
ATTENDING BREAKDOWN OF 17.5 HP CAPACITY TUBEWELL AT 400 KV S/S GORAKHPUR UNDER ELECTY. 400 KV SUB STATION DIVISION, GORAKHPUR.
2022_UPTCL_730111_1
E Tender No. 10-E400KV S/S D(G)/2022-23
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EXECUTIVE ENGINEER, E400KV S/S DIVISION, GORAKHPUR
₹1,500
19 Oct 2022
20 Sept 2022
29 Sept 2022
20 Sept 2022
28 Sept 2022
20 Sept 2022
Amount
Complete dismentaling and Replacement of Rusted 4" Iron clamp (20 Nos.) for taking out 4" GI pipes one by one of 17.5 HP capacity sub-mersible colony tubewell system for taking of sub-mersible pump with all cost of men, special T&P, chaintackle etc for completion of job.
Complete dismentaling of sub-mersible pump with motor, dismentaling of steel ceing, coupling of pump & motor, cable connection, greasing in all moving parts, replacement of damaged 10x4.00 mm2 cables by new one after straright jointing of motor cable to extension cable with all cost of men, T&P etc required for the job.
Lowering of 17.5 HP sub-mersible pump with coupling pipe & again 4" GI pipe lines one by one after proper coupling of each section, fixing of iron pipe clamp with all cost of men, special T&P, chaintackle etc for completion of job.
Repairing & servicing of Star-Delta starter of tube well system along with making connection of sub-mercible cables with due clamping, dressing, applying CRC on carbonzed electrical contacts etc.
Replacement & Installation of new 250 Amp. Change Over Switch of standard make in A.C. Power Supply Cubical installed in Compressor Room at the Sub Station after removal of damaged Change Over Switch from the cubical after necessary disconnection/dismantling work including proper laying & termination of Power Cables with required Lugs with all cost of men, materials, misc. consumables and T&P etc. required for the job.
Sri Balaji Associates
Harshit Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .