| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.4 L+₹22,496.39 (2.76%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.8 L+₹63,704.90 (7.82%)Rejected-Finance GRAM NAGLA KHUJI POST DADON ATROLI ALIGARH UTTAR PRADESH | ALIGARH | ALIGARH | UTTAR PRADESH | L3 | Rejected-Finance L3 | |
| 4 | L4₹8.8 L+₹65,323.30 (8.02%)Rejected-Finance SHRI RAM VILA UDAI SINGH JAIN RAOD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹9.3 L+₹1.2 L (14.2%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S DHARMENDRA KUMAR THEKEDAR L2 | SHAKUNTALA MISHRA L5 | M/S AMIT TRADERS L4 | M/S JEET CONSTRUCTION L3 | M/S RAM KRISHAN MISHRA CONTRECTOR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Repairing of Drainage syphon at km. 11.450 of Semry Dy. | ||||||||
| 1.01 | Earth work in digging foundation of masonry work in all type of soil including all lead and lift with disposal of earth as per direction of Engineer in charge. | 926.16 | Cum. | 46.8 ₹43,344.29 Lowest | 79 ₹73,166.64 | 75 ₹69,462 | 70 ₹64,831.2 | 70 ₹64,831.2 |
| 1.02 | Laying C.C. M-10(1:3:6) in foundation with cement, coarse sand of F.M. not less than 2.0, crushed stone gtit 20 to 40 mm size well graded including all cost of labour,material,T&P etc.with proper completion of work. | 25.38 | Cum. | 7,500 ₹1,90,350 Lowest | 8,627.16 ₹2,18,957.32 | 7,500 ₹1,90,350 Lowest | 8,000 ₹2,03,040 | 7,569.64 ₹1,92,117.46 |
| 1.03 | Supply, laying & fixing in position and alignment of 1000mm dia Np-3 hume pipe, as per direction engineer-in-charge; including all cost of material, labour, T & P etc, required for proper completion of work. | 20 | Rm. | 6,220 ₹1,24,400 | 7,060.25 ₹1,41,205 | 6,500 ₹1,30,000 | 5,000 ₹1,00,000 Lowest | 6,194.8 ₹1,23,896 |
| 1.04 | First class brick work in 1:4 C:M with Hamirpur coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. | 67.19 | Cum. | 5,200 ₹3,49,388 | 6,000 ₹4,03,140 | 5,980 ₹4,01,796.2 | 6,500 ₹4,36,735 | 5,083.72 ₹3,41,575.15 Lowest |
| 1.05 | Centring and shuttering for P.C.C. work in foundation | 42.55 | Sqm | 200 ₹8,510 | 32.98 ₹1,403.3 Lowest | 150 ₹6,382.5 | 80 ₹3,404 | 142.8 ₹6,076.14 |
| 1.06 | Laying C.C. M-15(1:2:4) with cement, coarse sand of F.M. not less than 2.0, crushed stone gtit10 to 20mm size well graded including all cost of labour,material,T&P etc.with proper completion of work. | 4.9 | Cum. | 12,000 ₹58,800 | 9,317.4 ₹45,655.26 | 6,500 ₹31,850 Lowest | 7,000 ₹34,300 | 8,175.27 ₹40,058.82 |
| 1.07 | Brick on edge lining with 1:3 cement mortar with 8 mm thick sand witched plaster | 21.23 | Sqm | 1,000 ₹21,230 | 868.25 ₹18,432.95 | 800 ₹16,984 | 550 ₹11,676.5 Lowest | 761.82 ₹16,173.44 |
| 1.08 | Deep struck Cement pointing in 1:2 C:M with coarse sand FM not less than 2.0, including all cost of material, labour,T & P etc. required for proper completion of work. | 84.7 | Sqm | 150 ₹12,705 | 137.77 ₹11,669.12 | 140 ₹11,858 | 70 ₹5,929 Lowest | 120.89 ₹10,239.38 |
| 1.09 | Earth work in filling for completing channel section including all lead and lift and making service road, daula and right bank with compaction and dressing of internal and external section to its profile. | 285.14 | Cum. | 100 ₹28,514 | 60 ₹17,108.4 Lowest | 75 ₹21,385.5 | 65 ₹18,534.1 | 69.36 ₹19,777.31 |
Tender Value
₹12.0 L
EMD Value
₹23,940
Closing Date
12 Mar 2026, 2:00 pmClosed
Executive Engineer
Saryu Nahar Khand-3 Balrampur
Repairing of Drainage syphon at km. 11.450 of Semry Dy.
2026_UPIDC_1121466_1
04/EE/2025-26
Open Tender
Civil Works - Canal
Item Wise
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹23,940
Yes
6 Oct 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of Drainage syphon at km. 11.450 of Semry Dy. | |||||
| 1.01 | Earth work in digging foundation of masonry work in all type of soil including all lead and lift with disposal of earth as per direction of Engineer in charge. | 926.16 | Cum. | - | - |
| 1.02 | Laying C.C. M-10(1:3:6) in foundation with cement, coarse sand of F.M. not less than 2.0, crushed stone gtit 20 to 40 mm size well graded including all cost of labour,material,T&P etc.with proper completion of work. | 25.38 | Cum. | - | - |
| 1.03 | Supply, laying & fixing in position and alignment of 1000mm dia Np-3 hume pipe, as per direction engineer-in-charge; including all cost of material, labour, T & P etc, required for proper completion of work. | 20 | Rm. | - | - |
| 1.04 | First class brick work in 1:4 C:M with Hamirpur coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. | 67.19 | Cum. | - | - |
| 1.05 | Centring and shuttering for P.C.C. work in foundation | 42.55 | Sqm | - | - |
| 1.06 | Laying C.C. M-15(1:2:4) with cement, coarse sand of F.M. not less than 2.0, crushed stone gtit10 to 20mm size well graded including all cost of labour,material,T&P etc.with proper completion of work. | 4.9 | Cum. | - | - |
| 1.07 | Brick on edge lining with 1:3 cement mortar with 8 mm thick sand witched plaster | 21.23 | Sqm | - | - |
| 1.08 | Deep struck Cement pointing in 1:2 C:M with coarse sand FM not less than 2.0, including all cost of material, labour,T & P etc. required for proper completion of work. | 84.7 | Sqm | - | - |
| 1.09 | Earth work in filling for completing channel section including all lead and lift and making service road, daula and right bank with compaction and dressing of internal and external section to its profile. | 285.14 | Cum. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_2086703.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .