Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-Finance GANGYAL JAMMU | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.2 L+₹4,400 (3.74%)Accepted-Finance | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.3 L+₹10,050 (8.53%)Accepted-Finance 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | 3 | Accepted-Finance Found Eligible |
Tender Value
₹1.2 L
EMD Value
₹2,434
Closing Date
22 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Repairs to Mono-block priming units of LIS Gurha ,7 cusec discharge 21 mtr head HC pumping ,300 mm dia foot valve assembly unit at Aryanpura ,10cusec discharge, 18 m head H.C Pumping unit at Manda- 1 with allied works.
2024_IFC_242754_1
MID/AN/133
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
₹2,434
Yes
Office of Executive Engineer, MID Akhnoor Nowshera
24 Jan 2024
12 Jan 2024
23 Jan 2024
12 Jan 2024
22 Jan 2024
15 Jan 2024
15 Jan 2024
Repair to 5 HP mono-block priming pump for unit 1 & 2 connected with MS suction and delivery pipes installed at LIS Gurha. The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport. Then complete dismantling of the motor involves extraction of rotor from stator and removing the bearings of both ends 6205 & 6206 followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge in stator, bearing of suitable size, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor/pump. The Job also involve replacement of valve, nipple as per the sample at sight by way of plumbing. Refitting the motor at its installed position and coupling with MS suction and delivery pipes making of electrical connections, job also testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges.Complete Job.
Repairs to 7 cusec discharge 21 mtr head HC pumping unit no. 02 along with allied works at LIS Aryanpura . The job involves decoupling of pump of unit no.2 from the motor and removing the top cover, extraction of shaft and impeller assembly together with bearing bracket by using suitable tools & tackles and skilled technicians..Carriage of the impeller shaft assembly by using manual labour, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to impeller shaft assembly at workshop by way of dismantling and extraction of damaged parts. Job includes repairs to pump shaft and impeller at damaged spots by way of remetaling then finishing to proper size so the shaft and impeller should be balanced. Providing and fitting of 2 nos. bearings (6410-2 nos.). Providing and fitting of new bushes-2 Nos., neck rings ( 2 nos.) as per sample and applying sufficient amount of grease to avoid excessive wear and tear. Fabrication of glands and studs with nuts. Repair to bearing brackets. Re-assembling of impeller shaft assembly and shifting back to site and there after lowering at proper position, placement of oil seal and closing the top cover along with P/F of new nuts,bolts and studs. Providing /fitting of tyre for coupling along with nuts and bolts as per the sample. Coupling the pump with the motor . P/F of gland packing .Priming the pump .Testing the pump on full load . The Job includes cost of material, labour(skilled and unskilled), loading charges, hire charge of tool and tackles, to and fro carriage charges.
Repairs to 300 mm dia foot valve assembly of pumping unit no.1 installed at LIS Aryanpuira . The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged / worn-out foot valve mechanism with flap & rings etc. Complete repair to the damaged flap plate and strainer by way welding. Providing / fitting of new rubber washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction lines with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. Complete Job
Repairs to 10cusec discharge, 18 m head H.C Pump unit no. 01 installed at LIS Manda-I. The job involves removing the pump top cover , extraction of pump shaft assembly & shifting of the pump shaft assembly by manual / mechanical means to workshop. Complete dismantling of the pump assembly. Rebuilding of impeller by using good quality electrodes. Turning/machining of rebuild impeller on lathe machine for proper size . Providing/ fitting of 2no. bearings ( 6210) and 2 no. bushes as per the sample . Assembling of the pump parts. Carriage / transportation of the pump assembly back from workshop to the site of installation at LIS. Fitment of pump along with replacement of old damaged studs, gaskets, alignment setting at its position, p/f of gland packing, greasing work etc. Aligning & coupling the pump & motor. Complete testing of the pumping unit on full load. Job includes cost of all material, transportation charges, head load and labour charges for skilled/semiskilled labour, hire charges for tools & tackles. Complete Job
Repairs to 250 mm dia foot valve assembly of pumping unit no.1 installed at LIS Lower Manda . The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged / worn-out foot valve mechanism with flap & rings etc. Complete repair to the damaged flap plate and strainer by way welding. Providing / fitting of new rubber washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction lines with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles.Complete Job
KHALSA ENGG. WORKS
M/S K S ENGG WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .