Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC BOOTH NO 15 SHOPPING COMPLEX URBAN ESTATE PHASE II JALANDHAR CITY PIN 144022 | JALANDHAR | PUNJAB | 144022 | L1 | Accepted-AOC lowest and reasonable bid | |
| 2 | L2₹25.1 L+₹3.8 L (17.6%)Rejected-Finance 25 25 SADAR BAZAR JALANDHAR CANTT | JALANDHAR | JALANDHAR | PUNJAB | L2 | Rejected-Finance Other than lowest bid | |
| 3 | L3₹26.7 L+₹5.4 L (25.1%)Rejected-Finance B 182 NEHRU VIHAR TIMARPUR TIMARPUR NORTH DELHI DELHI 110054 UDYAM DL 04 0017438 | CENTRAL DELHI | DELHI | 110054 | L3 | Rejected-Finance Other than lowest bid | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹43.8 L
EMD Value
₹87,600
Closing Date
24 Feb 2020, 6:00 pmClosed
Garrison Engineer (West) Jalandhar Cantt
Garrison Engineer (West) Jalandhar Cantt
As described in Bill of quantities
2020_MES_322555_1
GE/JAL(W)-73/2019-20
Open Tender
Civil Works
Item Rate
335 days
Jalandhar Cantt
As per Tender Documents
8 documents required · 8 mandatory
₹500
Garrison Engineer (West) Jalandhar Cantt
₹87,600
Yes
13 Mar 2020
6 Feb 2020
26 Feb 2020
6 Feb 2020
24 Feb 2020
19 Feb 2020
Amount
Maintenance, operation and documentation of submersible pumping set, located at Pump house No. 19 and 22 at 11 CSR and Honeymoon Park, including motor, starter, having varying discharge operation at a head greater than 50 feet including operation of various sizes of sluice valve for pumping & distribution, operation of DG sets and Dozers as and when required, on daily basis including “Sunday and Holiday” for eleven calendar months period; round the clock (Maintenance and operation for 24 Hrs) in three shifts, each shift of 08 Hrs duration; by employing Operator (Semi Skilled)-01 No per shift for each pumping set for carrying out above mentioned works complete all as specified and directed on following MES water supply installations:- Notes (Applicable for all items of this Schedule) :- (i) Quantity under Col 3 is variable and shall be calculated actually for 11 months Period of Completion as given in Work Order No 1. (ii) The operator shall be ITI certificate holder or Matriculation pass from recognized board with having minimum two year experience in similar job / trade. (iii) The contractor shall submit name of persons to be deployed at work alongwith their qualifications and experience for approval from GE before the date of commencement of work. (iv) Subsequently action for verification of anticidents of the persons to be deployed shall be taken by the contractor and submit the same to Engineere-in-Charge/GE within 07 days from the date of commencement of work. (v) In certain items, two pump houses have been kept under one item which shall be operated by one operator keeping in view in the vicinity, the rates quoted by the contractor shall be inclusive of this aspect. (vi) Cleaning of area in and around pump houses, borewell, OHTs & common areas (viz cutting of grass & disposal of debris) are deemed to be included in the scope of the work. Default if any noticed in duty of cleaning, recovery will be imposed as per clause specified in the Paticular specification.
All as per Srl Item No 1.00 here-in-before but Pump house No. 6 and 25 at BI Line and MAP BI Line pump house complete all as specified and directed.
All as per Srl Item No 1.00 here-in-before but Pump house No. 15 and 27 at AD Regt and Med Regt pump house complete all as specified and directed.
All as per Srl Item No 1.00 here-in-before but Pump house No. 28 and 29 at K K Vihar - I & II pump house complete all as specified and directed.
All as per Srl Item No 1.00 here-in-before but Pump house No. 13 at Military Hospital pump house complete all as specified and directed.
All as per Srl Item No 1.00 here-in-before but Pump house No. 20 at S J Vihar pump house complete all as specified and directed.
All as per Srl Item No 1.00 here-in-before but Pump house No. 24 at Inf Bn-II pump house/14 SIKH complete all as specified and directed.
Maintenance, operation and documentation of Booster pump of HQ Chief Engineer Zone Office including operation of various sizes of valves on daily basis as per requirement including Saturday, Sunday and holiday for eleven calender months period in two shifts each of 08 Hrs duration by employing operator (Semi Skilled)- 01 No per shift for carrying out above mentioned works complete all as specified and directed.
CHOUDHARY AND SONS
sunrise engineers and contractors
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .