| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹3.0 Cr+₹55,338.79 (0.18%)Rejected-Finance 184 NEAR GOODWAY TAILORS PRITHVIPURA RASAL ROAD BRIDGE JODHPUR RAJASTHAN 342006 | JODHPUR | RAJASTHAN | 342006 | ₹3.0 Cr+₹55,338.79 (0.18%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹3.9 Cr+₹95.4 L (31.9%)Rejected-Finance GODREJ GENESIS BUILDING UNIT NO 609 PLOT NO XI 6TH FLOOR BLOCK EP GP SECTOR V SALT LAKE KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹3.9 Cr+₹95.4 L (31.9%) | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
9 Nov 2022, 12:00 pmClosed
CGM PPandD
1st Floor Bijulee Bhawan Guwahati-1
Turnkey Construction of 02 Nos of 132kV Railway Traction Bay, one each at 132kV Golaghat GSS and 132kV Diphu GSS, AEGCL respectively including Supply of Bay Equipment and line bay materials and associated works etc
2022_AEGCL_27300_1
AEGCL_GOLA_DIPHU
Open Tender
Electrical Works
Turn-key
210 days
AEGCL Golaghat Division
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹6.2 L
7 Jan 2023
10 Oct 2022
10 Nov 2022
11 Oct 2022
9 Nov 2022
18 Oct 2022
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Golaghat GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of AL Power Cables
Supply of Cu Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earth mat (65 x12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
7/3.66 mm GI wire for shielding and down wires for earth shielding wires/lighting spikes etc
Supply of AC Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
T Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV LA and sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV CVT and sutiable for ACSR Panther Conductor
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Dove Clamps for shield wires with connectors
Supply of ABT meter with cubicle as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
For Control & Relay panels
Over current relay/Earth fault relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
T clamp suitable for Single ACSR Panther conductor
T clamp suitable for Twin ACSR Panther to Single ACSR Panther Conductor
Description of Work / Item(s)
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Golaghat GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of AL Power Cables
Supply of Cu Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earth mat (65 x12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
7/3.66 mm GI wire for shielding and down wires for earth shielding wires/lighting spikes etc
Supply of AC Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
T Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV LA and sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV CVT and sutiable for ACSR Panther Conductor
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Dove Clamps for shield wires with connectors
Supply of ABT meter with cubicle as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
For Control & Relay panels
Over current relay/Earth fault relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
T clamp suitable for Single ACSR Panther conductor
T clamp suitable for Twin ACSR Panther to Single ACSR Panther Conductor
Description of Work / Item(s)
Amount
Erection, testing & commissioning of Circuit Breakers including laying & terminating of LT power and control cables as required
132 kV Gang operated SF6 Breakers
Erection, testing & commissioning of Control & Relay Panels including laying & terminating of LT power and control cables as required
For 132 kV Feeder compatible with existing SAS at Golaghat GSS
Erection, testing & commissioning of Current transformers including laying & terminating of control cables as required
132 kV, 400-200/1-1-1 Line CT
Erection, testing & commissioning of Isolators including laying & terminating of LT power and control cables as required
132 kV With Single Earth Switch
132 kV Without Earth Switch
Erection, testing & commissioning of Lightning Arrester including including laying & terminating of control cables as required
132 kV Lightning Arrester
Erection, testing & commissioning of Post Insulator including including laying & terminating of control cables as required
132 kV Post Insulator
Erection, testing & commissioning of CVT including including laying & terminating of control cables as required
132kV CVT
Erection of Mounting structures for different terminal equipments as required for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Erection of Switchyard Lattice Steel Columns
Column Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Erection of Switchyard Lattice Steel Beams
Beam Type 'B1' ( 2 Nos) [ 751.77 Kg/ per Beam ]
Integration of Control Relay Panel into the existing Substation Automation System (SAS) at Golaghat GSS.
Hoisting of Insulator strings, Stringing of Conductors, GI shield wire etc including supply of disc insulator strings, clamps, GI stranded shield wire, connectors etc. As required for whole scope of works including extension part of 132kV Transfer Bus section.
Installation of earthing system with GI flats, electrodes etc. For present scope of area
Construction of Cable Trenches including supply of all materials and labour as per specification and drawing
D Type Trench
B Type Trench
Illumination
Design and installation of outdoor illumination system for the 132kV bay area (consisting of minimum 6 Nos. of LED lamps with fittings etc.) as per specification including supply of all materials.
Erection of Bay Marshalling Kiosk as per drawings and specifications including construction of foundation inclusive of supply of all foundation Materials and Labour as directed.
Erection, testing and Commissssioning of ABT Meter as per specification
Switchyard PCC & gravelling
Providing 80mm thick 1:4:8 PCC base of switcyard as per specification & drawings including supply of all materials
Providing 100mm thick graveling of switcyard as per specification & drawings including supply of all materials
Description of Work / Item(s)
Amount
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Circuit Breaker (1 Set)
Excavation (16.21 Cum per breaker)
Filling (10.73 Cum per breaker)
Brick Soiling (8 Sq.m per breaker)
Formwork (15.36 Sq.m per breaker)
PCC (0.46 Cum per breaker)
RCC (4.22 Cum per breaker)
Reinforcement (209.75 Kg per breaker)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Current Transformer ( 3 Nos.)
Excavation (4.29 Cum per CT)
Filling (3.48 Cum per CT)
Brick Soiling (1.82 Sq.m per CT)
Formwork (6.56 Sq.m per CT)
PCC (0.10 Cum per CT)
RCC (0.52 Cum per CT)
Reinforcement (86.18 Kg per CT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV CVT (3 Nos.)
Excavation (4.29 Cum per CVT)
Filling (3.48 Cum per CVT)
Brick Soiling (1.82 Sq.m per CVT)
Formwork (6.56 Sq.m per CVT)
PCC (0.10 Cum per CVT)
RCC (0.52 Cum per CVT)
Reinforcement (86.18 Kg per CVT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Isolators With/ Without Earth Switch ( 3 Sets)
Excavation (25.13 Cum per Isolator)
Filling (20.40 Cum per Isolator)
Brick Soiling (11.81 Sq.m per Isolator)
Formwork (16.11 Sq.m per Isolator)
PCC (0.72 Cum per Isolator)
RCC (2.83 Cum per Isolator)
Reinforcement (246.07 Kg per Isolator)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Lightning Arresters( 3 Nos)
Excavation (3.52 Cum per LA)
Filling (2.75 Cum per LA)
Brick Soiling (1.56 Sq.m per LA)
Formwork (3.88 Sq.m per LA)
PCC (0.08 Cum per LA)
RCC (0.54 Cum per LA)
Reinforcement (46.65 Kg per LA)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Post Insulator ( 6 Nos)
Excavation (3.52 Cum per PI)
Filling (2.75 Cum per PI)
Brick Soiling (1.56 Sq.m per PI)
Formwork (3.88 Sq.m per PI)
PCC (0.08 Cum per PI)
RCC (0.54 Cum per PI)
Reinforcement (46.65 Kg per PI)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for Lattice Steel Column ( for Columns Type (C1), 4 Nos.)
Excavation (110.55 Cum per Column)
Filling (97.229 Cum per Column)
Brick Soiling (25.5 Sq.m per Column)
Formwork (23.96 Sq.m per Column)
PCC ( 1.79Cum per Column)
RCC (8.59.Cum per Column)
Reinforcement (855.89 Kg per Column)
Description of Work / Item(s)
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Diphu GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors including Junction Box etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of AL Power Cables
Supply of Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earth mat (65 x12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
7/3.66 mm GI wire for shielding and down wires for earth shielding wires/lighting spikes etc
Supply of Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
T Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV LA and sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV CVT and sutiable for ACSR Panther Conductor
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Dove Clamps for shield wires with connectors
Supply of ABT meter with cubicle as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
For Control & Relay panels
Over current relay/Earth Fault Relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
T clamp suitable for Single ACSR Panther conductor
T clamp suitable for Twin ACSR Panther to Single ACSR Panther Conductor
Description of Work / Item(s)
Amount
Circuit Breakers with mounting structures and terminal connectors etc.as applicable as per specification
132 kV Gang operated outdoor SF6 Breakers
Control & Relay Panel with Automation (Simplex Type) complete with BCU, ethernet switch and all accessories as required for SAS integration.
For 132 kV Feeder Capable of integration into Existing SAS at Diphu GSS
Current Transformers (1-phase) with terminal connectors etc. as per specification
132 kV, 400-200/1-1-1 Line CT
Isolators with insulators, terminal connectors, structures complete etc. as per specification
132 kV horizontal centre break isolator With Single Earth Switch (3-phase)
132 kV horizontal centre break isolator Without Earth Switch (3-Phase)
Lightning Arrester with terminal connectors etc. as per specification
132 kV Lightning Arrester
Post Insulator with terminal connectors etc. as per specification
132 kV Post Insulator
132 kV CVT with terminal connectors including Junction Box etc as per specfication.
Supply of Mounting structures with mounting & foundation bolts as per drawings supplied for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Supply and Design of Bay Steel Structures except equipment mounting structures
Column
Column Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Beams
Beam Type 'B1' ( 2 Nos.) [ 751.77 Kg/ per Beam ]
Supply of AL Power Cables
Supply of Control Cables
Supply of ACSR Panther Conductor
Disc Insulator Strings complete with all hardware fittings, clamps etc.
10 Disc Tension Insulator String
9 Disc Suspension Insulator String
Supply of Earthing System Materials
Main Earth mat (65 x12 mm GI Flat)
65x12 GI flat for risers, equipment earthing, column earthing etc.
50x6 GI flat Earthing conductor for earthing of indoor L.T & control panels, Junction box, Marshalling boxes, cable trenches etc.
40 mm Dia. 3mtr long M.S. rod earth electrode (driven) with test link for each tower with earth peak, LAs & CVTs.
7/3.66 mm GI wire for shielding and down wires for earth shielding wires/lighting spikes etc
Supply of Bay Marshalling Kiosk along with mounting structure
Clamps and Connectors
T Clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV LA and sutiable for ACSR Panther Conductor
Tee Connector Rigid through Type alongwith all hardware fittingsfor 132kV CVT and sutiable for ACSR Panther Conductor
PG clamp With Connectors and all hardware fittings sutiable for ACSR Panther Conductor
Dove Clamps for shield wires with connectors
Supply of ABT meter with cubicle as per specification
Mandatory Spares
For 132 kV SF6 Circuit Breakers
Interrupter
Tripping Coil
Closing Coil
For Control & Relay panels
Over current relay/Earth Fault Relay
Distance protection Relay
Master Trip Relay
132kV Lightning Arrester
132kV , 400-200/1-1-1 Line CT
132kV, isolator moving and fixed contact
Terminal connectors for 132kV CT
Terminal connectors for 132kV isolator
T clamp suitable for Single ACSR Panther conductor
T clamp suitable for Twin ACSR Panther to Single ACSR Panther Conductor
Description of Work / Item(s)
Amount
Erection, testing & commissioning of Circuit Breakers including laying & terminating of LT power and control cables as required
132 kV Gang operated SF6 Breakers
Erection, testing & commissioning of Control & Relay Panels including laying & terminating of LT power and control cables as required
For 132 kV Feeder compatible with existing SAS at Diphu GSS
Erection, testing & commissioning of Current transformers including laying & terminating of control cables as required
132 kV, 400-200/1-1-1 Line CT
Erection, testing & commissioning of Isolators including laying & terminating of LT power and control cables as required
132 kV With Single Earth Switch
132 kV Without Earth Switch
Erection, testing & commissioning of Lightning Arrester including including laying & terminating of control cables as required
132 kV Lightning Arrester
Erection, testing & commissioning of Post Insulator including including laying & terminating of control cables as required
132 kV Post Insulator
Erection, testing & commissioning of CVT including including laying & terminating of control cables as required
132kV CVT
Erection of Mounting structures for different terminal equipments as required for
132 kV Line CT
132kV Isolator With Single Earth Switch
132kV Isolator Without Earth Switch
132kV Lightning Arrester
132kV Post Insulator
132kV CVT
Erection of Switchyard Lattice Steel Columns
Column Type 'C1' ( 4 Nos.) [ 2317.41 Kg/ per Column ]
Erection of Switchyard Lattice Steel Beams
Beam Type 'B1' ( 2 Nos) [ 751.77 Kg/ per Beam ]
Integration of Control Relay Panel into the existing Substation Automation System (SAS) at Diphu GSS.
Hoisting of Insulator strings, Stringing of Conductors, GI shield wire etc including supply of disc insulator strings, clamps, GI stranded shield wire, connectors etc. As required for whole scope of works including extension part of 132kV Transfer Bus section.
Installation of earthing system with GI flats, electrodes etc. For present scope of area
Construction of Cable Trenches including supply of all materials and labour as per specification and drawing
D Type Trench
B Type Trench
Illumination
Design and installation of outdoor illumination system for the 132kV bay area (consisting of minimum 6 Nos. of LED lamps with fittings etc.) as per specification including supply of all materials.
Erection of Bay Marshalling Kiosk as per drawings and specifications including construction of foundation inclusive of supply of all foundation Materials and Labour as directed.
Erection, testing and Commissssioning of ABT Meter as per specification
Switchyard PCC & gravelling
Providing 80mm thick 1:4:8 PCC base of switcyard as per specification & drawings including supply of all materials
Providing 100mm thick graveling of switcyard as per specification & drawings including supply of all materials
Description of Work / Item(s)
Amount
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Circuit Breaker (1 Set)
Excavation (16.21 Cum per breaker)
Filling (10.73 Cum per breaker)
Brick Soiling (8 Sq.m per breaker)
Formwork (15.36 Sq.m per breaker)
PCC (0.46 Cum per breaker)
RCC (4.22 Cum per breaker)
Reinforcement (209.75 Kg per breaker)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Current Transformer ( 3 Nos.)
Excavation (4.29 Cum per CT)
Filling (3.48 Cum per CT)
Brick Soiling (1.82 Sq.m per CT)
Formwork (6.56 Sq.m per CT)
PCC (0.10 Cum per CT)
RCC (0.52 Cum per CT)
Reinforcement (86.18 Kg per CT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV CVT (3 Nos.)
Excavation (4.29 Cum per CVT)
Filling (3.48 Cum per CVT)
Brick Soiling (1.82 Sq.m per CVT)
Formwork (6.56 Sq.m per CVT)
PCC (0.10 Cum per CVT)
RCC (0.52 Cum per CVT)
Reinforcement (86.18 Kg per CVT)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Isolators With/ Without Earth Switch ( 3 Sets)
Excavation (25.13 Cum per Isolator)
Filling (20.40 Cum per Isolator)
Brick Soiling (11.81 Sq.m per Isolator)
Formwork (16.11 Sq.m per Isolator)
PCC (0.72 Cum per Isolator)
RCC (2.83 Cum per Isolator)
Reinforcement (246.07 Kg per Isolator)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Lightning Arresters( 3 Nos)
Excavation (3.52 Cum per LA)
Filling (2.75 Cum per LA)
Brick Soiling (1.56 Sq.m per LA)
Formwork (3.88 Sq.m per LA)
PCC (0.08 Cum per LA)
RCC (0.54 Cum per LA)
Reinforcement (46.65 Kg per LA)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for 132kV Post Insulator ( 6 Nos)
Excavation (3.52 Cum per PI)
Filling (2.75 Cum per PI)
Brick Soiling (1.56 Sq.m per PI)
Formwork (3.88 Sq.m per PI)
PCC (0.08 Cum per PI)
RCC (0.54 Cum per PI)
Reinforcement (46.65 Kg per PI)
Construction of Foundation Including. Supply of All Foundation Materials & Labour as required for Lattice Steel Column ( for Columns Type (C1), 4 Nos.)
Excavation (110.55 Cum per Column)
Filling (97.229 Cum per Column)
Brick Soiling (25.5 Sq.m per Column)
Formwork (23.96 Sq.m per Column)
PCC ( 1.79Cum per Column)
RCC (8.59.Cum per Column)
Reinforcement (855.89 Kg per Column)
HI-TECH CORPORATION
ABN Tower and Transmission Private Limited
HI-TECH CORPORATION
ABN Tower and Transmission Private Limited
ABN Tower and Transmission Private Limited
Jayanta Khaund
Jayanta Khaund
ABN Tower and Transmission Private Limited
HI-TECH CORPORATION
ABN Tower and Transmission Private Limited
HI-TECH CORPORATION
ABN Tower and Transmission Private Limited
ABN Tower and Transmission Private Limited
Jayanta Khaund
Jayanta Khaund
ABN Tower and Transmission Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .