Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC STANDS LOWEST BIDDER | |
| 2 | L2₹2.8 L+₹50,000 (22.2%)Rejected-Finance | L2 | Rejected-Finance DOES NOT STAND LOWEST BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical DOES NOT QUALIFY AS PER PQC |
Tender Value
₹2.1 L
EMD Value
₹4,000
Closing Date
18 Dec 2019, 6:00 pmClosed
SE O and MC III OBRA
office of SE O and MC III OBRA
Dismantling shifting installation commissioning of Voltas Make 17Tr rating Package Air conditioning with its ducting from ATPS to ESP control room of 13th unit BTPS Obra
2019_RVUNL_396619_2
T-16/SE-III/BTPS/EMD-II/19-20
Open Tender
Electrical Works
Fixed-rate
20 days
OBRA
AS PER PQC
3 documents required · 3 mandatory
₹590
UPRVUNLTD P and AD BTPS OBRA
₹4,000
21 Mar 2020
3 Dec 2019
20 Dec 2019
3 Dec 2019
18 Dec 2019
3 Dec 2019
3 Dec 2019 - 18 Dec 2019
Dismantalling & shifting of old water cooled package type Air conditioning with piping & cables etc from ‘A’TPS to ESP 13th unit ‘B’TPS.
Installation of old water cooled package type Air conditioning at new location including water piping & cabling etc.
Removal of old duct & installation at ESP control room of 13th unit with required modifications.
Supply& installation of 8.5 TR Scroll Compressor Make: Danfoss Model: SM110 440VAC, 3Phase, 50Hz
SUPREME ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .