Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-Finance | ₹6.7 L | L1 | Accepted-Finance OK |
| 2 | L2₹6.9 L+₹12,541.34 (1.86%)Accepted-Finance | ₹6.9 L+₹12,541.34 (1.86%) | L2 | Accepted-Finance OK |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-DD NOT BE SUBMEETED |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-DD NOT BE SUBMEETED |
Tender Value
₹6.3 L
EMD Value
₹12,540
Closing Date
25 Aug 2026, 1:00 pmClosed
junier engneer
nagar palika pindwara
Construction of cc road and drain work near jyantilal dharamaram kumhar to dilip bhai welding
2026_DLB_586553_1
6049
Open Tender
Civil Works
Percentage
90 days
pindwa
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
MD RISAL
₹12,540
Yes
26 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | - | cum | 235.5 | - |
| 1.02 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 2 than | - | cum | 185.54 | - |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | cum | 4,575 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | cum | 5,910 | - |
| 1.05 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete : | 1 | sqm | 236.5 | ₹236.26 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1042969.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_1042969.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .