150 days
Expenditure
General
20
7 conditions
Regular Order [Minimum 80%]- Only those firms will be considered for placement of regular order who have (i) successfully commissioned minimum 01 (one) set of the equipment (tendered item) in 3 phase Electric Locomotives over Indian Railways and prototype clearance has been issued as on tender closing date and/ or (ii) Successfully supplied and commissioned the propulsion equipment which are tested and approved for regular use by CLW/BLW Traction Converter, Auxiliary converter and Vehicle Control Unit. They should have proven capability for successful interfacing and commissioning of these equipment in 3-phase Electric Locomotives over Indian Railways as on Tender closing date.
Developmental order [Up to 20%]-Bidder shall fullfil the following conditions of eligibility for considering them technically suitable for developmental order. (i) Designed, developed and supplied minimum 1(One) Propulsion Equipment of electric/diesel locomotive/EMU/DEMU for Indian Railway which shall be under commercial service as on the tender closing date, or (ii) Designed, developed and supplied Propulsion equipment for Railway locomotives of minimum 4000 HP worldwide which shall be in commercial service for a period of minimum 2 years preceding the tender closing date. (iii) In case the bidder has not supplied the vehicle control unit, the bidder can source the vehicle control unit from established and approved source.
The firms who do not fulfil the criteria either for placement of regular order or for developmental order, they must submit their credential details i.e., Machinery and Plant, Testing Facilities, QAP, Technical manpower etc. In deserving cases, offers from new suppliers may be considered for only a small quantity not more than 5 percent of the tendered quantity.
The bidder must provide source code and complier of software of Traction Converter, Auxiliary Converter and Vehicle Control Unit (VCU to WCR). The option of " ...... long term life time support ....... " as an alternate of " ........ source code and complier of software ....... " as indicated in para 1.5.1 of the specification is no longer available in scope of supply.
In case, the bidder is a consortium of firms, relevant documents clearly defining the responsibility and role of each of the consortium members in the execution of the work should be submitted along with the offer against this tender.
Bidder : (i) An Indian manufacturing company. (ii) Indian subsidiary / associate company of a foreign manufacturer. (iii) An Indian firm having MoU/Consortium/JV agreement with the foreign company qualifying the eligibility criteria. Propulsion Equipment : Set of equipment consisting IGBT traction converter, IGBT auxiliary converter, vehicle control unit, display unit etc. with interfacing.
Bidders must fulfill the "conditions for responsiveness of offer" mentioned in the tender documents, failing which, their offer will be summarily rejected.
44 conditions
Validity of offer: Validity of offers should be minimum 150 days from the date of tender opening. Offers with deviation to the tendered validity period will be summarily rejected without any back reference.
IN CASE BIDDER IS INDIAN FIRM OR FROM A COUNTRY THAT DOES NOT SHARE LAND BORDER WITH INDIA, SHALL CONFIRM AS UNDER:- I have read the clauses regarding restrictions on procurements from a bidder of a country which shares a land border with India as per Annexure F of WCRs e-TENDER DOCUMENT FOR SUPPLY CONTRACTS (Ver. 7.0, applicable w.e.f. 31.10.2022) (with latest corrigendum issued till date of tender closing). with Ministry of Finance Order (Public Procurement No. 4), F. No. 7/10/2021-PPD(1) dated 23/02/2023 circulated vide OM No. F.7/10/2021-PPD dated 23.2.2023 (copy enclosed as enclosed document) ; I certify that this bidder (in whose behalf I am submitting this bid) is not from such a country which shares a land border with India (Note:- Indian firms and firms from countries not sharing border with India, may please confirm as YES)
IN CASE BIDDER FIRM IS FROM A FOREIGN COUNTRY THAT SHARES LAND BORDER WITH INDIA, SHALL SUBMIT CERTIFICATE AS UNDER:- I certify that this bidder (in whose behalf Iam submitting this bid) is from such a country which shares a land border with India with regard to contents of Annexure F of WCRs e-TENDER DOCUMENT FOR SUPPLY CONTRACTS (Ver. 7.0, applicable w.e.f. 31.10.2022) (with latest corrigendum issued till date of tender closing). with Ministry of Finance Order (Public Procurement No. 4), F. No. 7/10/2021-PPD(1) dated 23/02/2023 circulated vide OM No. F.7/10/2021-PPD dated 23.2.2023; and I further certify that this bidder has been registered with the Competent Authority. I hereby further certify that this bidder fulfils all requirements in this regard and is eligible to be considered. (Note 1; WHEREVER A BIDDER FROM SUCH A FOREIGN COUNTRY THAT SHARES BORDER WITH INDIA QUOTES, HE WILL NEED TO UPLOAD A COPY OF VALID REGISTRATION BY THE COMPETENT AUTHORITY (OR DOCUMENTARY EVIDENCE OF EXEMPTION AS PER NOTE 2 BELOW) WITHOUT WHICH THE OFFER SHALL BE SUMMARILY REJECTED.) (NOTE 2: Restrictions under this rule shall not apply to bids from such countries (even if sharing a land border in India) to which the government of India has extended lines of credit or in which the government of India is engaged in developmental projects. For updated lists of credit or in which line of credits have been extended or in which developmental projects are undertaken are given in the website of the Ministry of External affairs and in such firm will need to submit such documentary evidence.) The terms 'bidder' and 'bidder from a country which shares a land with India' shall be as defined in para II and III respectively of Annex III of Ministry of Finance Order (Public Procurement No. 4), F. No. 7/10/2021-PPD(1) dated 23/02/2023 circulated vide OM No. F.7/10/2021-PPD dated 23.2.2023.
Jurisdiction of Court :- As per Para 2703 of IRS Condition of Contract the Courts of the place from where the acceptance of tender has been issued shall alone have jurisdiction to decide any dispute arising out of or in respect of the contract.
PLASTIC WASTE MANAGEMENT RULE 2016:- It is certified that for execution of this contract, the plastic packing material or commodities which are made out of Compostable Plastic or Biodegradable Plastic shall be purchased from firms having certification by CPCB for manufacture or sale of plastic packing or commodities made from Compostable Plastic or Biodegradable Plastic as per rule 4 (4) of Plastic Waste Management rule 2016. It is also certified that we shall also not use any other category of plastic, such as Bio compostable or Oxo- degradable or Oxo-bio-degradable or the like, which are not recognized under Plastic Waste Management Rule 2016 with all amendments.
PVC-IEEMA PVC FORMULA FOR TRACTION INVERTORS & CONVERTORS (Power electronics products) for indigenous components vide IEEMA CIRCULAR NO. IEEMA/ PVC/PE/2010 EFFECTIVE FROM 01.07.2010: P1=Po/100 [16+26 x C/Co+13 x AL/ALo + 18 x FE/FEo + 9 x IM/IMo + 18 x W/Wo] 2. for import content P2: CIF/100 [ ER/ERo (100+D)-(100+Do)] (copy enclosed).
Conditions for Annual Maintenance after expiry of Warranty period of the equipment: A contract will be concluded by homing shed where the locomotives installed with IGBT BASED 3-PHASE DRIVE PROPULSION EQUIPMENT will be homed. Execution of contract for maintenance of the equipment will be monitored by concerned homing shed Authority. Rate of maintenance of equipment is already mentioned in this tender.
CONTRACT PERFORMANCE GUARANTEE FOR AMC:The contactor shall submit to concerned homing shed performance Guarantee for amount equivalent to 5 % of contract agreement for (MX12 + 2) months where M is the no. of months for which contract agreement is to be signed. This Performance Guarantee shall be in the form of Bank Guarantee. The user Railway may forfeit the BG in case of the failure of the firm in execution of the contract or in the event of breach of any terms and conditions of contract by the contractor. Reference as per AMC para 15.0.
The bidders/ tenderers have to quote the rates for Capital cost of IGBT BASED 3- PHASE DRIVE PROPULSION EQUIPMENT i.e. supply, installation, testing and commissioning of IGBT BASED 3-PHASE DRIVE PROPULSION EQUIPMENT system. During the maintenance period after completion of warranty period, the Contractor shall be paid for its Maintenance obligations @ 2.5% (Two point five percent) of the total Capital cost of IGBT BASED 3-PHASE DRIVE PROPULSION predefined cost of AMC equipment pertaining to the fleet in holding with Authority per annum, from the date of completion of Warranty Period till completion of Maintenance (i.e. 03 years after expiry of normal warranty period).
Formula for Price adjustment for Maintenance Price (WPI): Lump sum payment for Maintenance shall be adjusted every quarter for changes in rates and prices of various inputs in accordance with the formula given below: V=P x (Wi -W0)/W0 Where V = Increase or decrease in the quarterly lump sum payment p = quarterly lump sum payment due to the Contractor after adjusting any reduction in payment for noncompliance of the Maintenance Requirements. W0 = The wholesale price index (all commodities) for the month of the tender opening date as Base date' Wi = The wholesale price index (all commodities) for the first day of the quarter under consideration determining the price adjustment."
For AMC Contract:- Base date of WPI for price adjustment, shall be the tender closing date ( or month which will be available).
Code of Integrity, Misdemeanor and Penalties :- Bidders are reminded to carefully go through the IRS conditions of contract (included and uploaded along with the bid document) particularly Para 2500 pertaining to "Code of Integrity, Misdemeanor and Penalties". Bidders shall certify that none of their sister concern or affiliates (such as having common partner/director/promoter/owner/holding company decision control etc.) have participated in this tender & which can give rise to a conflict of interest or fall under anti-competitive practices.The offers of all such sister concern or affiliates if quoted are liable to be rejected as per relevant provisions of IRS terms and conditions. Bidders shall abide by the Code of Integrity in general, with specific reference to conflict of interest [Para 2502 (e)], anti competitive practices [Para 2502(c)] and obligation to proactive disclosures [Para 2503]. Bidders shall fully responsible for the declaration/certification regarding Code of Integrity, Misdemeanor and Penalties given in commercial compliance and it shall not be the Railways responsibility to verify the same. Bidders shall be liable for all consequences of violation of Code of Integrity (including termination of contract) as per provisions in Para 2505 & 2506 of IRS conditions of contract , if detected, at any stage.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Inspection:For Regular Orders: Inspection by TPI agency at firm's premises. For Developmental Order: Capacity-cum- capability assessment followed by prototype approval byRDSO/CLW/BLW, if not done earlier for the tendered item. Inspection of balance qty is to be done by TPIagency at firm's premises. Note- Special conditions for inspection through TPI are as per Annexure-II (uploaded).
INSPECTION OF BOUGHT OUTS & CRITICAL RAW MATERIALS: 1) Inspecting Engineer of Inspecting Agencyshall ensure that all the documents,i.e. Tax Invoice (priced or un-priced), Import documents (if any), Testcertificates/WTC, Delivery Challan etc. of all the bought outs & Test certificates of critical raw materials,submitted by Principal firm or Sub vendor at the time of inspection are original and relate to each other in allrespects as per requirement of the purchase order to ensure that the Bought Outs & critical raw materialshave been genuinely procured from approved sources or as per PO. A copy of all such documents shall be uploaded & provided by the Inspecting Engineer along with the Inspection Certificate to WCR along withcomplete traceability records like Sr. No. Make etc. Inspection certificate issued without these documents willbe considered as incomplete Inspection Certificate. 2) Firm should provide all the above stated documentsas required by the Inspecting Engineer of Inspecting Agency for verification and uploading by the InspectingEngineer along with the Inspection Certificate. Bills of the firm will not be passed with incomplete InspectionCertificate issued without these documents.
The condition of comprehensive annual maintenance contract after completion of warranty period will be as per the tendered specification no.CLW/AMC/CD& D/01 issued on March 2016 which will be executed by the Homing Shed where the loco will be homed. This supply contract will include rate of AMC but the actual AMC will be operated by homing shed and the supplier will be bound to accept the AMC at this rate.
Warranty clause- As per clause 2 of special condition of contract i.e. The Warranty of the complete system will be 72 months from the delivery or 60 months from the date of satisfactory commissioning and acceptance test of the item, whichever is earlier. The contractor shall ensure round the clock availability of qualified engineer at the nominated electric loco shed for the first two years. After expiry of warranty, the AMC for three years as per terms and conditions shall be applicable.
Packing Conditions: (1) As per IRS Conditions of Contract (uploaded). (2) To avoid fire hazard, non-flammable material only to be used for packing.Material like hay or Dry Grass should not be used.
Penalty Clause for delay in attention of Propulsion System at Loco Sheds under Warranty will be applicable (Copy attached).
4 conditions
Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.
Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.
Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.
The Bidders quoting for less than 50 percent of the tendered quantity will be treated as unresponsive and shall be summarily rejected.
1 location across Delhi · 47 Set total
Line & Traction converter cubicle, unit2 [Line & Traction converter cubicle, unit2 to MEDHA Item Code SP675UV2101013. for Three Phase propilsion equipment and control system for electric train sets, Type- MAE675UV2.]
20255020~NFR
20255020
PAC - Indigenous
Goods
Delhi
₹0
₹1.1 L
6 Feb 2026
30 Jan 2026
1 item · 47 Set total
IGBT BASED 3-PHASE DRIVE PROPULSION EQUIPMENTS. Detailed description as per Annexur e-I attached. [ Warranty Period: 72 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/STORES/TUGLAKABAD, WCR | Delhi | 47.00 Set |
| Total | 47 Set | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5394876.pdf
ATTACHMENT
AnnexureA.pdf
CORRIGENDUM
CLW-ES-3-0124ALT-0.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .