| 1 | L1₹15.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.0 L+₹3.0 L (19.9%)Rejected-Finance CHINNAMPALAYAM POLLACHI | L2 | Rejected-Finance L2 |
Tender Value
₹17.3 L
EMD Value
₹18,000
Closing Date
23 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE PROJECT DIRECTOR
THE PROJECT DIRECTOR, DRDA, COIMBATORE
Coimbatore District providing 8 Nos of works in Habitation Improvement under AGAMT II 2021-22 at Sokkanur, Solavampalayam, Nallattipalayam, Sulakkal, Andipalayam and Mullupadi Panchayat in Kinathukadavu Block Pkg.No.06/AGAMT II/2021-22
2022_RDTN_238550_1
Roc No 1006/2022/B2 dt 21.06.2022
Open Tender
Civil Works
Item Rate
180 days
Kinathukadavu Block, Coimbatore District
Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹18,000
DRDA, COIMBATORE
29 Nov 2022
1 Jul 2022
23 Aug 2022
1 Jul 2022
23 Aug 2022
1 Jul 2022
7 Jul 2022
Amount
Name of the work : 1. Construction of Compound wall to Burial Ground front side @ Sattakkalpudur H/o Sokkanur Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,
Supplying and erecting the Centering works including all cost of materials and labour charges etc., for Column
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Plastering with C.M 1:5 mix,to 12mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
Name of the work : 2. Drilling of 150mm ф new Borewell with Handpump at Mayanam @ Sattakkalpudur H/o Sokkanur panchayat
Hydrogeological Survey Charges
Drilling of 150mm dia vertical bores in overburden soil to the required depth including labour charges for inserting casing pipe in the drilled holes including transportation charges for the rig and supporting vehicles from one place to another.
Drilling of 150mm dia vertical bores in hard rock areas to the required depth including labour charges for inserting casing pipe in the drilled holes including transportation charges for the rig and supporting vehicles from one place to another.
Supply and installation of 150mmф PVC Casing Pipes to the required length incl all cost etc.,
Name of the work :3. Providing CC Pavement Pavement from sattakkalpudur Mayanam @ Sattakkalpudur H/O Sokkanur pt
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Cement Concrete 1:2:4 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Name of the work :4. Drilling of 150mm ф new Borewell with Handpump at Mayanam @ Solavampalayam H/o Solavampalayam panchayat
Hydrogeological Survey Charges
Drilling of 150mm dia vertical bores in overburden soil to the required depth including labour charges for inserting casing pipe in the drilled holes including transportation charges for the rig and supporting vehicles from one place to another.
Drilling of 150mm dia vertical bores in hard rock areas to the required depth including labour charges for inserting casing pipe in the drilled holes including transportation charges for the rig and supporting vehicles from one place to another.
Supply and installation of 150mmф PVC Casing Pipes to the required length incl all cost etc.,
Name of the work :5. Drilling of 150mm ф new Borewell with Handpump at Mayanam @ Nallattipalayam H/o Nallattipalayam panchayat
Hydrogeological Survey Charges
Drilling of 150mm dia vertical bores in overburden soil to the required depth including labour charges for inserting casing pipe in the drilled holes including transportation charges for the rig and supporting vehicles from one place to another.
Drilling of 150mm dia vertical bores in hard rock areas to the required depth including labour charges for inserting casing pipe in the drilled holes including transportation charges for the rig and supporting vehicles from one place to another.
Supply and installation of 150mmф PVC Casing Pipes to the required length incl all cost etc.,
Name of the work : 6.Improvements to the Burial Ground (Cremation Shed) and CC Pavement @ Sulakkal H/O Sulakkal Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance etc.,
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted Complete complying with stanard specification.
Plastering with C.M 1:5 mix,to 12mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
Plastering with C.M 1:3 mix,to 10mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
Earth work excavation for cutting in all siols and sub soil to full depth and refilling with excavated earth in layers of not more than 15cm thick well ramed and consolidated and depositing the surplus earth in all place shown by Departmental officer with initial lead and lift, etc including all the site complete complying with standrad specifications as per SS 20B
Cement concrete 1:4:8 mix using 40mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Supplying & Erecting Shuttering for sides & soffiots including necessary supports & strutting and including all labour charges and conveyance of all materials in all etc., complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix using 20mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Cement concrete 1:2:4 mix using 20mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Name of the work : 7. Construction of Compound wall and CC Pavement to Mayanam front side @ Manjampalayam H/o Andipalayam pt
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,
Supplying and erecting the Centering works including all cost of materials and labour charges etc., for Column
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Plastering with C.M 1:5 mix,to 12mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
Earth work excavation for cutting in all siols and sub soil to full depth and refilling with excavated earth in layers of not more than 15cm thick well ramed and consolidated and depositing the surplus earth in all place shown by Departmental officer with initial lead and lift, etc including all the site complete complying with standrad specifications as per SS 20B
Cement concrete 1:4:8 mix using 40mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Supplying & Erecting Shuttering for sides & soffiots including necessary supports & strutting and including all labour charges and conveyance of all materials in all etc., complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix using 20mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Cement concrete 1:2:4 mix using 20mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Name of the work : 8. Construction of Compound wall in Mayanam front side@ Mullupadi H/o Mullupadi pt
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Supplying and erecting the Centering works including all cost of materials and labour charges etc.,
Supplying and erecting the Centering works including all cost of materials and labour charges etc., for Column
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed
Plastering with C.M 1:5 mix,to 12mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
Painting two coats with Exterior Emulsion using best quality of Emulsion , brushes, scaffolding charges etc., complete with standard specifications and as directed by the departmental officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MK ROAD WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .