Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹98,622.45Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.0 L+₹2,629.93 (2.67%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Invalid Regd Card |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
22 Aug 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
CO lane from HO Umer Khurshid Najar upto main road near Islamia School Ward No 07 MC Bijbehara
2026_PWDJK_320128_1
NIT 64 of RnB/Ang/2026-27/5387-96 Dt 08/08/26
Open Tender
Civil Works
Percentage
10 days
Bijbehara
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Executiver Engineer rnB Division Anantnag
₹3,100
31 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Engagement of Jcb for levelling, Cutting and making flat surfaces complete job | 5 | hour | - | - |
| 3 | P/l dry stone soling duly hand packed & consolidated with hand rammers inc. all carriage complete job. | 22.1 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade M-7.5 excluding the cost of centering and shuttering - All work at all levels in: 1:4:8 (1 Cement: 4 coarse sand & graded stone aggregate 40 mm nominal size) including cost and carriage of all materials involved upto site of work complete | 14.58 | cum | - | - |
| 5 | Providing and laying in position cement concrete in excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials involved upto site of work complete | 7.06 | cum | - | - |
| 6 | Providing and fixing of signboards and geotech photographs before and after completion of site | 1 | no | - | - |
stage.html
html • 0.02 MB
finance_1063161.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1063161.xls
BOQ • 0.26 MB
CORRIGENDUMDATE64Allitems.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .