| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC NO 15B 17C PANAGAL 2ND ST MATHICHIYAM MADURAI 20 | MADURAI | MADURAI | TAMIL NADU | 20 | ₹7.8 L Quoted ₹9.1 L | L1 | Accepted-AOC AWARD OF work |
| 2 | L2₹11.9 LRejected-Finance | ₹11.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹12.3 LRejected-Finance | ₹12.3 L | L3 | Rejected-Finance L3 |
| 4 | L4₹12.5 LRejected-Finance | ₹12.5 L | L4 | Rejected-Finance L4 |
| 5 | L5₹12.8 LRejected-Finance | ₹12.8 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | K.T. PAUL RAJ L4 | ALAGAPPA CONSTRUCTIONS L2 | HRITHIC CONSTRUCTIONS L5 | SHAKTHI CONSTRUCTION L3 | S KUMARA PANDIAN L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 19 | M3 | 150 ₹2,850 | 200 ₹3,800 | 100 ₹1,900 | 200 ₹3,800 | 72 ₹1,368 |
| 2.00 | Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer. | 510 | M3 | 380 ₹1.9 L | 500 ₹2.5 L | 400 ₹2.0 L | 450 ₹2.3 L | 105 ₹53,550 |
| 3.00 | Supplying and filling with M. sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 4 | M3 | 1,800 ₹7,200 | 2,000 ₹8,000 | 2,000 ₹8,000 | 1,800 ₹7,200 | 63 ₹252 |
| 4.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete. | 102 | M3 | 5,500 ₹5.6 L | 4,500 ₹4.6 L | 5,800 ₹5.9 L | 5,000 ₹5.1 L | 5,400 ₹5.5 L |
| 5.00 | RCC 1:1.5:3 using ( M20 ) 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Raft ) | 5 | M3 | 9,000 ₹45,000 | 8,000 ₹40,000 | 8,000 ₹40,000 | 9,500 ₹47,500 | 4,500 ₹22,500 |
| 6.00 | PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete. | 6 | M3 | 8,500 ₹51,000 | 10,000 ₹60,000 | 7,000 ₹42,000 | 9,500 ₹57,000 | 4,500 ₹27,000 |
| 7.00 | RCC 1:1.50:3, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete. | 3 | M3 | 10,000 ₹30,000 | 10,000 ₹30,000 | 8,000 ₹24,000 | 12,000 ₹36,000 | 4,500 ₹13,500 |
| 8.00 | PCC 1:2:4, using 20mm HBG metal foundation with out form work including cost of cement, all materials, labour, lead, lift, etc. complete. | 3 | M3 | 7,000 ₹21,000 | 6,000 ₹18,000 | 9,000 ₹27,000 | 6,000 ₹18,000 | 2,100 ₹6,300 |
| 9.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete. | 501 | Kg | 85 ₹42,585 | 90 ₹45,090 | 85 ₹42,585 | 85 ₹42,585 | 63 ₹31,563 |
| 10.00 | Brickwork in CM 1:3 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead,water charges, lift, etc., complete. | 11 | M3 | 8,000 ₹88,000 | 6,800 ₹74,800 | 8,000 ₹88,000 | 6,800 ₹74,800 | 5,400 ₹59,400 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
4 Mar 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Earth work excavation, Gravel filling work site, Road area foundation at Jeyamangalam, in Theni DT
2026_EB_667243_1
SE/GCC/Madurai F. Specn. No.076/2025-26
Open Tender
Civil Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,000
26 May 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer.
Supplying and filling with M. sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete.
RCC 1:1.5:3 using ( M20 ) 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Raft )
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.50:3, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
PCC 1:2:4, using 20mm HBG metal foundation with out form work including cost of cement, all materials, labour, lead, lift, etc. complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Brickwork in CM 1:3 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead,water charges, lift, etc., complete.
Plastering with CM 1:5, 20mm thick including cost of all materials, labour, lead, lift, etc. complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_801585.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid