| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | -2.10% | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 CrAdmitted-Finance AWAS VIKAS COLONY BUDAUN | BUDAUN | BUDAUN | -1.10% | ₹4.0 Cr | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹22.1 L
Closing Date
6 Mar 2026, 3:00 pmClosed
DEPUTY DIRECTOR CONSTRUCTION MANDI PARISHAD
DEPUTY DIRECTOR CONSTRUCTION MANDI PARISHAD NAVIN MANDI STHYAL BAREILLY
Strengthening of Internal Roads by HMP and Laying work of interlocking tiles, Construction and repairing of drain, Construction of 01 No. RCC crossing Culvert, Repairing and Replacement of AC Sheet etc Work NMY Ujhani
2025_RKUMP_1091610_4
E-Tender-Ujhani-1200
Open Tender
Civil Works
120 days
Ujhani
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
DDC MANDI PARISHAD
₹22.1 L
Yes
10 Mar 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
G- 2 -Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 with 45 -63 mm stone ballast as per Technical Specification Clause 404 Morth
G- 3 -Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 with 45 -63 mm stone ballast as per Technical Specification Clause 404 Morth
Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 Morth
Providing & applying Tack coat with bitumen VG-10 grade using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause Morth &H 503
Providing & laying of dense graded Bituminous 50mm thickMacadam with bitumen VG-30 Bulk with 100-120 TPH batch type hot mix plant producing on average output of 75 tonnes per hour using crushed aggregates of specified grading ,premixed with bituminous binder@ 4.0-4.50 percent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher wih sensor control to the required grade ,level and alignment and rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per clause MORTH specification clause 507 complete in all respects.
Providing & laying of Bituminous Concrete 30mm thickwith bitumen VG-10 Bulk with 100-120 TPH batch type hot mix plant producing on average output of 75 tonnes per hour using crushed aggregates of specified grading ,premixed with bituminous binder@ 5.4 to 5.6 percent of mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher wih sensor control to the required grade ,level and alignment and rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per clause MORTH specification clause 509 complete in all respects.
Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade/color using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe glass beads dispenser propane tank heater and profile shoe heater,driven by experienced operator on road surface including cost of material,labour,T&P,cleaning the road surface of all dirt seals,oil,grease and foreign materials etc. completeas per direction of E/I as per specification DSR 16.62 unit rate 747.80 x0.735x106/107
Supply and fixing of road stud 100 x 100 mm die cast in aluminium,resistant to corrosive effect of salt and grit,fitted with lense reflectors,installed in concrete or asphaltic surface by drilling holes 30mm upto a depth of 600mm and beddded in asuitable bituminous grout or epoxy mortar ,all as per BS:873 part4 1973
Excavation in foundation in ordinary soil I/C lift upto 1.50 M & lead upto 30 M I/C filling, watering & ramming of excavated earth into the tranches or into the plinth and removal of surplus earth as directed by engineer in charge.S.I. no.251
Cement concrete with 2 cm gauge grit approved stone ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, Labour and T&P etc. required for proper completion of the work.(S.I. No. 279i)
P/L of factory made 80 mm thick interlocking cement concrete tiles(30mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding/laying of interlocking tiles leveling and dressing of surface to requried level and slope filling joints with fine sand supply and all material labour T&P etc. all complete.(New Item-1) SoR 2025
M-150 brick in 1:4 cement and Coarse sand morter in foundation and plinth including supply of all materials, labour and T& P etc. required for proper (SI No.305
12 mm thick plaster in 1:4 with cement and coarse sand mortar including supply of all materials, labour and tools & plants. required for proper completion of work. S.I. No.584(I )+Diff
Concrete with 4 cm.Gauge brick ballast fine sand of 1.25 FM in proportion of 1:6:12 and cement in foundation and under floors, including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.273
Dismantling old existing plaster including disposal of refuse as directed by the Engineer-in charge with in a distance of 60 metre(S.I. No. 706)
R.C.C. work with cement approved coarse sand and 2 cm.gauge approved stone grit in the proportion of 1:2:4 in beams & slabs excluding supply supply of reinforcement but including fixing & binding the same with 24 B.W.G. G.I. wire and including the cost of binding wire and including supply of all materials, labour and tools & plants. Royalty etc. required for the proper completion of the work. S.I. No.284
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work including supply of steel wastage beads, hooks and authorized overlapping shall be measured. S.I. No.504
Dismantling R.c.c work including stacking of material as directed by E.I. S.I. 694
Dismantling of old damaged A.C sheets and including stacking of materials as per direction E/I DSR 15.28.2
Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in charge)0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120grams per sqm as per IS: 277, in 240 mpasteel grade, 5-7 micronsepoxy primer on both side of the sheet and polyester top coat 15-18microns. Sheet should have protective guard film of 25 micronsminimum to avoid scratches duringtransportation and should be supplied in single length upto 12 metre or asdesired by Engineerin-charge. The sheet shall be fixed using self drilling /self tappingscrews of size (5.5x 55 mm) with EPDM seal, complete upto anypitch in horizontal/ vertical or curved surfaces, excluding the cost ofpurlins, rafters and trusses and including cutting to size and shape wherever D.S.R 2023 no12.50 unit rate = 738.65x0.735x106/107
Providing and fixing0.50mm thick precoated galvanised iron profile sheets ridge plain 500-600 mm including all complete as per DRS 2023 12.51.1unit rate = 532.35x0.735x106/107
Mild steel or iron work in heavy sizes such as trusses ,built up gates,doors,frames,record racks,roof work,gates etc. wrought to required form including drilling holes,rivetting or welding where necessary and also including supply of steel, bolts , nutsetc. & fixing reduired for proper completion of the work. SI 503
Dismantling cement concrete floor including stacking of dismantled materials as directed by E/I in all Complete SI No 697
Painting two coat over priming coat (encluding cost of prime coat) on steel and other metals surface with superior synthetic enamel standard make brushing to give an even shade and finish and including cleaning the surface of all dirt, dust and other foreign matters sand papering and stripping including cost of all materials, labor and T&P etc. for proper completion of the work ( S.I.3i+4i)
Finishing walls with two coat of water proof cement paint of approved quality of previously old treated surface with this paint to give an even shade including supply of all materials ,labour,and T&P required for proper completion of the work .SI 2x662
Brick soiling with straight over burnt brick laid on edge dry with brick edging on both sides including preparation of sub-grade to prescribed camber and including supply of brick, filling joints with local earth of P.I. 5-7 spreading binding coat 1 cm (3/8") depth of local earth over entire surface including labour, T&P etc. required for proper completion of the work. SI No. 762(b
Finishing walls with with water proof cement paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @2.20Kg/10 sqm Chapter No.15 13.46.1
scraping old white or colour wash including disposal of refuse as directed by E/I within distance of 60 mtr.SI 708
Dismentling of roof concrete including stacking of dismantled materials as directed by the Egineer -in-charge withing distance of 60 mtr SI 696
Providing& Fixing of M.S. Wire mesh (Murga Jali)
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineerin- Charge.D.S.R.22.22A 2023 unit rate =563.10x0.735x106/107
Distemper Two coat with oil bound distemper of approved brand manufacture and required shade on decorated wall surface to give an even shade over and excluding a priming coat with cement primerof approved brand and manufacturer after throughly brushing surfaces free from mortar droppings and other foreign matter and also including preparing the surfaces even also sand prepared smooth including cost of all amterials SI 650+651
P/L glass strips 3.15 mm thick and 3.5 cm depth joints of floors skirting dado at time of laying floors flush with floor level including supply of all material labour and T&P etc. required for proper completion of work (631b )
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete.as per Chap.14 11.41.2 Size 600mmX600mm
Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total PC work amount of first Year @ 0.00% of Total Work Amount of Hotmix area
Maintainance of Second Year @ 0.25% of Total Work Amount of Hotmix Area
Maintainance of Third Year @ 0.50% of Total Work Amount of Hotmix Area
Maintainance of Forth Year @ 0.75% of Total Work Amount of Hotmix Area
Maintainance of FifthYear @ 1.00% of Total Work Amount of Hotmix Area
Maintenance of Interlocking Surface including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total Interlocking work amount of Maintainance of first Year @ 0.00% of Total Work Amount of Interlocking Area
Maintainance of Second Year @ 0.25% of Total Work Amount of Interlocking Area
Maintainance of Third Year @ 0.50% of Total Work Amount of Interlocking Area
Maintainance of Fourth Year @ 0.75% of Total Work Amount of Interlocking Area
Maintainance of FifthYear @ 1.00% of Total Work Amount of Interlocking Area
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.30 MB
Tendernotice_2.pdf
PDF • 6.47 MB
BOQ_2079557.xls
BOQ • 0.31 MB
Ujhani12.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid