Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
25 Aug 2026, 6:00 pmDue today
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_321283_19
2ND CALL e-NIT No. 112 REW UDHAMPUR of 2026-27 Dated 17-08-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,600
18 Aug 2026
18 Aug 2026
26 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 33.98 | Kl | 167.8 | ₹5,701.84 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All Kimds of Soil | 5.14 | cum | 256.85 | ₹1,320.21 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:: Ordinary Rock | 1.63 | cum | 493.5 | ₹804.41 |
| 4 | P/L in position Cement concrete (1:5:10) 1 cement: 5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.29 | cum | 4,826.5 | ₹6,226.19 |
| 5 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 22.39 | cum | 5,733.6 | ₹1,28,375.3 |
| 6 | P/L Boulder in Plum Concrete | 9.59 | cum | 237.9 | ₹2,281.46 |
| 7 | centering and shuttering including struting ,propping etc for foundations | 60.69 | sqm | 286.35 | ₹17,378.58 |
| 8 | Carriage Of Cement ( To be paid as per actual during Execution ) | 4.11 | Tonnes | 306.18 | ₹1,258.4 |
| 9 | Carriage of Sand ( To be paid as per actual during Execution ) | 8.66 | cum | 851.54 | ₹7,374.34 |
| 10 | Carriage of Aggregate ( To be paid as per actual during Execution ) | 17.08 | cum | 409.94 | ₹7,001.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1072235.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].