| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹2.3 Cr | L1 | Accepted-AOC Bidder is First Lowest (L1) |
| 2 | L2₹2.4 Cr+₹11.3 L (4.95%)Rejected-Finance GRAM BHITOURA PO BHAWANIGANJ DISTRICT SIDDHARTHNAGAR | SIDDHARTH NAGAR | UTTAR PRADESH | 272148 | ₹2.4 Cr+₹11.3 L (4.95%) | L2 | Rejected-Finance Due to the rate Quoted by bidder being the not Lowest. |
| 3 | L3₹2.5 Cr+₹17.0 L (7.43%)Rejected-Finance | ₹2.5 Cr+₹17.0 L (7.43%) | L3 | Rejected-Finance Due to the rate Quoted by bidder being the not Lowest. |
| 4 | L4₹2.5 Cr+₹18.6 L (8.14%)Rejected-Finance N A | ₹2.5 Cr+₹18.6 L (8.14%) | L4 | Rejected-Finance Due to the rate Quoted by bidder being the not Lowest. |
| 5 | Rejected-Technical 121004 | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3 Cr
EMD Value
₹6 L
Closing Date
31 Jan 2024, 3:00 pmClosed
Superintending Engineer
Office of The Superintending Engineer 2nd Circle Irrigation Works Kanpur
Project for anti-erosion work at upstream from km 7.450 of Kadakka embankment for the protection of Kadakka embankment located on the right bank of Ramganga river in Farrukhabad district.
2024_UPIDC_883801_4
03/S.E.-II/2023-24
Open Tender
Civil Works - Others
Item Wise
90 days
Farrukhabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹6 L
Yes
Kanpur
15 Mar 2024
22 Jan 2024
31 Jan 2024
22 Jan 2024
31 Jan 2024
22 Jan 2024
23 Jan 2024
Amount
Earth work in cutting for making slope in 2:1 with proper disposal all labours and T&P required for proper completion of work.
Supplying and Stacking of split/cut stone 25-60 Kg weight including all cost of material, labour, and carriage etc.
Supply of wire crate (size1m x1m x0.50m) 4mm 8 SWG GI wire and mesh size 15cm x 15cm with double knot. Including all cost of GI wire, making wire crate labour,.T&P etc.required for proper completion of work. As per IS Specification.
Laying of stone boulder 25-60kg. in wire crate(size1m x1m x0.50 m) including all cost of labour, T&P etc. required for proper completion of work.
Supplying and Laying of GEO sheet made of 200GSM woven fabric conferming to IS 15351(2015) i/c all cost of materials, carriage, loading, unloading, stacking, all taxes etc. Required for complition of work. required for proper completion of work.
Dry stone Pitching of stone boulder 25-60 kg. in hand placed including all cost of labour, T&P etc.
Earth work in silt clearance by Hydraulic excavation JCB/Poclane and placing the excavated silt in proper place as per direction of engineer-in-charge including all cost of labour, T&P etc. for proper completion of work.
M/S MASTER CONSTRUCTION
M/S SHRI RAM VERMA CONTRACTOR
SRIVASTAVA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .