Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57,004Accepted-Finance | 1 | Accepted-Finance qualified | |
| 2 | 2₹60,297.50+₹3,293.50 (5.78%)Accepted-Finance | 2 | Accepted-Finance qualified | |
| 3 | 3₹60,304.50+₹3,300.50 (5.79%)Accepted-Finance | 3 | Accepted-Finance qualified | |
| 4 | 4₹60,978+₹3,974 (6.97%)Accepted-Finance | 4 | Accepted-Finance qualified | |
| 5 | 5₹1.0 L+₹47,238 (82.9%)Accepted-Finance | 5 | Accepted-Finance qualified |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
12 May 2020, 4:00 pmClosed
Executive Engineer
Electric Division JPDCL Udhampur
erection and maintenance of HT and LT Line and creation and augmentation of substations
2020_PDD_95945_1
ED/UDH/02 of 2020-21, Dt 21-04-2020
Open Tender
Electrical Works
Item Rate
3 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
Executive Engineer JPDCL
₹15,000
1 May 2021
22 Apr 2020
14 May 2020
22 Apr 2020
12 May 2020
22 Apr 2020
22 Apr 2020 - 27 Apr 2020
Erection/Maintenance of HT/LT Line & Creation/Augmentation of Substations
Survey for laying of 11KV Line
Route clearance/Branch cutting of trees
Unloading of 9 mtr long ST Poles at site
Unloading of 8 mtr long ST Poles at site
Unloading of 8 mtr long PCC Poles at site
Unloading of other material at site
Erection of 9 mtr long ST Pole (ST-410SP33)including pit excavation and backfilling , ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT/LT Line
Erection of 8 mtr long ST Pole (ST-410SP33)including pit excavation and backfilling , ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT /LTLine
Erection of 9 mtr long PCC Pole Including pit excavation and backfilling with ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT /LT Line
Erection of 8 mtr long PCC Pole Including pit excavation and backfilling with, ramming including fixing of 1 no. crossarm, top pin clamp and braces for HT /LT Line
Laying,Stringing,tensioning,binding of 0.02/ 0.03 ACSR (Squirrel/Weaselt conductor),fixing of hardware fittings and jointing for HT/ LT Line
Laying,Stringing,tensioning,binding of 0.05 ACSR Rabbit conductor,fixing of hardware fittings and jointing for HT/ LT Line
Laying,Stringing,tensioning,binding of 0.1 ACSR Dog conductor,fixing of hardware fittings and jointing for HT/ LT Line
Laying,Stringing,tensioning,binding of O/H AB Cable 50mm² fixing of hardware fittings and jointing for HT/ LT Line
Laying,Stringing,tensioning,binding of O/H AB Cable 120mm² fixing of hardware fittings and jointing for HT/ LT Line
Fixing of jumper sets for Tension Points including cutting of conductor of requisite length for LT Lines (set of 5 jumpers)
Fixing of jumper sets for Tension Points including cutting of conductor of requisite length for HT Lines (set of 3 jumpers )
Erection of Danger plates with clamps
Erection of Anti Climbing devices with clamps
Making and fixing of cradle guard of 8 SWG G I Wire comprising of 10 no.cross pieces per span including connection to earth on both ends
Earthing of poles complete with a spiral placed 1.5 m below ground level
Earthing of poles complete 2.5 m long with 20 mm Rod Earthing in soft soil
Earthing of poles complete 2.5 m long with 20 mm Rod Earthing in hard soil
Painting of ST poles .crossarms,clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Painting of crossarms,clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Erection of Guy Rod complete with guy insulator 2 no, turn buckles 2 no 1.8 m long 16mm dia solid GS Stay rod, anchor plate (200x200x6mm)2 no.,7/3.15 mm Guy wire complete
Cement bottoming as per REC Standards in 1:2:4 mix 0.5cum /pole including cost of material
Fixing of crossarms with clamps upto and including 3feet
Fixing of crossarms with clamps above 3ft and including 6feet
Fixing of crossarms with clamps above 6ft and including 9feet
Fixing of MS V crossarms
Fixing of braces
Fixing of 1 no. Pin insulator /Shackle insulator including pin etc.on LV Lines
Fixing of 1 no. Pin insulator /Shackle insulator including pin etc.on 11KV Lines
Unloading of 25 KVA Transformer at site
Unloading of 63KVA Transformer at site
Unloading of 100KVA Transformer at site
Unloading of 250KVA Transformer at site
Unloading of 400KVA /630 KVA Transformer at site
Loading of new/dismantled 25 KVA Transformer at site
Loading of new/dismantled 63KVA Transformer at site
Loading of new/dismantled 100KVA Transformer at site
Loading of new/dismantled 250KVA Transformer at site
Loading of new/dismantled 400KVA /630 KVA Transformer at site
Dragging/carriage of 25 KVA Transformer at site upto 50 mtrs
Dragging/carriage of 25 KVA Transformer at site for every additional 50 mtrs beyond first 50 mtrs
Dragging/carriage of 63/100 KVA Transformer at site upto 50 mtrs
Dragging/carriage of 63/100 KVA Transformer at site for every additional 50 mtrs beyond first 50 mtrs
Dragging/carriage of 250 KVA /300 KVA Transformer at siteupto 50 mtrs
Dragging/carriage of 250 KVA /300 KVA Transformer at site for every additional 50 mtrs beyond first 50 mtrs
Dragging/carriage of 400 KVA /630KVA Transformer at site upto 50 mtrs
Dragging/carriage of 400 KVA /630KVA Transformer at site upto 50 mtrs
Installation of 11KV Lightening Arrestor
Installation of G.O Set including fixing of crossarms for mounting the set
Installation of HG Fuse Set including fixing of crossarms for mounting the set
Fixing of crossarm bed for placement of Transformer
Mounting of Transformer on crossarm bed including HV/LV Earting connections for 25KVA
Mounting of Transformer on crossarm bed including HV/LV Earting connections 63KVA/ 100KVA
Mounting of Transformer on crossarm bed including HV/LV Earting connections for 250KVA DT /400KVA DT
Mounting of Transformer on platform bed including HV/LV Earting connections for 630 KVA DT
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating ,making end connections upto 25KVA
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating ,making end connections ABOVE 25KVA upto 100KVA
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating ,making end connections Above 100KVA upto 630KVA
Wherever required fixing of backup protection of fuses on busbar insulators and connecting .
Replacement of damaged Disc insulators with hardware fitting in each tension stringing
Fixing of top clamp for Pin Insulators
Fixing of U/D clamp for LV Shackle Insulators
Crimping of thimbles to the cable ends for replacement/repair worksupto 70mm sq
Crimping of thimbles to the cable ends for replacement/repair works above 70 mm sq upto 185mm sq
Crimping of thimbles to the cable ends for replacement/repair works above 185mm sq
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of PCC poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of PCC poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of PCC poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of PCC poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ACSR condutor//Steel/accessories from stacking site to erection site for every additional 50 mtrsIN SEMI HILLY AREAS
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ST poles 9m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of ST poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ST poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of PCC poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of PCC poles9m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of PCC poles 8m from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of PCC poles 8m from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of ACSR Weasel condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ACSR Weasel condutor//Steel/accessories from stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
M/S HARSH VARDHAN CHAND
RAGHAV SARIN
M/s GCS Associates
MAHA SHAKTI ELECTRICAL WORKS
M/S SUDAN CONSTRUCTION
M/S Rakul Laira
M/S JCM CONSTRUCTIONS
M/S VAISHNO TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .