Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Bidder has not uploaded Formats 1 to 8 in excel sheets. As per clause No. 15.10 page no. 37 of 159 of tender document, Hence, the bid is not considered for evaluation. |
| Sl No | Description | Qty | Unit | Gimmy K Thomas L1 |
|---|---|---|---|---|
| 1.00 | PART-A CIVIL WORKS
Providing and laying autoclaved aerated cement blocks masonry with 100/ 150mm/200mm mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor II level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. | 85 | CuM | 10,999 ₹9.3 L |
| 2.00 | Providing Solid Concrete Bricks of size 225x100x75mm having strength 5Mpa & above for superstructure above plinth level in all shapes and sizes with Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machineries & other incidental charges complete as per the direction of engineer incharge of work. | 25 | CuM | 12,500 ₹3.1 L |
| 3.00 | Providing and laying cement plaster 15mm thick for internal surfaces of walls and columns at all Floor and heights in CM 1:6, rubbed perfectly so as to obtain smooth and even finish including close hacking of concrete surface wherever required, scaffolding, curing etc. complete as per specification and as directed by the Engineer in-charge. | 1,100 | SqM | 425 ₹4.7 L |
| 4.00 | Rendering smooth finish; using Birla White Putty in One /Two Coats over internal plastered surfaces of wall; concrete & ceiling including rubbed perfectly so as to obtain smooth & even finish, providing; fixing & removing necessary staging / platform, preparation of base properly by cleaning & washing, Base shall be fully neat, clean & dry before application of putty, cleaning the work area & disposing the debris / waste materials / unwanted materials / things etc., upto a lead of 2000 meters outside the pheriphery of work premises etc. complete all as per specification and as directed by the Engineer-in-charge at all locations and at all lifts / heights. | 1,500 | SqM | 150 ₹2.3 L |
| 5.00 | Providing and applying One coat of primer and Two coats Silicon & Acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces paint of approved brand and shade on internal wall / ceiling surfaces as per manufacturer's specifications, roller-finish including preparation of surface and scrapping the old paint wherever required, fixing jointing tape on gypsum panel joints, wherever required, scaffolding (Payment for the scaffolding shall be made under relevant item), cleaning the areas, protection of furniture, carpet etc, complete and as directed by Engineer-In-Charge. | 1,500 | SqM | 366 ₹5.5 L |
| 6.00 | Providing and applying One coat of primer and Two coats of Synthetic enamel paint of approved brand and shade as per manufacturer's specifications. roller-finish on wood or steel surfaces including preparation of surface and scrapping the old paint wherever required, fixing jointing tape wherever required, scaffolding , cleaning the areas, protection of furniture, carpet etc, complete and as directed by Engineer-In-Charge. | 100 | SqM | 323 ₹32,300 |
| 7.00 | Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:
1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no.
2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.
3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs. 4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.) | 100 | SqM | 1,350 ₹1.4 L |
| 8.00 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different size 600mm x 600mm with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement morter or cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, including grouting of joints (Payment for grouting of joints to be made separately). | 700 | SqM | 1,750 ₹12.3 L |
| 9.00 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor wall with size 600 mm x1200 mm with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, including grouting of joints (Payment for grouting of joints to be made separately). | 420 | SqM | 2,299 ₹9.7 L |
| 10.00 | Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including filling / grouting and finishing complete as per direction of Engineer-in-charge. | 1,120 | SqM | 299 ₹3.3 L |
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
23 Apr 2026, 5:00 pmClosed
Associate Director (QA), NPCIL-HQ
NPCIL, Head Quarter-Mumbai
Conversion of First floor into Guest rooms of RAQC cum Transit Accommodation at Bengaluru, Karnataka.
2026_NPCIL_267003_2
CPPP/2026/113
Open Tender
Construction Works
243 days
Bengaluru QA Office
As per Tender document
5 documents required · 5 mandatory
₹0
₹5.3 L
Office of Incharge - C and MM (WG) Kaiga Site
23 Jun 2026
28 Mar 2026
25 Apr 2026
28 Mar 2026
23 Apr 2026
9 Apr 2026
28 Mar 2026 - 4 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PART-A CIVIL WORKS
Providing and laying autoclaved aerated cement blocks masonry with 100/ 150mm/200mm mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor II level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. | 85 | CuM | 10,371 | ₹8,81,535 | item1 |
| 2 | Providing Solid Concrete Bricks of size 225x100x75mm having strength 5Mpa & above for superstructure above plinth level in all shapes and sizes with Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machineries & other incidental charges complete as per the direction of engineer incharge of work. | 25 | CuM | 11,951 | ₹2,98,775 | item2 |
| 3 | Providing and laying cement plaster 15mm thick for internal surfaces of walls and columns at all Floor and heights in CM 1:6, rubbed perfectly so as to obtain smooth and even finish including close hacking of concrete surface wherever required, scaffolding, curing etc. complete as per specification and as directed by the Engineer in-charge. | 1,100 | SqM | 363 | ₹3,99,300 | item3 |
| 4 | Rendering smooth finish; using Birla White Putty in One /Two Coats over internal plastered surfaces of wall; concrete & ceiling including rubbed perfectly so as to obtain smooth & even finish, providing; fixing & removing necessary staging / platform, preparation of base properly by cleaning & washing, Base shall be fully neat, clean & dry before application of putty, cleaning the work area & disposing the debris / waste materials / unwanted materials / things etc., upto a lead of 2000 meters outside the pheriphery of work premises etc. complete all as per specification and as directed by the Engineer-in-charge at all locations and at all lifts / heights. | 1,500 | SqM | 130 | ₹1,95,000 | item4 |
| 5 | Providing and applying One coat of primer and Two coats Silicon & Acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces paint of approved brand and shade on internal wall / ceiling surfaces as per manufacturer's specifications, roller-finish including preparation of surface and scrapping the old paint wherever required, fixing jointing tape on gypsum panel joints, wherever required, scaffolding (Payment for the scaffolding shall be made under relevant item), cleaning the areas, protection of furniture, carpet etc, complete and as directed by Engineer-In-Charge. | 1,500 | SqM | 326 | ₹4,89,000 | item5 |
| 6 | Providing and applying One coat of primer and Two coats of Synthetic enamel paint of approved brand and shade as per manufacturer's specifications. roller-finish on wood or steel surfaces including preparation of surface and scrapping the old paint wherever required, fixing jointing tape wherever required, scaffolding , cleaning the areas, protection of furniture, carpet etc, complete and as directed by Engineer-In-Charge. | 100 | SqM | 282 | ₹28,200 | item6 |
| 7 | Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:
1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no.
2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.
3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs. 4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.) | 100 | SqM | 880 | ₹88,000 | item7 |
| 8 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor with different size 600mm x 600mm with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement morter or cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, including grouting of joints (Payment for grouting of joints to be made separately). | 700 | SqM | 1,609 | ₹11,26,300 | item8 |
| 9 | Providing and laying Vitrified tiles with thickness 9-10 mm in floor wall with size 600 mm x1200 mm with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, including grouting of joints (Payment for grouting of joints to be made separately). | 420 | SqM | 2,343 | ₹9,84,060 | item9 |
| 10 | Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including filling / grouting and finishing complete as per direction of Engineer-in-charge. | 1,120 | SqM | 272 | ₹3,04,640 | item10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.89 MB
Tendernotice_2.pdf
PDF • 4.17 MB
Tendernotice_3.pdf
PDF • 0.80 MB
Retenderdocument.pdf
Tender Documents • 2.87 MB
Technicalbiddocument.rar
Other Document • 0.03 MB
BOQ_318843.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid