Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-Finance | ₹5.6 L | 1 | Accepted-Finance Being L1 |
| 2 | 2₹5.6 L+₹8,646.13 (1.56%)Accepted-Finance | ₹5.6 L+₹8,646.13 (1.56%) | 2 | Accepted-Finance Being L2 |
| 3 | 3₹6.9 L+₹1.3 L (24.0%)Accepted-Finance | ₹6.9 L+₹1.3 L (24.0%) | 3 | Accepted-Finance Being L3 |
| 4 | 4₹7.0 L+₹1.4 L (25.7%)Accepted-Finance | ₹7.0 L+₹1.4 L (25.7%) | 4 | Accepted-Finance Being L4 |
Tender Value
₹6.7 L
EMD Value
₹13,302
Closing Date
23 Apr 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
Renovation - Upgradation of existing poly house located at MP Farm Panchawati, Rangat.
2026_APWD_22639_1
118/DB/CD-I/RGT/2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
Panchawati
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹13,302
5 May 2026
8 Apr 2026
23 Apr 2026
8 Apr 2026
23 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | |||||
| 1.1 | All kinds of soil | - | sqm | - | - |
| 2Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | |||||
| 3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 3.1 | All kinds of soil. | - | cum | - | - |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.1 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 5Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | |||||
| 6Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. | |||||
| 6.1 | On steel work | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
TenderDocument.pdf
Tender Documents • 16.24 MB
BOQ_23986.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .