Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance | 1 | Accepted-Finance satisfied | |
| 2 | 2₹2.2 L+₹2,000 (0.93%)Accepted-Finance | 2 | Accepted-Finance satisfied | |
| 3 | 3₹2.3 L+₹12,500 (5.81%)Accepted-Finance | 3 | Accepted-Finance satisfied |
Tender Value
₹3.3 L
EMD Value
₹3,400
Closing Date
9 Jan 2020, 2:00 pmClosed
Additional Chief Engineer / Mechanical-I / MTPS-I
Office of the Additional Chief Engineer / Mechanical -I Mettur Thermal Power Station - I Mettur Dam-636406
MTPS I Mill Plant Unit II Clearing the Mill rejects from Unit II Mill Feeder area weighing in departmental weigh bridge etc
2019_EB_151889_1
ACE/ M-I / MTPS-I / MP / OT. 449 / 2019-20
Open Tender
Power/Energy Projects/Products
Works
120 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹3,400
Yes
13 Jan 2020
27 Dec 2019
10 Jan 2020
27 Dec 2019
9 Jan 2020
27 Dec 2019
Amount
Loading mill rejects / released chocked Coal Collected Near Mill / Feeder Area from Unit- II, weighing in departmental weigh bridge and transporting to reject yard “G”/ switch yard area / coal yard/ by using Contractor’s vehicle and unloading the same and return.
S DEEPAN CONTRACTOR
SURIYA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .