| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.8 LAccepted-Finance | 1 | Accepted-Finance being lowest | |
| 2 | 2₹13.6 L+₹1.8 L (15.6%)Rejected-Finance | 2 | Rejected-Finance Not being lowest | |
| 3 | 3₹15.4 L+₹3.6 L (30.3%)Rejected-Finance | 3 | Rejected-Finance Not being lowest |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
14 Mar 2023, 3:00 pmClosed
Executive Engineer ICD Matatila
Office of The Executive Engineer ICD Matatila
CONSTRUCTION OF PIPE D-XING AT Km 5.400 OF BABINA RIGHT MAIN CANAL LOT 4
2023_UPIDC_780667_4
05/EE/2022-23
Open Tender
Civil Works
Item Rate
90 days
Babina District Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹35,000
16 Mar 2023
6 Mar 2023
15 Mar 2023
6 Mar 2023
14 Mar 2023
6 Mar 2023
Amount
Earth work in Excavation of foundation in All type of strata such as with Mar,Rankar Kabar weathered rock and hard rock mixed with soft rock or soft rock including all lift and lead including labour T & P for proper completion work.
Excavation of hard rock by blasting including cost of explosive,drilling removal of rock and stacking with all lift and lead including T & P for proper completion work.
Excavation of Granite rock by blasting including cost of explosive,drilling removal of rock and stacking with all lift and lead including T & P for proper completion work.
Earth work in back filling with Mar,Rankar Kankar mixed soil in structure including manual compaction dressing including labour T & P for proper completion work.
Providing/fixing Centering & shuttering for R.C.C. work including all material & T&P etc. for proper completion of work.
Laying C.C. 1:3:6 i/c laying, ramming, curing and including cost of material, labour , T&P for proper comletion of work.
R. C.C. work 1:1.5:3 i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. for proper completion of work .
Laying C.C. 1:2:4 including laying, ramming, curing and with cost of all material, labour , T&P for proper completion of work .
Laying N.P.-3 Pipe 1200 mm dia including all cost of labour, material and T&P for proper completion of work.
Providing & laying steel for reinforcement including cost of steel,labour for cutting,Bending placing in position & binding with G.I. wire with all T&P required for completion of work .
M/S RADHIKA RAMAN YADAV THEKEDAR
DEVENDRA SINGH THEKEDAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .