| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | ₹5.1 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹5.5 LRejected-Finance | ₹5.5 L | 2 | Rejected-Finance Rejected |
| 3 | 3₹5.5 LRejected-Finance | ₹5.5 L | 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Sathish Kumar & Co L2 | T.SANKARESWARAN CONTRACTOR L1 | hariharan L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing heavy Jungle and disposing away from site including cost of T&Ps, labour, lead, lift, etc., complete. | 495 | m² | 8 ₹3,960 | 3 ₹1,485 Lowest | 8 ₹3,960 |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B. | 48 | m³ | 300 ₹14,400 | 180 ₹8,640 Lowest | 250 ₹12,000 |
| 3.00 | Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. | 6 | m³ | 2,000 ₹12,000 | 1,800 ₹10,800 Lowest | 1,905 ₹11,430 |
| 4.00 | Plain cement concrete in CC 1:3:6, using 40mm HBG metal without form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 6 | m³ | 5,600 ₹33,600 | 5,100 ₹30,600 Lowest | 5,850 ₹35,100 |
| 5.00 | Plain cement concrete in CC 1:2:4, using 20mm HBG metal for foundation including cost of all materials, labour charges, consolidation, curing, lead, lift, etc., complete (but excluding cost of reinforcement). | 6 | m³ | 6,500 ₹39,000 | 6,000 ₹36,000 Lowest | 6,850 ₹41,100 |
| 6.00 | Plain cement concrete in CC 1:2:4, using 10 - 20mm HBG metal with form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 25 | m³ | 6,500 ₹1,62,500 | 6,300 ₹1,57,500 Lowest | 6,750 ₹1,68,750 |
| 7.00 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. | 480 | kgs | 86 ₹41,280 | 84 ₹40,320 Lowest | 89 ₹42,720 |
| 8.00 | Supplying and fixing in position GI angle 75x75x6mm and 65x65x6mm for corner/ intermediate fence post with 2nos. of 30mm length cleats of size 45x45x6mm angle and back support of 50x6mm GI flats, including cost of all materials, transporting, labour, Galvanising, welding and cutting charges, lead and lift etc., complete and placing in position as directed by Site Engineer. | 1,010 | kgs | 86 ₹86,860 Lowest | 99 ₹99,990 | 102 ₹1,03,020 |
| 9.00 | Supplying and fixing of Chain link fencing 2"x2" using 10 gauge GI Wire of approved quality including cost of all materials, labour charges, lead, lift, etc., complete as per standard specification. | 179 | m² | 400 ₹71,600 | 270 ₹48,330 Lowest | 281 ₹50,299 |
| 10.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹41,868 | 9 ₹39,029.85 Lowest | 9 ₹42,154.11 |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
16 Mar 2026, 2:00 pmClosed
SE/CEDC/North/CBE
O/o, The Superintending Engineer, CEDC/North, Coimbatore
SE/CEDC/N/CBE/C/No.34/25-26
2026_EB_668216_1
SE/CEDC/N/CBE/C/No.34/2025-26
Open Tender
Civil Works
Works
120 days
Saravanampatty SS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,900
Yes
27 Jul 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
16 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing heavy Jungle and disposing away from site including cost of T&Ps, labour, lead, lift, etc., complete. | 495 | m² | - | - |
| 2 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B. | 48 | m³ | - | - |
| 3 | Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. | 6 | m³ | - | - |
| 4 | Plain cement concrete in CC 1:3:6, using 40mm HBG metal without form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 6 | m³ | - | - |
| 5 | Plain cement concrete in CC 1:2:4, using 20mm HBG metal for foundation including cost of all materials, labour charges, consolidation, curing, lead, lift, etc., complete (but excluding cost of reinforcement). | 6 | m³ | - | - |
| 6 | Plain cement concrete in CC 1:2:4, using 10 - 20mm HBG metal with form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 25 | m³ | - | - |
| 7 | Providing steel reinforcement with MS/RTS rods of reputed approved make for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, minor T&Ps labour charges for cutting, straightening bending as per type design drawing, placing aligning and tying properly with all leads and lift etc., complete as per standard specification. | 480 | kgs | - | - |
| 8 | Supplying and fixing in position GI angle 75x75x6mm and 65x65x6mm for corner/ intermediate fence post with 2nos. of 30mm length cleats of size 45x45x6mm angle and back support of 50x6mm GI flats, including cost of all materials, transporting, labour, Galvanising, welding and cutting charges, lead and lift etc., complete and placing in position as directed by Site Engineer. | 1,010 | kgs | - | - |
| 9 | Supplying and fixing of Chain link fencing 2"x2" using 10 gauge GI Wire of approved quality including cost of all materials, labour charges, lead, lift, etc., complete as per standard specification. | 179 | m² | - | - |
| 10 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_802850.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].