| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAdmitted-Finance HOTEL OMNI PLAZA 175 MANJI KA HATTA PAOTA B ROAD JODHPUR RAJASTHAN 342 001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹48.9 L | L1 | Admitted-Finance |
| 2 | L2₹49.2 L+₹26,902.95 (0.55%)Admitted-Finance | ₹49.2 L+₹26,902.95 (0.55%) | L2 | Admitted-Finance |
| 3 | L3₹55.1 L+₹6.2 L (12.7%)Admitted-Finance | ₹55.1 L+₹6.2 L (12.7%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical FLAT NO 401 TULSANI HEIGHTS 4TH FLOOR GREEN PARK SOCIETY AKURDI GURUDWARA TO WALHEKAR WADI ROAD CHINCHWAD PUNE 411033 | PUNE | MAHARASHTRA | 411033 | - | - | Rejected-Technical REJECTED DUE TO RELATED FIRM MS TULSANI ASS |
| Sl No | Description | Qty | Unit | Aksher Construction Company L1 | T.H.ASSOCIATES L3 | TUSHANT CHOUDHARY L2 |
|---|---|---|---|---|---|---|
| 1.00NOTE: Schedule ‘A’ Part I to VIII are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-13 only. | ||||||
| 1.01 | Construction of "Coock house and Dining hall for CEIJ course trg area" complete all as shown on architectural drawing submitted by department and structural design drawing RCC structure etc submitted by contractor on approval by department complete all as specified,shown on drgs and as directed by Engineer- in - Charge | 1 | LUMP SUM | 42,43,333 ₹42,43,333 Lowest | 47,50,000 ₹47,50,000 | 42,55,000 ₹42,55,000 |
| 1.02 | Total amount of Sch 'A' Part-II (INTERNAL WATER SUPPLY) | 1 | LUMP SUM | 20,000 ₹20,000 Lowest | 35,000 ₹35,000 | 28,500 ₹28,500 |
| 1.03 | Total amount of Sch 'A' Part-III (INTERNAL ELECTRIC SUPPLY) | 1 | LUMP SUM | 1,30,000 ₹1,30,000 Lowest | 1,46,000 ₹1,46,000 | 1,33,000 ₹1,33,000 |
| 1.04 | Total amount of Sch 'A' Part-IV (EXTERNAL WATER SUPPLY) | 1 | LUMP SUM | 25,000 ₹25,000 | 28,500 ₹28,500 | 24,700 ₹24,700 Lowest |
| 1.05 | Total amount of Sch 'A' Part-V (EXTERNAL ELECTRIC SUPPLY) | 1 | LUMP SUM | 25,000 ₹25,000 | 58,000 ₹58,000 | 24,700 ₹24,700 Lowest |
| 1.06 | Total amount of Sch 'A' Part-VI (SEWAGE DISPOSAL) | 1 | LUMP SUM | 1,15,000 ₹1,15,000 Lowest | 1,25,001 ₹1,25,001 | 1,18,750.95 ₹1,18,750.95 |
| 1.07 | Total amount of Sch 'A' Part-VII (PATH / HARD STANDING) | 1 | LUMP SUM | 85,000 ₹85,000 Lowest | 94,000 ₹94,000 | 88,350 ₹88,350 |
| 1.08 | Total amount of Sch 'A' Part-VIII (SITE CLEARANCE, EXCAVATION EARTHWORK) | 1 | LUMP SUM | 80,000 ₹80,000 Lowest | 95,000 ₹95,000 | 85,500 ₹85,500 |
| 2.00SCHEDULE 'A' PART-IX (Miscellaneous) NOTE: Schedule ‘A’ Part II to VIII items which are not Prepriced by MES are given here under, Bidders shall insert their rate in Column No-13 only and the Estimated rate indicated as "0.0" are for that purpose. | ||||||
Tender Value
₹44.7 L
EMD Value
₹89,500
Closing Date
25 Aug 2026, 6:00 pmClosed
CWE Khadki Pune
Headquarters CWE Khadki, Military Engineer Services, Range Hills Road, Khadki, Pune-411003
PROVISION OF COOK HOUSE AND DINING HALL NEAR BLDG NO P 539 UNDER GE (CME) KHADKI
2026_MES_763308_2
CWE/KKE/TOKEN-142 OF 2024-25
Open Tender
Civil Works
Lump-sum
180 days
CWE Khadki Pune
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE CME KHADKI
₹89,500
18 Sept 2026
18 Jul 2026
28 Aug 2026
18 Jul 2026
25 Aug 2026
10 Aug 2026
18 Jul 2026 - 1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of "Coock house and Dining hall for CEIJ course trg area" complete all as shown on architectural drawing submitted by department and structural design drawing RCC structure etc submitted by contractor on approval by department complete all as specified,shown on drgs and as directed by Engineer- in - Charge | 1 | LUMP SUM | 38,19,760 | ₹38,19,760 |
| 1.02 | Total amount of Sch 'A' Part-II (INTERNAL WATER SUPPLY) | 1 | LUMP SUM | 14,706.18 | ₹14,706.18 |
| 1.03 | Total amount of Sch 'A' Part-III (INTERNAL ELECTRIC SUPPLY) | 1 | LUMP SUM | 1,36,739.44 | ₹1,36,739.44 |
| 1.04 | Total amount of Sch 'A' Part-IV (EXTERNAL WATER SUPPLY) | 1 | LUMP SUM | 20,208.28 | ₹20,208.28 |
| 1.05 | Total amount of Sch 'A' Part-V (EXTERNAL ELECTRIC SUPPLY) | 1 | LUMP SUM | 27,394.4 | ₹27,394.4 |
| 1.06 | Total amount of Sch 'A' Part-VI (SEWAGE DISPOSAL) | 1 | LUMP SUM | 1,06,130.94 | ₹1,06,130.94 |
| 1.07 | Total amount of Sch 'A' Part-VII (PATH / HARD STANDING) | 1 | LUMP SUM | 90,929.68 | ₹90,929.68 |
| 1.08 | Total amount of Sch 'A' Part-VIII (SITE CLEARANCE, EXCAVATION EARTHWORK) | 1 | LUMP SUM | 89,275.68 | ₹89,275.68 |
| 2SCHEDULE 'A' PART-IX (Miscellaneous) NOTE: Schedule ‘A’ Part II to VIII items which are not Prepriced by MES are given here under, Bidders shall insert their rate in Column No-13 only and the Estimated rate indicated as "0.0" are for that purpose. | |||||
| 2.01 | Supply and lay double wall corrugated (DWC) high density polythene pipes having corrugation on the outer wall and plain surface on the inner wall confirming to IS 16205 & IS14930 ( Part I and II) for protection of under ground cable of size 40 mm outer dia with all fittings such as clamps. coupler etc laid in trenches / road / nallah or fixed along wall. poles or laid under floor (including cutting floor/Road and making good to match with existing adjoining surface etc) for cable protection complete all as specified
Note :- Excavation and earth work shall be measured and paid separately under revant item of Schedule | 95 | RM | 45 | ₹4,275 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tenderdocus.pdf
Tender Documents • 2.87 MB
BOQ_873187.xls
BOQ • 0.40 MB
coriigendum6aug.pdf
PDF • 0.49 MB
corrigendumdrg.pdf
PDF • 30.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .