| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹55.7 LAccepted-AOC CONTRACTOR NAMAKKAL | NAMAKKAL | TAMIL NADU | 636142 | ₹55.7 L | 1 | Accepted-AOC L1 |
| 2 | 2₹55.8 LRejected-AOC 4 205 EAST STREET THUTHIKULAM POST KALAPPANAICKENPATTY SENDAMANGALAM TALUK NAMAKKAL DISTRICT 637 404 | NAMAKKAL | TAMIL NADU | 637404 | ₹55.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | NTC Infra & Engineering Pvt Ltd L1 | SS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Pillaikalathur – Pallathottam road (Via) Eswarankoil Road KM 0/0-1/100 | |||||
| 2.00Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | |||||
| 3.00 | Km 0/000-1/100 | 792 | Sqm | 6.36 ₹5,037.12 | 6.36 ₹5,037.12 |
| 4.00Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | |||||
| 5.00 | Km 0/000-1/100 | 400 | Sqm | 23.36 ₹9,344 | 23.36 ₹9,344 |
| 6.00Collection and supply of gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement . | |||||
| 7.00 | Km 0/000-1/100 | 371.25 | Cum | 341.13 ₹1.3 L | 342 ₹1.3 L |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/000-1/100 | 495 | Cum | 2,831.32 ₹14.0 L | 2,831.32 ₹14.0 L |
| 10.00Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | |||||
Updated dates
Tender Value
Refer Docs
EMD Value
₹56,500
Closing Date
23 Feb 2026, 12:00 pmClosed
The Project Director
The Project Director
Improvements to the Road fromPillaikalathur Pallathottam road (Via) Eswarankoil Road KM 0/0-1/100R -140 at Paramathy Block in Namakkal District under Nabard RIDF 2026-27 With five year Maintenance Pkg.No21/NKL/Nabard/2026-27
2026_RDTN_657193_21
DIPR/981/Tender/2026
Open Tender
Civil Works - Roads
180 days
Paramathy
Required Documents as Per Schedule
4 documents required · 4 mandatory
₹0
₹56,500
DRDA Namakkal
3 Mar 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
23 Feb 2026
15 Feb 2026
17 Feb 2026
Pillaikalathur – Pallathottam road (Via) Eswarankoil Road KM 0/0-1/100
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for 1.50m Span Culvert at
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 2 :4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Reinforced Cement concrete 1 : 1.5 :3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Centering for Sides and Soffits including cost and conveyance of materials and labour charges etc complete.
Below GL
above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 20mm Bitumen felt for expansion joint between drit wall & Deck slab
Providing and fixing Tar paper for Bearing between Bed Block & Deck Slab
Providing weepholes in plain concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement .
Provision for 1.50m Span Culvert at
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 2 :4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Reinforced Cement concrete 1 : 1.5 :3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Centering for Sides and Soffits including cost and conveyance of materials and labour charges etc complete.
Below GL
above GL
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 20mm Bitumen felt for expansion joint between drit wall & Deck slab
Providing and fixing Tar paper for Bearing between Bed Block & Deck Slab
Providing weepholes in plain concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement .
Road Making with Hot Applied Thermoplastic Compound with reflectorising Glass Beads on Bitumen Surface
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
60cm Equilaterial triangle sign board
60cm Circular Sign Board
Supply and Fixing of H.M Stones etc.,
Supply and Fixing of K.M Stones etc.,
Provision for Scheme Name Board Charges etc
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
21.pdf
Tender Documents • 1.65 MB
BOQ_788708.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid