| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L Quoted ₹11.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.5 L+₹20,576.23 (1.82%)Rejected-Finance | ₹11.5 L+₹20,576.23 (1.82%) | L2 | Rejected-Finance L2 |
| 3 | L3₹11.8 L+₹51,445.42 (4.55%)Rejected-Finance | ₹11.8 L+₹51,445.42 (4.55%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/s Nugong Trader L3 | M/s Aryan Construction L1 | M/s Rolling Stone Enterprise L2 |
|---|---|---|---|---|---|---|
| 1.00 | Surface dressing of the ground, including removing vegetation and inequalities not exceeding 15 cm depth and disposal of rubbish, lead upto 50 m and lift upto 1.50 m. b) Hard Soil | 260.96 | Sqm | 17.93 ₹4,679.01 | 17.15 ₹4,475.46 Lowest | 17.46 ₹4,556.36 |
| 2.00 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 54.48 | Cum | 341.44 ₹18,601.65 | 326.59 ₹17,792.62 Lowest | 332.53 ₹18,116.23 |
| 3.00 | Centring and shuttering including strutting proping etc. and removal of form work for: a) Foundations and plinth. Since in item Nos, 9(a) to (c), the material can be used 8 times, the quantity is taken as 1/8th of required quantity. | 24.91 | Sqm | 422.25 ₹10,518.25 | 403.89 ₹10,060.9 Lowest | 411.23 ₹10,243.74 |
| 4.00 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 17.59 | Cum | 5,767.12 ₹1,01,443.64 | 5,516.38 ₹97,033.12 Lowest | 5,616.68 ₹98,797.4 |
| 5.00 | Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel | 3,455 | Kg | 107.34 ₹3,70,859.7 | 102.67 ₹3,54,724.85 Lowest | 104.54 ₹3,61,185.7 |
| 6.00 | Brick work with best available local bricks in foundations and plinth in cement mortar 1:4 (1 cement : 4 fine sand). | 6.21 | Cum | 9,873.03 ₹61,301.64 | 9,443.76 ₹58,636.31 Lowest | 9,615.47 ₹59,702.45 |
| 7.00 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 50.41 | Cum | 9,462.89 ₹4,77,016.06 | 9,051.46 ₹4,56,276.23 Lowest | 9,216.03 ₹4,64,572.06 |
| 8.00 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 53.97 | Cum | 1,025.39 ₹55,338.38 | 980.8 ₹52,931.94 Lowest | 998.64 ₹53,894.73 |
| 9.00Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads. | ||||||
| 9.01 | C/F Sand | 85.37 | Cum | 322.63 ₹27,543.89 | 308.61 ₹26,346.96 Lowest | 314.22 ₹26,825.9 |
Tender Value
₹10.3 L
EMD Value
₹21,000
Closing Date
4 Dec 2024, 5:00 pmClosed
Group Senior Manager (Electrical).
Siang Lower HE Project, NHPC Office Complex, Adjacent to Smart City Office, Pasighat, East Siang District, Arunachal Pradesh-791102.
Foundation work for prefabricated G plus 1 staff accommodation building.
2024_NHPC_835649_1
NH/SIANGLOWER/NIT/2024/04
Limited
Civil Works
Item Rate
90 days
NHPC Office Complex, Pasighat.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,000
31 Jul 2026
20 Nov 2024
9 Dec 2024
20 Nov 2024
4 Dec 2024
20 Nov 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .