Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.5 L
Closing Date
9 Oct 2023, 8:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rural Development and Panchayat Raj Department
Suneel K
MATERIAL SUPPLY FOR NRLM SHED
RDPR/2023-24/IND0166
RDPR/2023-24/IND0166
Open
Electronic Documents, First(One Cover)
RDPR Taluka Panchayat Office Honnavar
3 documents required · 3 mandatory
₹500
Exempted
27 Sept 2023
27 Sept 2023
7 Oct 2023
Transportation loading and unloading at 1% on material (Honnavar1)
Tools and Plants at 2% on material (Honnavar1)
HOM of cutting and grinding machine1 (Honnavar1)
Mechanic Class II/Mechanic HmP Grade I/EME Grade (Honnavar1)
Anticorrosive bitumastic paint (Honnavar1)
M.S Square Rod 12x12 (Honnavar1)
vertical M.S Square Rod 20 mm x20mm (Honnavar1)
MS Hollow pipe B Class 14 Gauge 50 mm dia (Honnavar1)
Stone Aggregate (single size) 10 mm Nominal size (Honnavar1)
Stone Aggregate (single size) 20 mm Nominal size (Honnavar1)
Add White lead paint, gasket, cement, sand for making good the wall and floor at 2% on Material (Honnavar1)
Licenced Plumber with tools (Honnavar1)
Lead or PVC connection pipe 32mm dia (for wash basin) (Honnavar1)
Brackets for flushing cistern (Honnavar1) C.I/M.S
Brass stop cock (Honnavar1)
CP brass waste 32 mm of standard pattern (Honnavar1)
CP brass chain with plug (Honnavar1)
Copper plated brass piller tap 15mm (Honnavar1)
White vitreous china clay flat back wash basin size 550x400mm (Honnavar1)
Handling loading and unloading 3% on Material (Honnavar1)
Labour charges for lifting and placing in position and making connection at 7% on Material (Honnavar1)
Polyenthylene water storage tank of specified capacity L (Honnavar1)
Add Gum / gangiwater / fevical and blue at 10% of lime cost (Honnavar1)
Burnt lime/shell lime (Honnavar1)
Add Brush, putty, glue at 5% on cost of paint (Honnavar1)
Whitening (Honnavar1)
Dry distemper (Honnavar1)
White cement (Honnavar1)
Ceramic tiles 30 x 30 cms (Honnavar1)
Add HOM of welding and grinding machine at 2% on Material (Honnavar1)
Fabricator (Honnavar1)
Thick plain glass 5.50 mm (Honnavar1)
Chrominum plated screws (Honnavar1)
Cleat angles (Honnavar1)
Alluminium handles - 15 mm (Honnavar1)
Alluminium tower bolt - 20 cm (Honnavar1)
PVC edge beading (Honnavar1)
Rubber beading for shutters beading (Honnavar1)
Nylon rollers (Honnavar1)
Aluminium window frame section 1.20 mm thick (Honnavar1)
Honnewood planks for panels 20 mm thick (Honnavar1)
Honne wood (Honnavar1)
HOM of Machinaries for planing (Honnavar1)
Add cutting and other wastage 5% (Honnavar1)
Mathi/Nandi wood planks for panels 25 mm thick (Honnavar1)
Vitrified tiles 600x600 mm (Honnavar1)
Add Handling , loading and unloading at 1% on Material (Honnavar1)
Add sundries charges at 2 % on Material (Honnavar1)
Casurina poles 100 - 150 mm (Honnavar1)
Casurina Poles 75 - 100 mm dia (Honnavar1)
Jungle wood runners and planks (Honnavar1)
Silver oak or equivalent planks 38 mm thick (Honnavar1)
Add watering charges at 1 % on Labour (Honnavar1)
Add sundries charges at 1 % on Labour (Honnavar1)
Stone Chistler Class II (Honnavar1)
Mason Class II (with tools) (Honnavar1)
Mason Class I (with tools) (Honnavar1)
Mixer (concrete small used in culvert) (Honnavar1)
Latrite (Honnavar1)
Unit Cost as per the Specification (Honnavar1)
Tools & plants and electrical charges at 2% (Honnavar1)
Add Brush at 1% on cost of paint (Honnavar1)
Enamel metal paint (Honnavar1)
Add Handling , loading and unloading at 2% on Material (Honnavar1)
Add providing and removing scaffolding at 3% on Labour (Honnavar1)
Painter Class I (Honnavar1)
Add Wire brush, fine steel wool, putty, sand paper, at 3% on cost of paint (Honnavar1)
Ready mix primer paint (Ready mix red lead paint) (Honnavar1)
HOM of cutting and grinding machine (Honnavar1)
Add (Honnavar1)
HOM of welding and grinding machine (Honnavar1)
Welder Grade I (Honnavar1)
Corbon electrodes (Honnavar1)
Anchor Bolts 750mm (Honnavar1)
Base plate / base plate (Honnavar1)
Gusset plates 6 mm thick (Honnavar1)
MS angle iron 40mm x 40mm x 6mm, 23 Mtr in length at 3.5 Kg per Mtr (Honnavar1)
MS angle iron 50mm x 50mm x 6mm, 33.8 Mtr in length at 4.5 Kg per Mtr (Honnavar1)
Binding wire (Honnavar1)
TMT bars Fe 500 (Honnavar1)
HOM of Vibrator 0.71 days (Honnavar1)
Plasticizer / super plasticizer (Honnavar1)
Over Head & other Miscellaneous Charges (Honnavar1)
Add sundries charges at 1 % on Material (Honnavar1)
Add watering charges at 1 % on Material (Honnavar1)
Mixer (concrete) - 1 Cum Capacity (Honnavar1)
Portland Cement (Honnavar1)
Coarse sand (zone III) (Honnavar1)
Broken stone aggregate 12 mm to 10 mm size (Honnavar1)
Broken stone aggregate 20 mm size (Honnavar1)
Broken stone aggregate 40 mm size (Honnavar15)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Navilgon.docx
Tender Document • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .