| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹47.3 L+₹11.2 L (30.8%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L2₹47.3 L+₹11.2 L (30.8%)Admitted-Finance | L2 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical Term Condition not qualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Term Condition not qualified |
| Sl No | Description | Qty | Unit | Dinesh Traders L2 | M/s Gayatri Enterprises L2 | M/S Maa Bhawani Electricals L1 |
|---|---|---|---|---|---|---|
| 1.00Supply of Materials | ||||||
| 1.01 | TOP/T-OFF/DROPPER/FUSE SET/GUARDING ANGLE Clamp | 1,314 | No | 265 ₹3,48,210 | 265 ₹3,48,210 | 172 ₹2,26,008 Lowest |
| 1.02 | Stone Pad 300 X 300 X 75 mm. | 607 | No | 125 ₹75,875 | 125 ₹75,875 | 79 ₹47,953 Lowest |
| 1.03 | PG clamp for Dog Conductor. | 10 | No | 225 ₹2,250 | 225 ₹2,250 | 172 ₹1,720 Lowest |
| 1.04 | Cross arms holding clamp | 173 | No | 225 ₹38,925 | 225 ₹38,925 | 172 ₹29,756 Lowest |
| 1.05 | LT CLAMPS | 571 | No | 295 ₹1,68,445 | 295 ₹1,68,445 | 172 ₹98,212 Lowest |
| 1.06 | Dead End Clamp For End & Turning | 197 | No | 130 ₹25,610 Lowest | 130 ₹25,610 Lowest | 167 ₹32,899 |
| 1.07 | IPC Connector For DB | 816 | No | 90 ₹73,440 Lowest | 90 ₹73,440 Lowest | 162 ₹1,32,192 |
| 1.08 | Mid Span Jointer | 83 | No | 110 ₹9,130 | 110 ₹9,130 | 62 ₹5,146 Lowest |
| 1.09 | Eye Hook | 454 | No | 210 ₹95,340 | 210 ₹95,340 | 68 ₹30,872 Lowest |
Tender Value
₹63 L
EMD Value
₹63,000
Closing Date
7 Nov 2025, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Near Electricity Workshop Chilbila Pratapgarh
Shifting work of 11 KV, LT lines and transformers in village Lalganj-Manjhanpur-Mau road (LINE SHIFTING FROM BHAGWAN TIRAHA KUNDA TO MANGARH DHAM MANDIR) under Electricity Distribution Division Kunda, Pratapgarh on semi turnkey basis including loadin
2025_PVVNV_1084393_1
48/EDCP/2025-26
Open Tender
Electrical Works
Lump-sum
90 days
E.E. EDD Kunda Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
S.E. EDC Pratapgarh
₹63,000
7 Nov 2025
21 Oct 2025
7 Nov 2025
21 Oct 2025
7 Nov 2025
21 Oct 2025
Supply of Materials
TOP/T-OFF/DROPPER/FUSE SET/GUARDING ANGLE Clamp
Stone Pad 300 X 300 X 75 mm.
PG clamp for Dog Conductor.
Cross arms holding clamp
LT CLAMPS
Dead End Clamp For End & Turning
IPC Connector For DB
Mid Span Jointer
Eye Hook
PG clamp for ACSR Weasel
Danger Board with Clamp.
Bolts, Nuts and washers.
Aluminium paint.
Red oxide paint.
Errection Work
Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole Single pole HT Line with complete fitting as per respo norms. (This work includes grouting and earthing of pole)
Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole Single pole LT Line with complete fitting as per respo norms. (This work includes grouting and earthing of pole)
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of ACSR Dog conductor.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of ACSR weasel conductor.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of ACSR Rabit conductor.
Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR Raibit conductor and binding with insulator.
Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR weasel conductor and binding with insulator.
Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR DOG conductor and binding with insulator.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of LT PVC 3.5*150sqmm Cable
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying & Hanging (Distance 30-70 K.M.) of 11 KV XLPE Cable 3*185 sqmm.
Painting work of STP 13M, 11M & 9M with Alluminium & Red Oxide paints
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and laying & Hanging (Distance 30-70 K.M.) of L T ABC CABLE (3X120+1X95+1X16) sqmm.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of L T ABC CABLE (3X120+1X95+1X16) sqmm.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site and installation work (Distance 30-70 K.M.) of 3 Phase distrubution box
DISMENTAL OF OLD LINE
LINE SHIFTING IN OLD CABLE DISCONNCECTION & RE CONNCECTION
Safe carriage of following capacity Transformers from Old Site To New Site and mounting at double pole with energization as per respo norms.
Complete stay grouting and nozzaling as per respo norms. (All material providing of contractor)
Old Received back material
Iran scrap
Aluminium scrap
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
SP_48.rar
Tender Documents • 0.76 MB
BOQ_1987098.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .