Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.9 Cr Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | ₹30.9 Cr | L1 | - |
| 2 | L2₹33.6 Cr+₹2.6 Cr (8.55%)Financial bid opened Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | ₹33.6 Cr+₹2.6 Cr (8.55%) | L2 | Financial bid opened |
| 3 | L3₹33.6 Cr+₹2.7 Cr (8.82%) Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | ₹33.6 Cr+₹2.7 Cr (8.82%) | L3 | - |
| 4 | L4₹33.9 Cr+₹3.0 Cr (9.66%)Financial bid opened Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | ₹33.9 Cr+₹3.0 Cr (9.66%) | L4 | Financial bid opened |
| 5 | L5₹34.1 Cr+₹3.1 Cr (10.1%) Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I). | ₹34.1 Cr+₹3.1 Cr (10.1%) | L5 | - |
| Sl No | Description | Qty | Unit | A& T INFRACON PRIVATE LIMITED L4 | AADHAR STUMBH INFRA PVT LTD L8 | Credible Engineering Construction Projects Ltd. L9 | ELDORADO TECHNOLOGIES LIMITED L1 | PAVE INFRASTRUCTURE PRIVATE LIMITED L5 | R N A CONSTRUCTION L3 | TRIBENI CONSTRUCTIONS LIMITED L10 | A.K Builders L6 | RSB Infrastructure Private Limited L7 | Vijay Construction Company, Bhuj L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | SH: Earthwork, culvert / causeway extension work, toe wall, Gabion wall , New Design Fencing & dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S = 1.43 km & B.P. No. 800/4-S to 806/7-S = 16.165 km, Total Length = (1.43 + 16.165) = 17.595 Kms (Package-I) | - | - | -30.62 ₹33,90,54,142.58 | -22.77 ₹37,74,16,423.05 | -21.06 ₹38,57,73,047.21 | -36.73 ₹30,91,95,093.7 Lowest | -30.32 ₹34,05,20,216.99 | -31.15 ₹33,64,64,077.78 | -18.15 ₹39,99,93,969.01 | -28.25 ₹35,06,36,130.44 | -27.32 ₹35,51,80,961.12 | -31.32 ₹33,56,33,302.28 |
Tender Value
₹48.9 Cr
EMD Value
₹58.9 L
Closing Date
6 Jan 2026, 3:00 pmClosed
EE(C ), BFD-IV, Coochbehar
Aditya Kumar
O/o Executive Engineer, BFD-IV, IBBZ-II,CPWD, Panthsala Road, Cooch Behar
Replacement of Border Fencing Phase-I (in between BP No. 798/MP to 830/7-S -39.00 Km) to single row modular fencing including earthwork, culvert work, toe walls in various stretches of North Bengal along Indo-Bangladesh Border (IBB). SH Earthwork, culvert / causeway extension work, toe wall, Gabion wall, New Design Fencing and dismantling of existing Phase-I Fence etc. from BP No. 798/MP (actual BP No. 799/6-S) to 800/1-S - 1.43 Km and BP No. 800/4-S to 806/7-S - 16.165 Km, Total Length - (1.43 plus 16.165) - 17.595 Kms (Package-I).
137482
14/CE/IBBZ-II/SE/BFC-II/EE/BFD-IV/2025-26
OPEN
Civil Works - Others
NCB
630 days
Coochbehar, West Bengal
14 documents required · 14 mandatory
₹58.9 L
Not Applicable
6 Jan 2026
22 Dec 2025
6 Jan 2026
6 Jan 2026
6 Jan 2026
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+NO14+PKG-1+BFDIVCOB.pdf
document • 13.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .